Test Procedure for the NCP3063 Invert – DIP 8/29/2006 ELECTRONIC LOAD A V A REGULATED DC SUPPLY V Figure 1: Test Setup DIP Table 1: Required Equipment Voltage Supply (5V, 3A) Voltage Meter Electronic Load or Current Source Test Procedure: 1. Connect the test setup as shown in Figure 1. 2. Apply an input voltage, Vcc = 5V 3. Apply Iout = 0mA load. 4. Check that Vout is -12V (-11.5V – -12.5V) 5. Increate Iout load to 100mA 6. Check that Vout is -12V (-11.5V – -12.5V) 7. Power down the load 8. Power down Vcc 9. End of test