Test Procedure for the NCV8716MTTBGEVB Evaluation Board Test procedure: 1.Check the Voltage Version (It is mentioned next to OUTPUT terminal on the demoboard.) 2. Connect the test setup as shown Figure above 3. Appy an input voltage Vin = 6.0 V 4. Appy Iout = 0mA load. 5. Check that Vout is: 1.5 V +/-2% for 1.5 V voltage version 1.8 V +/-2% for 1.8 V voltage version 2.5 V +/-2% for 2.5 V voltage version 3.0 V +/-2% for 3.0 V voltage version 3.3 V +/-2% for 3.3 V voltage version 5.0 V +/-2% for 5.0 V voltage version 6. Increase Iout up to 80 mA 6/6/2014 1 www.onsemi.com 7. Check that Vout is : 1.5 V +/-2% for 1.5 V voltage version 1.8 V +/-2% for 1.8 V voltage version 2.5 V +/-2% for 2.5 V voltage version 3.0 V +/-2% for 3.0 V voltage version 3.3 V +/-2% for 3.3 V voltage version 5.0 V +/-2% for 5.0 V voltage version 8. Increase Vin up to 24.0 V and decrease the load in accordance with Safe Operation Area 9. Power down the Load 10. Power down the Vcc 11. End of test 6/6/2014 2 www.onsemi.com