TDLS Post IOC Build Release Plan (S1P1) Build Release • • Ship Date System Size (PTRs / ERs) Major Content & Build Criteria Full Screen Implemented Split PDC/CPDLC Screens w/Gates in Processed Tab 2 PDC & 3 CPDLC columns TDLS v12.0 04/17/15 30 PTRs 3 ERs TDLS/TIMS v12.0.1 05/21/15 Original - 15 PTRs TEDC fixes needed for Phase 1 (TEDC Turnup) Final - 41 PTRs TDLS/TIMS v12.0.2 07/08/15 30 PTRs CPDLC IOC Criteria - Safety, Stability, SLC fixes, useability/user acceptance, \ TDLS/TIMS v12.0.3 CPDLC Non-National 08/07/15 IOC+30 20 PTRs CPDLC IOC Criteria - Safety, Stability, IAH/HOU fixes, useability/user acceptance, TDLS/TIMS v12.0.4 UBER CHI Build and PTR fixes 11/6/2015 IOC+90 50 PTRs Chi ERs “New” CHI (Based on Thin Spec finalized by 4/3/15) Training updates - Individual Lessons Delivered as completed in rolling fashion up to it. TDLS v12.0.4 CPDLC Rollout PTR / Post IOC fixes 12/18/15 10 PTRs PTR Resolution Expect monthly updates through deployment waterfall to address emerging requirements and bug fixes. Current planned PTR fixes are to address bugs found in testing – no current flight deck impacts. Data Comm Program June 2015 Federal Aviation Administration 1 Consolidated Timeline 5/21/2015 TDLS/TIMS v12.0.1 5/15/2015 6/1/2015 7/8/2015 8/7/2015 TDLS/TIMS v12.0.2 TDLS/TIMS v12.0.3 7/1/2015 6/15/2015 MD-11 Pegasus-622 Release 3/15/2015 B737 U11 Release Data Comm Program June 2015 8/1/2015 11/6/2015 TDLS/TIMS v12.0.4 (KS) 9/1/2015 10/1/2015 11/1/2015 12/18/2015 TDLS v12.0.4 (Rollout) 12/1/2015 1/1/2016 2/1/2016 3/1/2016 3/15/2016 1/15/2016 B737 U12 Release Federal Aviation Administration 2