NCP1032BGEVB_TEST_PROCEDURE.pdf - 338 KB

Test Procedure for the NCP1032BGEVB Evaluation Board
Figure 1: Test Setup
The following steps describe the test procedure for all these boards:
Suggested Equipment:
Current limited DC Power Supply (e.g. Sorensen XHR150-7) ………………… …1pc
DC Volt-Meter able to measure up to 60 V DC (e.g. KEITHLEY 2000) ………… 2pcs
DC Amp-Meter able to measure up to 2 A DC (e.g. KEITHLEY 2000) ………......1pc
DC Amp-Meter able to measure up to 5 A DC (e.g. FLUKE 89 IV)……………… 1pc
DC Electronic Load (e.g. AGILENT 6060B) ……………………………………... 1pc
05/01/15
1
www.onsemi.com
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, VIN = 48 Vdc
3. Apply IOUT (load) = 0 A
4. Observe Soft start
5. Check that VOUT = 12V + 5%Vdc
6. Set IOUT to desired level 0 A- 100 mA and measure voltage and current the efficiency should be similar to that shown in
Figure 2
7. Turn off the load
8. Turn off VIN
9. End of the test