Category 6A UTP Modular Plug for Panduit SD Horizontal Cable T568B & T568A Part Number: SP6X88SD-C INSTALLATION INSTRUCTIONS © Panduit Corp. 2013 PN572B T568B Wiring Scheme 6 4 3 2 7 5 1 GRN/ BRN/ BLU/ ORG/ T568B BRN WHT GRN WHT BLU WHT ORG WHT Pin # Strain Relief Boot Specifications Foldable Strain Relief Collar Divider 8 • Cable jacket diameter 0.250 in. max. • Maximum conductor insulation diameter 0.035 in. • Panduit recommends T568B wiring scheme for use with cable constructed with the brown pair opposing the orange pair. Load Bar Plug Housing Load Bar Divider Conductor holes and Contact slots Conductor slots and “V” channel 1 Pins 8 Conductor holes “V” channel Contact slots 1 Divider post CWST Thread on boot first! Thread boot onto the cable first. Remove 2.0" of the outer jacket from the cable end using wire stripping tool (CJAST). Fan twisted pairs into respective quadrants. The brown pair should be opposite the orange pair. When a cable spline (X-shaped filler) is present, cut spline flush to fanned pairs using wire snipping tool (CWST). Note orientation of the divider depending on cable end 1 or cable end 2. The “V” channel should be aligned with the orange pair. Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and orange quadrants of the spline. Arrange conductors to T568B wiring scheme while minimizing untwist and smooth conductors. Seat conductors into proper divider slots while holding divider near the end of the cable jacket. (Cable ends 1 & 2) 90° (Cable end 2) 2 BLU (Cable end 1) GRN ORG “V” channel ORG “V” channel GRN BRN BLU 3 BRN “V” channel (Cable end 1) (Cable end 2) For Technical Support: www.panduit.com/resources/install_maintain.asp Page 1 of 4 INSTALLATION INSTRUCTIONS © Panduit Corp. 2013 4 While holding conductors in respective divider slots, straighten and align untwisted conductors using a circular motion. Do not release grip of conductors until load bar is applied in order to maintain conductor alignment. Trim conductors on an angle approximately 1.00" from divider leading edge. Orient load bar with contact slots facing downward. Guide conductors into load bar holes while holding conductors in the divider. Slide load bar towards divider until flush. Ensure the divider/load bar is centered and perpendicular to the cable axis. Wrap foldable strain relief collar sides around cable until the latch engages. Front tips of strain relief collar should be flush with the divider. Do not exert pressure onto divider as collar can push load bar off conductors. Trim conductors flush with load bar face. Align pin #1 of cable sub-assembly with pin #1 of plug housing. Grip and squeeze across collar arms as sub-assembly is inserted into the plug housing. Push sub-assembly into housing until collar locking tabs clear the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step. Slide boot forward and fully seat onto strain relief collar. Use tool MPT5-8AS to complete plug termination. Assembly is complete. Visually check plug. 8 6 4 3 2 7 5 1 GRN/ BRN/ BLU/ ORG/ T568B BRN WHT GRN WHT BLU WHT ORG WHT Pin # PN572B 1.00" (Cable end 1) 5 (Cable end 1) 1 8 Pins Verify load bar orientation 6 7 (Cable end 1) 8 9 Locking tabs 1 Pins 8 (Cable end 1) 10 11 MPT5-8AS For Technical Support: www.panduit.com/resources/install_maintain.asp Page 2 of 4 INSTALLATION INSTRUCTIONS © Panduit Corp. 2013 PN572B T568A Wiring Scheme 6 4 3 2 7 5 1 ORG/ BRN/ BLU/ GRN/ T568A BRN WHT ORG WHT BLU WHT GRN WHT Pin # Strain Relief Boot Specifications Foldable Strain Relief Collar Divider 8 • Cable jacket diameter 0.250 in. max. • Maximum conductor insulation diameter 0.035 in. Load Bar • Panduit recommends T568A wiring scheme for use with cable constructed with the brown pair opposing the green pair. Plug Housing Load Bar Divider Conductor holes and Contact slots Conductor slots and “V” channel 1 Pins 8 Conductor holes “V” channel Contact slots 1 CWST Thread on boot first! (Cable ends 1 & 2) 90° 2 (Cable end 2) Thread boot onto the cable first. Remove 2.0" of the outer jacket from the cable end using wire stripping tool (CJAST). Fan twisted pairs into respective quadrants. The brown pair should be opposite the green pair. When a cable spline (X-shaped filler) is present, cut spline flush to fanned pairs using wire snipping tool (CWST). Note orientation of the divider depending on cable end 1 or cable end 2. The “V” channel should be aligned with the green pair. Insert divider posts into the cable. If the cable has an internal spline, insert divider posts into the brown and green quadrants of the spline. Arrange conductors to T568A wiring scheme while minimizing untwist and smooth conductors. Seat conductors into proper divider slots while holding divider near the end of the cable jacket. BLU (Cable end 1) ORG GRN “V” channel GRN “V” channel ORG Divider post BRN BLU 3 BRN “V” channel (Cable end 1) (Cable end 2) For Technical Support: www.panduit.com/resources/install_maintain.asp Page 3 of 4 INSTALLATION INSTRUCTIONS © Panduit Corp. 2013 4 8 6 4 3 2 7 5 1 ORG/ BRN/ BLU/ GRN/ T568A BRN WHT ORG WHT BLU WHT GRN WHT Pin # 1.00" PN572B While holding conductors in respective divider slots, straighten and align untwisted conductors using a circular motion. Do not release grip of conductors until load bar is applied in order to maintain conductor alignment. Trim conductors on an angle approximately 1.00" from divider leading edge. Orient load bar with contact slots facing downward. Guide conductors into load bar holes while holding conductors in the divider. Slide load bar towards divider until flush. Ensure the divider/load bar is centered and perpendicular to the cable axis. Wrap foldable strain relief collar sides around cable until the latch engages. Front tips of strain relief collar should be flush with the divider. Do not exert pressure onto divider as collar can push load bar off conductors. Trim conductors flush with load bar face. Align pin #1 of cable sub-assembly with pin #1 of plug housing. Grip and squeeze across collar arms as sub-assembly is inserted into the plug housing. Push sub-assembly into housing until collar locking tabs clear the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step. Slide boot forward and fully seat onto strain relief collar. Use tool MPT5-8AS to complete plug termination. Assembly is complete. Visually check plug. (Cable end 1) 5 (Cable end 1) 1 8 Pins Verify load bar orientation 6 7 (Cable end 1) 8 9 Locking tabs 1 Pins 8 (Cable end 1) 10 11 MPT5-8AS E-mail: [email protected] For Instructions in Local Languages and Technical Support: www.panduit.com/resources/install_maintain.asp www.panduit.com Page 4 of 4 Phone: 866-405-6654