MSM Long Lead (Military M83401/24) Datasheet

MSM Long Lead (Military M83401/24)
www.vishay.com
Vishay Dale
Thick Film Resistor Networks, Military, MIL-PRF-83401 Qualified,
Type RZ240, Single-In-Line, Molded SIP
FEATURES
• Isolated, bussed, and dual terminator schematics available
• MIL-PRF-83401 qualified
• 0.195" (4.95 mm) “A” maximum seated height
• Thick film resistive elements
• TCR available in “K” (± 100 ppm/°C) or “M” (± 300 ppm/°C)
characteristic
• All device leads are hot-solder dipped
• Rugged molded case construction
• Compatible with automatic insertion equipment
• 100 % screen tested per group A, subgroup 1 of
MIL-PRF-83401
• All devices are capable of passing the MIL-STD-202,
method 210, condition D “Resistance to Soldering Heat”
test
• Available in tube pack
STANDARD ELECTRICAL SPECIFICATIONS
VISHAY DALE
MODEL/
PIN NO/
PROFILE
POWER
POWER
TEMPERATURE
RATING RESISTANCE
MIL
RATING
TOLERANCE (1) COEFFICIENT (2) WEIGHT
MIL
RANGE
SPEC. SCHEMATIC ELEMENT PACKAGE
STYLE
±%
(-55 °C to +125 °C)
g
P70 °C

SHEET
P70 °C
± ppm/°C
W
W
MSM10A-01-S4
MSM10A-03-S2 RZ240
24
MSM10A-05-S3
01 (C)
0.12
1.08
03 (G)
0.12
0.60
10 to 1M
10 to 1M
05 (H)
0.07
1.08
Consult factory
1, 2, 5
100, 300
0.6
Notes
• DSCC has created a drawing to support the need for a 10 pin, single in line package (SIP), 0.350" maximum seated height resistor network
product with an extended lead length. Vishay Dale is listed as a resource on this drawing as follows:
DSCC
DRAWING
NUMBER
92013
VISHAY DALE
MODEL
POWER POWER
MAX.
TEMPERATURE
RATING RATING RESISTANCE
WORKING
TOLERANCE (1) COEFFICIENT (2)
RANGE
SCHEMATIC ELEMENT PACKAGE
±%
(-55 °C to +125 °C) VOLTAGE (1)
P70 °C

P70 °C
± ppm/°C
V
W
W
MSP10C-01-S125
01 (C)
0.2
1.8
10 to 1M
MSP10C-03-S154
03 (G)
0.2
1.0
10 to 1M
MSP10C-05-S122
05 (H)
0.11
1.8
Consult factory
1, 2, 5
100
50
• This drawing can be viewed at: www.landandmaritime.dla.mil/Programs/MilSpec/ListDwgs.aspx?DocTYPE=DSCCdwg.
± 2 % standard, ± 1 % and ± 5 % available
(2) K = ± 100 ppm/°C; M = ± 300 ppm/°C
(1)
Revision: 10-Sep-15
Document Number: 31531
1
For technical questions, contact: [email protected]
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
MSM Long Lead (Military M83401/24)
www.vishay.com
Vishay Dale
GLOBAL PART NUMBER INFORMATION
New Global Part Numbering: M8340124K1003GCD03 (preferred part numbering format)
M
8
3
4
0
1
2
4
K
1
0
0
3
RESISTANCE
TOLERANCE
VALUE
F=±1%
K = 100 ppm
3 digit significant
M83401
24 = 10 pin,
G=±2%
M = 300 ppm
figure, followed
“A” profile,
J=±5%
by a multiplier
0.190" leads
10R0 = 10 
3302 = 33 k
1004 = 1 M
Historical Part Number: M8340124K1003GC (will continue to be accepted)
MIL STYLE
SPEC. SHEET
M83401
MIL STYLE
CHARACTERISTIC
24
SPEC SHEET
G
C
D
0
3
SCHEMATIC
PACKAGING
C = Bussed
G = Isolated
D03 = Tin/lead, tube
DSL = Tin/lead, tube,
single lot date code
K
1003
G
C
D03
CHARACTERISTIC
RESISTANCE
VALUE
TOLERANCE
SCHEMATIC
PACKAGING
New Global Part Numbering: M8340124KA001GHD03 (preferred part numbering format)
M
8
3
4
0
1
2
4
K
A
0
0
1
RESISTANCE
TOLERANCE
VALUE
F=±1%
K = 100 ppm
Per Std.
M83401
24 = 10 pin,
G=±2%
M = 300 ppm
MIL. Spec.
“A” profile,
J=±5%
(see Impedance
0.190" leads
Codes table)
Historical Part Number: M8340124KA001GH (will continue to be accepted)
MIL STYLE
SPEC. SHEET
M83401
MIL STYLE
CHARACTERISTIC
24
SPEC SHEET
G
H
D
0
3
SCHEMATIC
PACKAGING
H = Dual
terminator
D03 = Tin/lead, tube
DSL = Tin/lead, tube,
single lot date code
K
A001
G
H
D03
CHARACTERISTIC
RESISTANCE
VALUE
TOLERANCE
SCHEMATIC
PACKAGING
Note
• For additional information on packaging, refer to the Through-Hole Network Packaging document (www.vishay.com/doc?31542).
DIMENSIONS in inches (millimeters)
“A” Profile
0.030 + 0.005
- 0.015
(0.762 + 0.127
- 0.381)
Pin # 1
0.040 + 0.009
- 0.015
(1.02 + 0.229
- 0.381)
0.100 ± 0.005
(2.54 ± 0.127)
Non-accumulative
VISHAY DALE MODEL
MSM10
0.017 ± 0.004
(0.432 ± 0.102)
B
C equal space
0.012 ± 0.004
(0.305 ± 0.102)
B
C
0.900
(22.86)
9
MECHANICAL SPECIFICATIONS
MSM SERIES
VDC
50
Voltage Coefficient of Resistance
Veff
< 50 ppm
Dielectric Strength
VAC
200 min.
Insulation Resistance

10 000 M
Operating Temperature Range
°C
-55 to +125
Storage Temperature Range
°C
-55 to +150
Revision: 10-Sep-15
0.190 + 0.015
- 0.010
(4.83 + 0.381
- 0.254)
A
UNIT
Maximum Operating Voltage
0.187 + 0.008
- 0.010
(4.75 + 0.203
- 0.254)
0.983 ± 0.015
(24.97 ± 0.381)
TECHNICAL SPECIFICATIONS
PARAMETER
0.098 max.
(2.49 max.)
A
Body
Terminals
Solderability
Molded epoxy
Copper alloy, hot-solder dipped
Per MIL-PRF-83401
CAGE CODE: 91637 and 2799A (formerly SH903)
Document Number: 31531
2
For technical questions, contact: [email protected]
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
MSM Long Lead (Military M83401/24)
www.vishay.com
Vishay Dale
MILITARY IMPEDANCE CODES
CODE
R1 ()
R2 ()
CODE
R1 ()
R2 ()
A001
82
130
A011
330
680
A002
120
200
A012
1.5K
3.3K
A003
130
210
A013
3K
6.2K
A004
160
260
A014
180
270
A005
180
240
A015
270
270
A006
180
390
A016
560
560
A007
220
270
A017
560
1.2K
A008
220
330
A018
620
2.7K
A009
330
390
A019
150
1K
A010
330
470
A020
1K
1K
DERATING
01 Schematic
“A” Profile
MSM10A Package
Power Rating (W)
1.08
Single Resistor
0.12
- 55
0
+ 25
+ 70
+ 125 + 150
Ambient Temperature °C
03 Schematic
Power Rating (W)
“A” Profile
0.60
MSM10A Package
0.12
- 55
Single Resistor
0
+ 25
+ 70
+ 125 + 150
Ambient Temperature °C
Revision: 10-Sep-15
Document Number: 31531
3
For technical questions, contact: [email protected]
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
MSM Long Lead (Military M83401/24)
www.vishay.com
Vishay Dale
05 Schematic
Power Rating (W)
“A” Profile
MSM10A Package
1.08
Single Resistor
0.07
- 55
0
+ 25
+ 70
+ 125 + 150
Ambient Temperature °C
CIRCUIT APPLICATIONS

9 resistors with one pin common
01 Schematic
“A” Profile
MSM10A-01-S4 (M8340124xxxxxxC)
The MSM10A-01-S4 molded single-in-line resistor network provides
the user with 9 nominally equal resistors, each connected to a common
pin (pin no. 1).
Commonly used in the following applications:
1
2
3
n-1
• “Wired OR” pull-up
• Power gate pull-up
• MOS/ROM pull-up/pull-down
n
• Open collector pull-up
• TTL input pull-down
• TTL unused gate pull-up

5 isolated resistors
03 Schematic
“A” Profile
MSM10A-03-S2 (M8340124xxxxxxG)
The MSM10A-03-S2 molded single-in-line resistor network provides
the user with 5 nominally equal resistors. Each resistor is isolated from
all others.
Commonly used in the following applications:
1
2 3
4
n-1
• “Wired OR” pull-up
• Power driven pull-up
• Power gate pull-up
• Line termination
n



8 resistor pairs
05 Schematic
R2
“A” Profile
MSM10A-05-S3 (M8340124xxxxxxH)
R1
1
Revision: 10-Sep-15
2
3
• Long-line impedance balance
• LED current limiting
• ECL output pull-down
• TTL input pull-down
n-1
n
The MSM10A-05-S3 molded single-in-line resistor network provides
the user with 8 pair of R1/R2 resistor values for pulse squaring and TTL
dual-line terminating requirements.


Document Number: 31531
4
For technical questions, contact: [email protected]
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
MSM Long Lead (Military M83401/24)
www.vishay.com
Vishay Dale
PERFORMANCE
CONDITIONS
MAX. R
(TYPICAL TEST LOTS)
1.5 x rated power, applied 1.5 h “ON” and 0.5 h “OFF”
for 100 h ± 4 h at +25 °C ambient temperature
± 0.50 % R
5 cycles between -65 °C and +125 °C
± 0.50 % R
2.5 x rated working voltage for 5 s
± 0.25 % R (Characteristic K)
± 0.50 % R (Characteristic M)
45 min at full rated working voltage at -65 °C
± 0.25 % R (Characteristic K)
± 0.50 % R (Characteristic M)
240 h with humidity ranging from 80 % RH to 98 % RH
± 0.50 % R
Leads immersed in +260 °C solder to within 1/16" of body for 10 s
± 0.25 % R
Total of 18 shocks at 100 g’s
± 0.25 % R
Vibration
12 h at maximum of 20 g’s between 10 Hz and 2000 Hz
± 0.25 % R
Load Life
1000 h at +70 °C, rated power applied 1.5 h “ON”,
0.5 h “OFF” for full 1000 h period
± 0.50 % R (Characteristic K)
± 2.00 % R (Characteristic M)
4 1/2 pound pull for 30 s
± 0.25 % R
10 000 M (minimum)
-
No evidence of arcing or damage (200 VRMS for 1 min)
-
TEST
Power Conditioning
Thermal Shock
Short Time Overload
Low Temperature Operation
Moisture Resistance
Resistance to Soldering Heat
Shock
Terminal Strength
Insulation Resistance
Dielectric Withstanding Voltage
Revision: 10-Sep-15
Document Number: 31531
5
For technical questions, contact: [email protected]
THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT
ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
Legal Disclaimer Notice
www.vishay.com
Vishay
Disclaimer
ALL PRODUCT, PRODUCT SPECIFICATIONS AND DATA ARE SUBJECT TO CHANGE WITHOUT NOTICE TO IMPROVE
RELIABILITY, FUNCTION OR DESIGN OR OTHERWISE.
Vishay Intertechnology, Inc., its affiliates, agents, and employees, and all persons acting on its or their behalf (collectively,
“Vishay”), disclaim any and all liability for any errors, inaccuracies or incompleteness contained in any datasheet or in any other
disclosure relating to any product.
Vishay makes no warranty, representation or guarantee regarding the suitability of the products for any particular purpose or
the continuing production of any product. To the maximum extent permitted by applicable law, Vishay disclaims (i) any and all
liability arising out of the application or use of any product, (ii) any and all liability, including without limitation special,
consequential or incidental damages, and (iii) any and all implied warranties, including warranties of fitness for particular
purpose, non-infringement and merchantability.
Statements regarding the suitability of products for certain types of applications are based on Vishay’s knowledge of typical
requirements that are often placed on Vishay products in generic applications. Such statements are not binding statements
about the suitability of products for a particular application. It is the customer’s responsibility to validate that a particular
product with the properties described in the product specification is suitable for use in a particular application. Parameters
provided in datasheets and/or specifications may vary in different applications and performance may vary over time. All
operating parameters, including typical parameters, must be validated for each customer application by the customer’s
technical experts. Product specifications do not expand or otherwise modify Vishay’s terms and conditions of purchase,
including but not limited to the warranty expressed therein.
Except as expressly indicated in writing, Vishay products are not designed for use in medical, life-saving, or life-sustaining
applications or for any other application in which the failure of the Vishay product could result in personal injury or death.
Customers using or selling Vishay products not expressly indicated for use in such applications do so at their own risk. Please
contact authorized Vishay personnel to obtain written terms and conditions regarding products designed for such applications.
No license, express or implied, by estoppel or otherwise, to any intellectual property rights is granted by this document or by
any conduct of Vishay. Product names and markings noted herein may be trademarks of their respective owners.
Material Category Policy
Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as RoHS-Compliant fulfill the
definitions and restrictions defined under Directive 2011/65/EU of The European Parliament and of the Council
of June 8, 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment
(EEE) - recast, unless otherwise specified as non-compliant.
Please note that some Vishay documentation may still make reference to RoHS Directive 2002/95/EC. We confirm that
all the products identified as being compliant to Directive 2002/95/EC conform to Directive 2011/65/EU.
Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as Halogen-Free follow Halogen-Free
requirements as per JEDEC JS709A standards. Please note that some Vishay documentation may still make reference
to the IEC 61249-2-21 definition. We confirm that all the products identified as being compliant to IEC 61249-2-21
conform to JEDEC JS709A standards.
Revision: 02-Oct-12
1
Document Number: 91000