Agenda
•
MEM / EWR Operational Trials Status
•
MEM / EWR Trials Results
•
Patch 5 / Build 7 Status
•
MEM FDIO Test NCP Extension Status
Federal Aviation
Administration
2
MEM Trials Status Update
•
Full 24x7 Operations proposed for August 13 start:
-
B777 full functionality
MD11 only CAF until DTAP modification in place (send double TO
points on UM79)
All MD11 flights affected – Domestic and International
MEM ATC will process only MD11 CAF UL
Non Route Revision UL to MD11 will be sent (DEP FREQ, EDCT,
Etc.)
Pending final approvals/procedure training (CMO, MEM ATC, FDX)
EWR UPS AND FDX MD11 DCL OPS STILL FULL
FUNCTIONALITY (Limited Trials Mode)
Federal Aviation
Administration
3
EWR Trials Status Update
•
Airbus researching FMS issue affecting current SAS A333
operations:
UL/DL latency issues with older FMS configurations
SAS currently standing down until analysis complete
•
Active participants utilizing the service:
-
•
UPS (MD11)
BAW (B777)
DLH (A343, A346)
SAS (A333)
FDX (MD11, B777) – Starting July 20
UAL (B767) – Starting July 21
Draft MOUs sent to BAW, SAS, DLH:
-
Execution planned by end of SWAP season (Fall)
Federal Aviation
Administration
4
MEM DCL Ops Since 4/17/13 Start of Limited Ops Trials
CAF
Initial
UM79
Initial
UM80
UM79
Rev
UM80
Rev
Total
UM
WILCO
Aircraft
Airline
Total DCL
Flights
MD11
FDX
30
29
0
1
5
4
39
B777
FDX
10
9
0
1
4
0
14
Current Up Thru 7/17/13
Federal Aviation
Administration
5
MEM DCL Ops Since 4/17/13 Lessons Learned
Unplanned
Voice
Clearance/
PDC
Issued
FRC DCL Filing
Issues
(Not Filed or Within
First 22
Characters) and/or
Crew Status (Not
DCL Approved)
DTAP
Automation –
FANS Avionics
Issues/Testing
HADDS/
CSP/
Network
Issues
ATC/FD
Coordination
AC
Mechanical/
Diversions
20
12
3
2
2
1
Current Up Thru 7/17/13
Federal Aviation
Administration
6
EWR DCL Ops Since 5/16/13 Start of Limited Ops Trials
CAF
Initial
UM79
Initial
UM80
UM79
Rev
UM80
Rev
Total
UM
WILCO
4
4
0
0
4
2
10
FDX
3
2
1
0
0
0
3
B777
BAW
7
7
0
0
0
0
7
A333
SAS
2
1
1
0
0
0
2
A343/6
DLH
2
2
0
0
0
0
2
Aircraft
MD11
Airline
Total DCL
Flights
UPS
Current Up Thru 7/17/13
Federal Aviation
Administration
7
EWR DCL Ops Since 5/16/13 Lessons Learned
Unplanned
Voice
Clearance/
PDC
Issued
FRC DCL Filing
Issues
(Not Filed or Within
First 22
Characters) and/or
Crew Status (Not
DCL Approved)
DTAP
Automation –
FANS Avionics
Issues/Testing
HADDS/
CSP/
Network
Issues
ATC/FD
Coordination
AC
Mechanical/
Diversions
17
6
5
3
1
2
Current Up Thru 7/17/13
Federal Aviation
Administration
8
DTAP Patch 5 and Build 7 Status
•
DTAP Patch 5 Requirements Updated:
-
•
Addition of requirement to send double TO point in UM79 uplinks
(MD11 issue)
EWR ATC Requirements (Dual Contact / Drop Down Remarks,
NONE ALT and SID)
Subject to SE2020 approval
Estimated Fall delivery
Build 7 Scope, Schedule Cost Proposal from Harris by 7/25:
-
FAA options to select specific functionality based on schedule/cost
consideration
Build Contract Acceptance and Delivery to FAA currently TBD
Federal Aviation
Administration
9
MEM FDIO Test NCP Extension
Approved to NAS CCB
•
NCP number assignment Notification at 07/16/2013 09:14
AM CDT
ID: Case File JW925-FDIO-1003
NCP/CCD: P34982
Title: MEM ATCT Data Communications Trials Automation
Platform (DTAP) Connection to a FDIO/PCRCU Echo Port
(Extension of JW925-FDIO-1001/T34501)
Message: NCP number: 34982 has been assigned to Case
File: JW925-FDIO-1003 and submitted to NAS CCB for
processing.
Federal Aviation
Administration
10
Questions ?