pr ch re R W od an g E A uc ce iste GI RR t— to r ST A w w onl R NT w i n in A w. a e T Y tri F to IO pp R da N lit EE y : e. T fo co ri r a m pp /w L ar ite ra nt y Owner’s Manual 23” Wide Mounting Rail Kit for Tripp Lite Extra-Wide Rack Systems Model: SRVRTRAIL23 The SRVRTRAIL23 Mounting Rail Kit allows standard 19” wide rackmounting capabilities to be converted into 23” wide rackmounting capabilities, typically seen in Telco applications. This kit is intended for installation into Tripp Lite Extra-Wide Rack Systems (Models: SR42UBWD and SR42UBDPWD). Parts List Mounting Rails (4) M4 Self-Tapping Screws (24) Lock Washers (24) Installation 1 Each rail in your current rack system is connected to the enclosure with 6 screws and washers—1 pair in the upper beam A , 1 pair in the middle beam B and 1 pair in the lower beam C . Remove these screws and washers, followed by the rail itself. Repeat for the other 3 rails. 2 Replace each rail with one from the new kit, using a supplied M4 screw and lock washer to secure it, in the reverse order from the previous step—1 pair in the upper beam A , 1 pair in the middle beam B and 1 pair in the lower beam C . Note: Just as with your previous rails, the attachment points are numbered D to help you align each rail at its appropriate depth. A A 4 B 5 8 3 4 5 6 7 8 9 0 5 6 B 1 2 3 4 5 6 C 1 D 4 6 8 3 4 5 6 7 8 9 0 C 2 1111 West 35th Street • Chicago, IL 60609 USA www.tripplite.com/support Tripp Lite follows a policy of continuous improvement. Product specifications are subject to change without notice. Copyright © 2010 Tripp Lite. All rights reserved. 201001057 • 93-2972 1 2 3 4 5