Key Site Timelines Federal Aviation Administration Hal Ludwig Data Comm Federal Aviation Administration 1 Key Site Timelines 8/7 KSLC IOC KSLC 7/16 07/19/15 - 7/26 - 08/01/15 7/27 - 8/7 Dry Interval Runs Description File and Fly 08/01/15 07/01/15 09/01/15 09/20/15 9/3 KIAH IOC KIAH 8/19 08/20/15 - 8/27 - 09/03/15 8/28 - 9/3 Dry Interval RunsDescription File and Fly 08/01/15 09/01/15 07/01/15 9/10 KHOU IOC KHOU 8/24 08/26/15 - 9/2 - 09/08/15 9/3 - 9/10 KHOU Dry Runs File and Fly 08/01/15 09/01/15 07/01/15 Data Comm 09/20/15 09/20/15 Federal Aviation Administration 2 KSLC – Carrier DFV Participation Lead-Up Timeline 5/20 Coordinate Detailed KSLC DFV Schedule with Participants 3/25 KSLC Coordination Meeting 8/7 KSLC IOC 7/27 - 8/7 6/1 Final Test Scripts Provided to Participants 7/16 - 7/26 Apr-15 May-15 Mar-15 Jun-15 Jul-15 Aug-15 Aug-15 5/23 - 6/4 End State AOC Interface Testing 8/7 KSLC IOC 7/16 - 7/18 Testing w/ WJHTC 7/16 7/16 -- 7/26 7/26 Dry Run w/ Tech Center Avionics and Carrier KSLC DFV Dry Run 7/27 7/27 - 8/7 - 8/7 DFV - File and Fly Flights KSLC DFV Conduct Jul-15 Aug-15 7/19 - 7/26 Testing w/ Carrier Data Comm Federal Aviation Administration 3 Testing Window (Tentative) ERAM KSLC Date Testing w/ WJHTC 07/16 – 07/18 Th, F, Sa Mid-Shift Test mode Testing w/ Carrier 07/19– 07/20 Su, M Mid-Shift Test mode 07/21 – 07/26 Tu, W, Th, F, Sa, Su Tue-Fri: Mid-Shift or Day & Swing Shift (as Aircraft avail.) 10:45 – 13:00 15:00 – 16:15 17:00 – 18:30 Sat-Sun: Open Testing w/ Carrier Carrier File and Fly 7/27 – 8/07 IOC 8/7 Normal Ops Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Active and BackUp mode Active and Backup mode Note: Mid-Shift is 2200-0300 or 0500 (Local) Data Comm Federal Aviation Administration 4 KIAH – Carrier DFV Participation Lead-Up Timeline 5/18 IAH Coordination Meeting Coordinate Detailed KIAH DFV Schedule with Participants 7/14 Final Test Scripts Provided to Participants 8/19 - 8/27 Jun-15 Jul-15 Aug-15 8/28 - 9/3 9/3 KIAH IOC Sep-15 May-15 Sep-15 9/3 KIAH IOC 8/19 - 8/21 Testing w/ WJHTC 8/19 - 8/27 8/19 - 8/27 Dry Run w/ Tech Center Avionics and Carrier KIAH DFV Dry Run Aug-15 Data Comm 8/28 8/28 - 9/3 - 9/3 DFV - File and Fly Flights KIAH DFV Conduct Sep-15 8/22 - 8/27 Testing w/ Carrier Federal Aviation Administration 5 KIAH Date Testing Window Tentative Testing w/ WJHTC 08/19 – 08/21 W, Th, F Mid-Shift Test mode Testing w/ Carrier 08/22 – 08/23 Sa, Su Mid-Shift Test mode Testing w/ Carrier 08/24 – 08/27 M, Tu, W, Th Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 08/28 – 09/03 F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC 9/3 ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Note: Mid-Shift is 2200-0300 or 0500 (Local) Data Comm Federal Aviation Administration 6 KHOU – Carrier DFV Participation Lead-Up Timeline 5/12 KHOU Coordination Meeting Coordinate Detailed KHOU DFV Schedule with Participants 9/10 KHOU IOC 7/9 Final Test Scripts Provided to Participants 9/3 - 9/10 8/24 - 9/2 Jun-15 Jul-15 Aug-15 Sep-15 May-15 Oct-15 Oct-15 9/10 KHOU IOC 8/24 - 8/26 Testing w/ WJHTC 8/24 - 9/2 8/24 - 9/2 Dry Run w/ Tech Center Avionics and Carrier KHOU DFV Dry-Run Aug-15 9/3 9/3- 9/10 - 9/10 DFVKHOU - File and DFVFly Conduct Flights KHOU DFV Conduct Sep-15 8/27 - 9/2 Testing w/ Carrier Data Comm Federal Aviation Administration 7 KHOU Date Testing Window Tentative Testing w/ WJHTC 08/24 – 08/26 M, Tu, W Mid-Shift Test mode Testing w/ Carrier 08/27 – 08/28 Th, F Mid-Shift Test mode Testing w/ Carrier 08/29 – 09/02 Sa, Su, M, Tu, W Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 009/03 – 09/10 Th, F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC 9/10 ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Note: Mid-Shift is 2200-0300 or 0500 (Local) Data Comm Federal Aviation Administration 8 AOC Interface Scorecard AOC Test Activity % Complete ARINC implementation of 6 SMHP Messages 100% IFCET implementation of TDLS-CSP IRD / ICD 100% Verify TDLS to CSP Connectivity 100% Verify TDLS to CSP to AOC Connectivity 100% Verify TDLS to AOC Message exchange 100% TDLS to UPS CCI/CCA exchange 100% Issues Notes PTR 726 Verified on 6/10/2015 TDLS to SWA CCI/CCR/CCA/CCP and GRM/GIR exchange 0% Scheduled for 6/17/15 Planned for 6/18/15; working SWA through ARINC routing TDLS to FedEx CCI and GRM exchange 0% Planned for 6/24/15 TDLS to Delta AOC Production 0% Planned for 6/30/15 Data Comm Federal Aviation Administration 9 Interop Plans • Interop with Boeing B737 & MD-11 platforms – June 17 & June 18 • Interop with other Boeing bench configurations every Wed /Thursday for the remainder of June – These additional opportunities are there for us as needed, so we will assess the need accordingly on a weekly basis. • Working Interop plans and schedule with Airbus platforms as well Data Comm Federal Aviation Administration 10 Discussion Items • TDLS Updated IRD Review – IRD Rev A has NAS CCB approval • Interface is available for test (WJHTC and IFCET) – IRD Rev B pending NAS CCB approval • SDB Inputs – No change to SDB User’s Guide – Will use legacy process to make changes while waiting for final approvals to activate and test the Web Portal. • Aircraft Registrations with Hyphens – Fix will be available September 2015 • Daily Test Coordination Meeting Data Comm Federal Aviation Administration 11