NCP57152DSADGEVB_TEST_PROCEDURE.PDF - 48.0 KB

A
A
V
V
ELECTRONIC
LOAD
REGULATED DC
SUPPLY
Test Procedure for the NCP57152DSADGEVB Evaluation Board
Figure 1: Test Setup
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, Vin = 2.5 V dc
3. Apply Iout = 10 mA load.
4. Check that Vout is 1.5 V
5. Increase Iout load to 1.5 A
6. Check that Vout is 1.5 V
7. Power down the load
8. Power down Vin
9. End of test
11/15/2012
-1-
www.onsemi.com