NCP382HD10AAGEVB_TEST_PROCEDURE.PDF - 52.0 KB

Test Procedure for the NCP382HD10AAGEVB Evaluation Board
Equipment Needed:
1. Power Supply (5V, 3A)
2. Potentiometer/Load (100Ω, 10W)
3. Multimeter
Note: Cables should be as short as possible to lower their inductance value – otherwise you may harm
either the input or output pins of the device
Set-up & Test:
1.
2.
3.
4.
5.
6.
7.
Apply Vin = 4V dc (Over Current Limit = 1A) on IN test point.
Connect a 100Ω, 10W load between Output1 test point and GND strap.
Toggle EN1 strap between Low and High sides.
Output1 must change from 0 to 4V by toggling the EN1 switch.
Disconnect load from Output1 and connect it to Output2 test point.
Toggle EN2 strap between Low and High sides.
Output2 must change from 0 to 4V by toggling the EN2 switch.
7/30/2012
-1-
www.onsemi.com