A A V V ELECTRONIC LOAD REGULATED DC SUPPLY Test Procedure for the NCP59152MNADGEVB Evaluation Board Figure 1: Test Setup Test Procedure: 1. Connect the test setup as shown in Figure 1 2. Apply an input voltage, Vin = 3.5 V dc 3. Apply Iout = 10 mA load 4. Check that Vout is 2.5 V 5. Increase Iout load to 1.5 A 6. Check that Vout is 2.5 V 7. Check by Multimeter referenced to GND that Vflag is roughly 2.5 V 8. Decrease input voltage to Vin = 2.24V 9. Check that Vflag is less than 0.4 V 10. Power down the load 11. Power down Vinput 12. End of test 2/15/2012 -1- www.onsemi.com