LV0111CFGEVB_TEST_PROCEDURE.PDF - 138 KB

Test Procedure for the LV0111CFGEVB Evaluation Board
Evaluation Board
Evaluation Board
Photo Diode
IC1
4pin
OUT
C1
0.1μF
R1
27KΩ
1pin
VCC
2pin
EN
3pin
GND
Monitoring
or
To CPU AD port
EN
Low
High
12/23/2013
State
Sleep
Active
1
www.onsemi.com
LIGHT
SOURCE
ILLUMINANCE
METER
GND
OUT
EN
VCC
00.7600 V DC
MULTIMETER
POWER SUPPLY
Test Procedure:
1. Connect the test setup as shown above.
2. Connect IC power supply (2.3V to 5.5V) between VCC and GND.
3. Connect multimeter between OUT and GND.
4. Irradiate a light, and put the luminance meter near the IC.
5. Control the light source and adjust to 500 lux.
6. The OUT terminal of LV0111CF is outputted roughly at 28uA. Therefore, multimeter should show
roughly 0.76V. (0.76V = 28uA×27kΩ)
LV0111CF features:
・Logarithmic current output
・Low current consumption (typical 75uA)
12/23/2013
2
www.onsemi.com