DCIT40 AFS update 20150421.ppt

Federal Aviation
Administration
Flight Standards
Update
Presented to: DCIT 40 Plenary
By: Mark Patterson, FAA, AFS-470
Date: 23 April 2015
AC 120-70C
• 17 March - posted for public comment
• 16 April - comments due (87 comments rcvd)
• 20-24 April - adjudicating comments (depends on
number of comments and complexity)
• 27 April – changes to tech writer (planned)
• Then - time needed to:
– Approve tech writer changes
– Additional coordination depending on changes
– Management approval to publish
Expected publish date – JUNE
Federal Aviation
Administration
2
N8900.A056 & A056 templates
•
•
•
•
•
•
•
17 March - entered formal coord (FAST TRACK)
3 April - comments due (missing responses)
13 April - received all comments
13-15 April - adjudicated comments
16 April - changes to tech writers
23 April - final version rcvd - needs approval
14 May - tentative publish date
Schedule allows operators/inspectors:
• ~ 12 wks prior to SLC IOC
• ~ 16 wks prior to IAH IOC
Federal Aviation
Administration
3
Part 129 (foreign carriers)
•
•
•
•
AFS-50 (int’l) has lead
Operators request authorization from POI / IFO
Will not require a separate A056 OpSpec
Authorization annotated on their A003
Operators required to have CAA data link
approval / authorization prior to FAA authorization
Federal Aviation
Administration
4
N8900.A003 & A003 template
• 16 April - entered formal coordination
• 21 April - comments due (AFS-1 priority)
• 24-27 April - adjudicate comments (time depends on
number/complexity of comments)
• 28 April - changes back to tech writers (planned)
• TBD - tentative publish date
A back-up plan has been approved if documents get delayed in
coordination and/or publishing process
Federal Aviation
Administration
5
Part 129 (foreign carrier) actions (proposed)
Provide responsible IFO with evidence State of the
Operator approved them for data comm ops
Approval must include:
• A statement from the State of the Operator’s CAA showing:
– the foreign air carrier is approved for data link communication in
accordance with XXXX (ex. ICAO GOLD) criteria
– the aircraft and aircraft equipment are eligible and approved for data link
communication
– the flight crews are trained to conduct data link communication
•
•
•
•
Approved data link system make and model (M/M)
Each Aircraft M/M/S
Procedures for using data link communication
Any other pertinent information
Federal Aviation
Administration
6
Part 129 (foreign carrier) actions (proposed)
After POI and PAI agree they have CAA authorization
and they are eligible for data link ops in the NAS
Issue a revised A003
Federal Aviation
Administration
7
Questions?
Federal Aviation
Administration
8
Food for thought
(as of 23 April 2015)
Operators with FAA A056 = 486
Part 121 (U.S. Carriers) = 11 (varying fleets)
DCIT participants = 5
Part 129 (Foreign Carriers) = 0 (no need)
Parts 91K / 125 / 125M / 135 = 39
Part 91 (A056 not needed for CPDLC-DCL) = 436
Applications currently being evaluated = 60
Federal Aviation
Administration
9
Operators with Existing A056 & DCL Trials Participant
6/15/2015
OpSpec Issued for CPDLC DCL
5/15/2015
A056 Template Notice Issued
7/28/2015
IAH "File and Fly"
6/14/2015
SLC "File and Fly"
4/1/2015
3/1/2015
5/1/2015
8/4/2015
HOU "File and Fly"
6/1/2015
7/1/2015
8/1/2015
8/11/2015
3/11/2015 - 5/10/2015
Draft CPDLC DCL Bulletin (Training)
5/16/2015 - 6/15/2015
Notice Approval Window (30d)
Submission of Updated A056 Template
Submission of CPDLC DCL Bulletin
Operators without Existing A056
4/20/2015 - 5/14/2015
Update Existing Training Plan,
5/15/2015
Draft Bulletin, Etc.
A056 Template Notice Issued
4/16/2015
Initial A056 Application Submit
6/15/2015
OpSpec Issued for CPDLC DCL
7/28/2015
IAH "File and Fly"
6/14/2015
SLC "File and Fly"
4/1/2015
5/1/2015
6/1/2015
8/4/2015
HOU "File and Fly"
7/1/2015
8/1/2015
3/1/2015
8/11/2015
5/16/2015 - 6/15/2015
Notice Approval Window (30d)
Submission of Updated A056 Template
Submission of CPDLC DCL Bulletin
3/11/2015 - 4/14/2015
Submit Initial Training Plan, Draft Bulletin, Etc.
International Operators
3/11/2015 - 8/9/2015
Local CAA Approval + Coordination with US FAA POI (A003) [Ongoing]
4/1/2015
5/1/2015
6/1/2015
7/1/2015
8/1/2015
3/1/2015
8/11/2015
Federal Aviation
Administration
A056 Snapshot (as of 23 April 2015)
DCIT operator A056 application status
• Opr A – waiting for Load 12 before adding B737 to A056
• Opr B – contact with POI, no application submitted to
add B737 to A056
• Opr C – contact with POI, intent letter submitted for initial
A056, full application not submitted
High risk of these applications not being
approved prior to IOC
Federal Aviation
Administration
11
So…
What is Flight Standards doing to reach those
475 (and growing) operators that are not DCIT
participants?
Besides the many briefs we’ve given (GAMA,
NBAA, NACA, OSWG, etc)…
Federal Aviation
Administration
12
Information for Operators (InFO)
InFO (Information for Operators)
• AFS tool to get information to all operators in FAA database
– Hi-level explanation of the CPDLC-DCL service
– Will provide a general game plan (waterfall / IOC timeline)
– Show where to find more information (AFS-470 web site)
• Prior to publishing, I need:
– Flight Deck User’s Guide finalized (ops system)
– DCIT avionics configurations recommendations
– Lessons-learned document
– ACF 15-01 decision (charting options, airport pubs, etc)
– Dispatch docs (ISD/CRD/SDB, end-to-end, etc)
Federal Aviation
Administration
13
Federal Aviation
Administration
14