NCL30082SMRTGEVB_TEST_PROCEDURE.pdf - 154 KB

Test Procedure for the NCL30082SMRTGEVB Evaluation Board
Test Procedure
Equipment Needed
AC Source – 90 to 135 V ac 50/60 Hz Minimum 500 W capability
AC Wattmeter – 300 W Minimum, True RMS Input Voltage, Current,
Power Factor, and THD 0.2 % accuracy or better
DC Voltmeter – 300 V dc minimum 0.1 % accuracy or better
DC Ammeter – 1 A dc minimum 0.1 % accuracy or better
LED Load – 75 V @ 0.1 A. A constant voltage electronic load is an
acceptable substitute for the LEDs as long as it is stable.
Test Connections
1.
Connect the LED Load to the red(+) and black(-) leads through the ammeter
shown in Figure 8. Caution: Observe the correct polarity or the load may be
damaged.
2. Connect the AC power to the input of the AC wattmeter shown in Figure 8.
Connect the white leads to the output of the AC wattmeter
3. Connect the DC voltmeter as shown in Figure 8.
AC Power
Source
AC
Wattmeter
UUT
DC
DC
LED Test
Load
Figure 8. Test Set Up
Note: Unless otherwise specified, all voltage measurements are taken at the
terminals of the UUT.
Functional Test Procedure
1. Set the LED Load for 75 V output. (Can use 65V LED Load with 100Ω Resistor
in Series).
2. Set the input power to 120 V 60 Hz. Caution: Do not touch the ECA once it is
energized because there are hazardous voltages present.
3. Check for 100 mA ± 3 mA IOUT
06/19/15
1
www.onsemi.com
Line and Load Regulation
120 V / Max Load
LED Output
75 V
75 V
Output Current
100 mA ± 3 mA
Output Power
Power Factor
3.3 V Load = 0
3.3 V Load = 20 mA
Output Voltage
Measured
Aux Voltage
3.3 V
Min
3.0 V
3.3 V
3.0 V
3.6 V
3.3 V
3.0 V
3.6 V
06/19/15
2
Max
3.6 V
LED Current =
max
LED Current = 0
(dim = 0 V)
On/Off = Off
www.onsemi.com