DCIT17_DCL_Trials_PlenaryMAKIv1.ppt

Data Communications
Program
Departure Clearance
(DCL) Trials
DCIT17
To:
DCIT Plenary
From:
Matt Maki, Trials Lead
Date:
08.23.2012
Federal Aviation
Administration
Agenda
•
•
•
DTAP Development Status
Trials Activities/Schedule/Testing Status
Questions
Federal Aviation
Administration
2
DTAP Milestone Deliveries and CHI
Design Review Summary
•
SE2020 Contract Deliverables/DTAP Development Ongoing:
Initial Operational DTAP delivery to FAATC 8/20
- 2 DTAP machines delivered (3rd machine to Thane 8/27)
DTAP Functional testing commencing 8/23
FDIO Echo Port interface development ongoing
PTR process in place
DTAP System Training commencing 8/22
•
OT&E Testing scheduled for Sept 10-14:
NATCA CHI reps early look last week in Aug
New NATCA reps participating in OT&E testing
Federal Aviation
Administration
Boeing/Airbus DTAP Non-Formal
Testing
•
Completed/On-going testing with Boeing and
Airbus B777, B747, B737, MD-11, A330/340 test
benches:
- AFN, DM25/UM73 messaging
- pDTAP and DTAP configurations
•
Upcoming live testing next week with aircraft:
- AFN, DM25/UM73 messaging
- Tuesday - UPS
- Wednesday – UPS / UAL / FDX / DAL
- Thursday - FDX (Sandy attending)
Federal Aviation
Administration
DCL Trials Activities Status
•
Trials Activities In Process/Complete:
Trials Test NCPs (3) – 2 approved, 1 pending
-
-
Draft Training and Trials Planning materials complete
-
-
Oct 29 – Nov 9 MEM Training planned
DTAP equipment site pre-installation work 8/28-8/31
-
-
CAT6, media converters, rack config, monitor/keyboard
FAA ISSM/FTI approvals and provisioning
-
-
NAS CCB scheduled for 8/31
FTI provisioning ordered
FEP build out at ATL by 9/8
ISSM testing at FAATC 8/23
Pilot, Controller Trials Feedback Surveys in development
(Supports Analysis and Metrics)
Federal Aviation
Administration
FAATC DTAP Test Status
•
DTAP non-Formal Release TEST opportunities
•
•
•
Able to test with Boeing air lab utilizing multiple flight deck configurations
1.
Successful ground / ground and air/ground connectivity verification
2.
Successful AFN logons
3.
Successful CPDLC message exchanges
4.
Identified instances of problematic DTAP areas, which are accounted for in the formal release
Able to test with Airbus air lab utilizing multiple flight deck configurations
1.
Successful ground / ground and air/ground connectivity verification
2.
Successful AFN logons
3.
Not able to establish CPDLC communications, which is accounted for in the formal DTAP release
DTAP Formal Release
•
Install and check out 8/20/2012
•
Begin formal end to end functional tests 8/23/2012
•
Utilize Boeing and Airbus avionics flight decks
•
Utilize FAA Laboratory avionics
•
To the extent possible, utilize DCIT aircraft
Federal Aviation
Administration
6
DCL Trials Test Timeline (updated: 8/10/2012)
Tech Center DTAP E-E Functional
Testing (DTAP 1)
DTAP
1&2
pDTAP
AFN and CPDLC connect
with Airbus event (Aug 6-8)
(B1)
Aug 17
May 10
• pDTAP / HADDS in box test
• pDTAP / HADDS via FNTB Failover
/ Rev # test
• pDTAP / HADDS / CSP Interface
via FNTB + bench Avionics
• pDTAP (applicable reqs/VRTM)
testing with bench avionics
• pDTAP testing via Boeing +
Airbus air labs
• PTR fixes / regression
• Test Cases document final
• pDTAP Quick Look Report
(B1) = CAF, UM73, CHI, AFN
Video crew @
Tech Center
event (Sept. 13)
DCL & AFN attempt with
DCIT aircraft pre-arranged
event (Aug 28, 29 & 30)
Conduct
Training
Controller OT&E (35)
Controllers
early look &
feel (Aug.
29)
Oct 29
Dry &
Prep
Dry run &
prep
AFN and CPDLC connect
with Boeing event (July 31,
Aug 3, 7, 11)
Thales install & checkout
DTAP 1&2
setup/prep
SAT @ MEM
(B2)
Aug 22 Sept 3
(B4)
Nov 30
Conduct
Sept 7
Sept 14
• Controller OT
 Prep / Dry run & Conduct
• System test case / bench avionics
+ TC aircraft
• System test case / Boeing air lab
• System test case / Airbus air lab
• System test case / DCIT aircraft
• Error conditions / failover
• PTR fixes / regression
• 8/23/1012: Security Assessment
• Regression with B2 (in lab)
• DTAP Test Report
(B2) = Adds UM79, AOC CC (no ack)
(B3)
Oct 1
Sept 17
•
•
•
•
•
•
•
•
Nov 12
Install & checkout
Training
SAT sub_test cases final
SAT sub_test cases functional
testing/ FedEx aircraft
E-E Operational scenarios based
on DCIT v1.0 doc / FedEx aircraft
Error conditions / failover in field
env.
Regression with B3 (in lab & in
field)
SAT Test Report
(B3) = Adds UM80, AOC CC ACK
(B4) = Adds UM83, FDIO (possibly in B3)
Questions ?
KMEM
Federal Aviation
Administration