031113_MEM_EWR_ATCT_DCL_TrialsV1.ppt

Data Communications
Program
MEM/EWR ATCT DCL Trials
PMR Update
To:
Jesse Wijntjes, Program Mgr
From:
Gregg Anderson, Matt Maki,
Pete Muraca
Date:
03.11.2013
Federal Aviation
Administration
Agenda
•
MEM Trials Build 4.5 Limited Ops Summary
•
MEM Schedule Milestones
•
Build 6.0 Functional Testing Status
•
EWR Trials Schedule/Activities
•
Trials Timeline
•
Trials Budget
Federal Aviation
Administration
2
Build 4.5 Limited Ops Trials Complete
Date
Call Sign
FANS CPDLC DCL
DCL Result
Jan 17
FDX303 KMEM-KMIA
Cleared As Filed (CAF) Sent
FD - WILCO
Jan 18
FDX303 KMEM-KMIA
CAF Planned - Cancelled
AC Mechanical
Jan 22
FDX9056 KMEM-KMEM
CAF Planned
SW Failure – PTR
Jan 29
FDX303 KMEM-KMIA
CAF, UM79 Sent
FD – WILCO (2)
Feb 8
FDX993 KMEM-KOAK
Cleared As Filed (CAF) Sent
FD - WILCO
Feb 14
FDX303 KMEM-KMIA
CAF, UM79, UM79 Sent
FD – WILCO (3)
Feb 21
FDX303 KMEM-KMIA
CAF, UM79, UM79 Sent
FD – WILCO (3)
Feb 26
FDX303 KMEM-KMIA
CAF, UM79, UM79 Sent
FD – WILCO (3)
March 5
FDX303 KMEM-KMIA
CAF, UM79, UM79 Planned
HADDS Outage
March 6
FDX303 KMEM-KMIA
CAF, UM79, UM79 Planned
AFN, SW Failure
Federal Aviation
Administration
3
MEM Schedule Milestones
•
The Milestone Schedule Outlook:

-
•
Build 6 WJHTC Installation Complete: March 4
Build 6 WJHTC/MEM Functional/Pre-SAT Testing: March 4-20
MEM Limited Full Functionality Trials (3 Ops/day): March 26 – April 26
MEM Full FANS Fleet 24x7 Trials Start: April 30
4pm Daily Build 6 Testing/PTR review telcon
Limited Full Functionality Trials on track for March 26:
-
Goal is 50 flight DCL operation shakeout
-
•
Minimum 35, 20 MD-11, 15 B777
DTAP Build 7 Formal Requirement Development Underway
-
Thales starting scope/cost development for FAA review
Federal Aviation
Administration
4
EWR Trials Schedule/Activities
•
EWR DTAP4 Hardware scheduled for pickup at Thales on
March 15:
Will be driven to EWR ATCT
•
EWR DTAP4 equipment, cables and display installation at
EWR ATCT confirmed for the week of March 18
•
Team met with UPS on March 6 in Louisville:
UPS confirmed EWR Trials participation
UPS to provide live aircraft for ramp FANS/DCL testing
during Pre-SAT and SAT testing at both MEM and EWR
Initial MOU comments back from UPS
Federal Aviation
Administration
5
Federal Aviation
Administration
6
Questions ?
KUSA
Federal Aviation
Administration