NCP3063DIPBSTEVB_TEST_PROCEDURE.PDF - 88.0 KB

Test Procedure for the NCP3063 Boost – PDIP-8
7/31/2006
ELECTRONIC
LOAD
A
REGULATED DC
SUPPLY
A
V
V
Figure 1: Test Setup
Table 1: Required Equipment
Voltage Supply (12 V, 3 A)
Voltage Meter
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, Vcc = 12V
3. Apply Iout = 0mA load.
4. Check that Vout is 24Vdc (23.9V – 24.1V)
5. Increate Iout load to 350mA
6. Check that Vout is 24V (23.9V – 24.1V)
7. Power down the load
8. Power down Vcc
9. End of test
Electronic Load or
Current Source