LV4924VHGEVB_TEST_PROCEDURE.PDF - 268 KB

Test Procedure for the LV4924VHGEVB Evaluation Board
View
Set-up
1. Connect power supply (13V dc) to the terminal.
2. Connect speakers (8Ω) to the terminals.
3. Connect PWM input to the terminals.
1/22/2013
1
www.onsemi.com
Test
1.
2.
3.
4.
Turn on 13V dc power supply.
STBY_SW set to up-side (STBY: Off).
MUTE_SW set to up-side (MUTE: Off).
Turn on PWM input.
Shut Down
1. MUTE_SW set to down-side (MUTE: On).
2. STBY_SW set to down-side (STBY: On).
3. Turn off 13V dc power supply.
Caution: STBY_SW must be set to down-side after MUTE_SW.
1/22/2013
2
www.onsemi.com