DCL_Trials_Testing_Status_MURACA_DCIT_22.ppt

Data Communications
Implementation Team (DCIT)
Departure Clearance Trials (DCL)
Test Status
DCIT Meeting # 22
Washington, DC
Presented to:
DCIT
By:
Pete Muraca, FAA
Date:
March 13 - 14, 2013
Federal Aviation
Administration
Agenda
• Test Activity to Date
–
Boeing / Airbus Test Sessions
–
E-E Functional and Operational Testing
–
Environment
–
Avionics Assets
• MEM Schedule Milestones
• Schedule Highlights
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
2
Test Activity to Date
•
Latest Build 6 was delivered to WJHTC 3/4/13:

-
Build 6 WJHTC Installation Complete: March 4
Build 6 WJHTC Functional Testing: March 4-20
Build 6 MEM Functional/Pre-SAT Testing: March 11-20
Build 6 MEM Site Acceptance Test (SAT): March 21-22
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
Federal Aviation
Administration
3
Boeing / AIRBUS Test Sessions
•
Boeing Test Sessions:
-
•
Boeing Test Session dates – 2/27, 3/1, 3/5, 3/6, 3/7, 3/8
Boeing Test Benches utilized – B737, B747-800, B767, B777
AIRBUS Test Sessions:
-
Airbus Test Session dates – 2/28, 3/5, 3/7
Airbus Test Benches utilized – A340, A380
Week of March 11, 2013
MEM pre-SAT testing
MEM Pre-SAT
Test Activities
-
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
MEM DTAP env with Tech
Center avionics
MEM DTAP env with UPS /
AOC
MEM DTAP env with FedEx /
AOC
Federal Aviation
Administration
4
End to End Functional Testing
•
DTAP Build 6
-
Run system test cases with Tech Center bench avionics
Run system test cases with Boeing and Airbus labs (multiple flight deck
configs)
Exercised test scenarios with DCIT aircraft
Conducted Regression testing
-
•
Documented / Socialized Findings
•
New PTRs Opened
-
•
118,120,122,124,125,126,127,128,133
Closed PTRs
-
88,93,100,101,102,103,104,105,106,118,125,124,126,127
Total Open High PTRs
Total Open Medium-High PTRs
Total Open Medium PTRs
Total Open Low PTRs
Total Open - not classified yet
Total Open - High:Out of Scope
Total Open - Medium-High:Out of Scope
Total Open PTRs
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
14
4
6
13
0
0
2
37
Federal Aviation
Administration
5
Functional and Operational Test Env.
Lab Environment
•
End to End Functional Testing
•
End to End Operational Scenarios
Testing (includes pilots & controller crew)
•
FANS Avionics Platforms
•
DCIT Aircraft (FedEx, United-Continental,
UPS, Delta, AA, UsAir, Southwest)
Site Acceptance Testing (Field
Environment)
•
Sub_set of Functional End to End
•
Operational end to end scenarios
•
FedEx Aircraft and AOC Participation









HADDS / FDIO connectivity and simulation
capability
FNTB (via NESG) connectivity for external
FAA communications
Ground/Ground and Air/Ground
Communication service via ARINC
Ground/Ground and Air/Ground
Communication service via SITA
Utilization of Boeing configurable flight
deck
Utilization of Airbus configurable flight
deck
Utilization of FAA Technical Center bench
avionics
DCIT Aircraft Participation
Plans, Procedures and Personnel in place
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
6
Avionics Assets
(FANS) In-House
•
CMU based FANS 1/A+ avionics end
system
–
•
Connected to roof antenna representing
a target aircraft
(FANS) External
o Boeing Flight Deck (via subnetwork
infrastructure and service (ARINC
and SITA)
o
o
o
o
o
o
Laptop based FANS 1/A+ avionics end
system
–
Can be connected to real avionics
hardware (A750 Radio, A739 MCDU,
A758 CMU) via A429 card
o
(ATN Baseline 1 & SC-214 v. H)
•
Rockwell Collins prototype Avionics (Real
Hardware)
•
Honeywell Avionics (Real Hardware)
•
Thales Avionics (PC based)
B737-ng
B777
B747-400
MD-11
B787
B767
(FANS)
DCIT
Aircraft
o FedEx
o UPS
o Delta
o United
Airbus Flight Deck (via subnetwork
infrastructure and service (ARINC
and SITA)
o
o
o
o
A320
A330
A350
A380
Note: Planning for Lab FMS integrated avionics solution
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
7
MEM Schedule Milestones
•
The Milestone Schedule Outlook:

-
Build 6 WJHTC Installation Complete: March 4
Build 6 WJHTC/MEM Functional/Pre-SAT Testing: March 4-20
Build 6 MEM Functional/Pre-SAT Testing: March 11-20
Build 6 MEM Site Acceptance Test (SAT): March 21-22
MEM Limited Full Functionality Trials (3 Ops/day): March 26 – April 26
MEM Full FANS Fleet 24x7 Trials Start: April 30
4pm Daily Build 6 Testing/PTR review telcon
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
Federal Aviation
Administration
8
DCL Trials – Test Status
DCIT #22 (March 13 - 14, 2013)
Federal Aviation
Administration
9