Vishay NTCLP100E3103H Ntc thermistors, special long lead sensor Datasheet

NTCLE400, NTCLS100, NTCLP100
Vishay BCcomponents
NTC Thermistors, Special Long Lead Sensors
FEATURES
•
•
•
•
Accurate over wide temperature range
High stability
Excellent price/performance ratio
High adhesive strength between PVC wire and
the encapsulating laquer
• Compliant to RoHS Directive 2002/95/EC and in
accordance to WEEE 2002/96/EC
APPLICATIONS
Temperature measurement, sensing and control in remote
locations and for various environmental conditions.
QUICK REFERENCE DATA
PARAMETER
VALUE
UNIT
Resistance value at 25 °C (R25)
2.2K to 100K

Tolerance on R25-value (2)
±3
%
B25/85-value
3977 to 4190
K
Tolerance on B25/85-value
± 0.75 to ± 1.5
%
Operating temperature range:
At zero dissipation
- 40 to + 85
°C
(continuously)
At maximum dissipation
0 to + 55
Maximum power dissipation
250
mW
at 55 °C
Dissipation factor:
NTCLE400...
6.0
mW/K
NTCLS100...
8.0
NTCLP100...
6.0
Response time (1):
NTCLE400...
7
s
NTCLS100...
 15
NTCLP100...
 10
Climatic category
40/085/56
(LCT/UCT/days)
Weight
NTCLE400...
4
g
NTCLS100...
6
NTCLP100...
6
Notes
(1) Response time in silicone oil MS 200/50. This is the time needed
for the sensor to reach 63.2 % of the total temperature
difference when subjected to a temperature change from 25 °C
in air to 85 °C in oil.
(2) Tighter tolerances on R are available upon request.
25
DESCRIPTION
These sensors exist of a small NTC chip reflow soldered
between two AWG24 UL-2468 wires. They are lacquered
and insulated with black epoxy (NTCLE400 type), sleeved
(NTCLS100 type) or potted into a brass pipe (NTCLP100
type).
MARKING
UL mark on wire, no mark on body.
PACKAGING
The thermistors are packed in cardboard boxes; each box
containing 500 pieces.
DESIGN-IN SUPPORT
Other wire length and wire type (UL-2651 PVC 105 °C) are
available on request. The products can be provided with a
connector on request.
For complete curve computation, visit:
www.vishay.com/resistors-non-linear/curve-computation-list/
MOUNTING
By soldering or clamping the wire ends, in any position.
Body can be inserted or taped attached. Not intended for
fluid immersed applications.
ELECTRICAL DATA AND ORDERING INFORMATION
R25
(k)
SAP MATERIAL AND ORDERING NUMBER (3)(4)
B25/85-VALUE
EPOXY
TYPE
SLEEVED
TYPE
PIPE
TYPE
OLD 12NC CODE 2381 641 .....
EPOXY-COATED
TYPE
SLEEVED
TYPE
2.2
3977K ± 0.75 % NTCLE400E3222H NTCLS100E3222H NTCLP100E3222H
26222
36222
4.7
3977K ± 0.75 % NTCLE400E3472H NTCLS100E3472H NTCLP100E3472H
26472
36472
5
3977K ± 0.75 % NTCLE400E3502H NTCLS100E3502H NTCLP100E3502H
26502
36502
10
3977K ± 0.75 % NTCLE400E3103H NTCLS100E3103H NTCLP100E3103H
26103
36103
47
4090K ± 1.5 %
NTCLE400E3473H NTCLS100E3473H NTCLP100E3473H
26473
36473
100
4190K ± 1.5 %
NTCLE400E3104H NTCLS100E3104H NTCLP100E3104H
26104
36104
Notes
(3) Other values and tolerances based on the NTCC100E4 series are available on request. (www.vishay.com/doc?29058)
(4) The specified catalog numbers refer to products with L = 400 mm, without connector and adopt UL-2468.AWG24 wire.
Document Number: 29060
Revision: 03-May-11
For technical questions, contact: [email protected]
BRASS-PIPE
TYPE
46222
46472
46502
46103
46473
46104
www.vishay.com
1
This document is subject to change without notice.
THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
NTCLE400, NTCLS100, NTCLP100
NTC Thermistors, Special Long
Lead Sensors
Vishay BCcomponents
DIMENSIONS in millimeters
Epoxy-coated type NTCLE400E....
6 max.
5±2
17 ± 3
L
L = 400 mm + 15/- 0
Other wire lengths or connector attached available on request.
Sleeved type NTCLS100E....
8 max.
5±2
15 max.
25 ± 5
L
L = 400 mm + 15/- 0
Other wire lengths or connector attached available on request.
Brass-pipe type NTCLP100E....
6 ± 0.1
5±2
25 ± 0.5
L
L = 400 mm + 15/- 0
Other wire lengths or connector attached available on request.
DERATING
Power derating curve.
P
(%)
100
0
- 40
0
55
85
125
Tamb (°C)
Note
• Zero power is considered as measuring power max. 1 % of max. power.
www.vishay.com
2
For technical questions, contact: [email protected]
Document Number: 29060
Revision: 03-May-11
This document is subject to change without notice.
THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
NTCLE400, NTCLS100, NTCLP100
NTC Thermistors, Special Long
Lead Sensors
Vishay BCcomponents
RESISTANCE VALUES AT INTERMEDIATE TEMPERATURES WITH R25 AT 2.2 k, 4.7 k, 5.0 k , AND 10 k
PART NR.
NTCL**00E3222H
PART NR.
NTCL**00E3472H
PART NR.
NTCL**00E3502H
PART NR.
NTCL**00E3103H
RT
()
RT
()
RT
()
RT
()
- 40
73 061
156 084
166 047
- 35
52 778
112 753
- 30
38 544
- 25
R/R
(%)
TCR
(%/K)
Tmax.
(± K)
332 094
5.87
- 6.62
0.89
119 950
239 900
5.60
- 6.39
0.88
82 344
87 600
175 200
5.33
- 6.18
0.86
28 443
60 765
64 643
129 287
5.08
- 5.98
0.85
- 20
21 199
45 288
48 179
96 358
4.83
- 5.78
0.84
- 15
15 950
34 075
36 250
72 500
4.60
- 5.60
0.82
- 10
12 110
25 872
27 523
55 046
4.37
- 5.42
0.81
-5
9275
19 814
21 078
42 157
4.15
- 5.25
0.79
0
7162
15 300
16 277
32 554
3.94
- 5.09
0.77
5
5574
11 909
12 669
25 339
3.74
- 4.93
0.76
10
4372
9340
9936
19 872
3.55
- 4.79
0.74
15
3454
7378
7849
15 698
3.36
- 4.64
0.72
20
2747
5869
6244
12 488
3.18
- 4.51
0.70
25
2200
4700
5000
10 000
3.00
- 4.38
0.69
30
1773
3788
4030
8059
3.17
- 4.25
0.75
35
1438
3071
3267
6535
3.33
- 4.13
0.81
40
1173
2505
2665
5330
3.49
- 4.02
0.87
45
961.8
2055
2186
4372
3.65
- 3.91
0.93
50
793.2
1694
1803
3605
3.80
- 3.80
1.00
55
657.5
1405
1494
2989
3.94
- 3.70
1.07
60
547.8
1170
1245
2490
4.08
- 3.60
1.13
65
458.6
979.7
1042
2084
4.22
- 3.51
1.20
70
385.7
823.9
876.5
1753
4.35
- 3.42
1.27
75
325.8
696.0
740.5
1481
4.48
- 3.33
1.35
80
276.4
590.5
628.2
1256
4.60
- 3.25
1.42
85
235.5
503.0
585.2
1070
4.73
- 3.17
1.49
TOPER
(°C)
Document Number: 29060
Revision: 03-May-11
For technical questions, contact: [email protected]
www.vishay.com
3
This document is subject to change without notice.
THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
NTCLE400, NTCLS100, NTCLP100
Vishay BCcomponents
NTC Thermistors, Special Long
Lead Sensors
RESISTANCE VALUES AT INTERMEDIATE TEMPERATURES WITH R25 AT 47 k
TOPER
(°C)
PART NR.
NTCL**00E3473H
RT
()
R/R (%)
TCR
(%/K)
Tmax.
(± K)
- 40
1 589 068
8.91
- 6.54
1.36
- 35
1 151 627
8.34
- 6.34
1.32
- 30
842 790
7.79
- 6.15
1.27
- 25
622 597
7.27
- 5.96
1.22
- 20
464 110
6.77
- 5.79
1.17
- 15
348 989
6.28
- 5.62
1.12
- 10
264 628
5.82
- 5.45
1.07
-5
202 280
5.37
- 5.30
1.01
0
155 823
4.94
- 5.14
0.96
5
120 932
4.52
- 5.00
0.91
10
94 528
4.12
- 4.86
0.85
15
74 399
3.74
- 4.72
0.79
20
58 945
3.36
- 4.59
0.73
25
47 000
3.00
- 4.47
0.67
30
37 706
3.35
- 4.35
0.77
35
30 429
3.69
- 4.23
0.87
40
24 696
4.02
- 4.12
0.97
45
20 154
4.33
- 4.01
1.08
50
16 534
4.64
- 3.91
1.19
55
13 633
4.94
- 3.81
1.30
60
11 296
5.23
- 3.71
1.41
65
9404
5.51
- 3.62
1.52
70
7865
5.78
- 3.53
1.64
75
6607
6.04
- 3.44
1.75
80
5573
6.30
- 3.36
1.87
85
4721
6.55
- 3.28
2.00
www.vishay.com
4
For technical questions, contact: [email protected]
Document Number: 29060
Revision: 03-May-11
This document is subject to change without notice.
THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
NTCLE400, NTCLS100, NTCLP100
NTC Thermistors, Special Long
Lead Sensors
Vishay BCcomponents
RESISTANCE VALUES AT INTERMEDIATE TEMPERATURES WITH R25 AT 100 k
PART NR.
NTCL**00E3104H
TOPER
(°C)
RT
()
R/R (%)
TCR
(%/K)
Tmax.
(± K)
- 40
3 666 299
9.05
- 6.69
1.35
- 35
2 637 588
8.47
- 6.49
1.31
- 30
1 916 576
7.91
- 6.29
1.26
- 25
1 406 111
7.37
- 6.10
1.21
- 20
1 041 184
6.86
- 5.92
1.16
- 15
777 846
6.36
- 5.75
1.11
- 10
586 097
5.89
- 5.58
1.06
-5
445 257
5.43
- 5.42
1.00
0
340 942
4.99
- 5.26
0.95
5
263 054
4.56
- 5.11
0.89
10
204 446
4.15
- 4.97
0.84
15
160 014
3.75
- 4.83
0.78
20
126 087
3.37
- 4.70
0.72
25
100 000
3.00
- 4.57
0.66
30
79 808
3.36
- 4.45
0.75
35
64 077
3.70
- 4.33
0.86
40
51 745
4.04
- 4.22
0.96
45
42 021
4.36
- 4.11
1.06
50
34 308
4.68
- 4.00
1.17
55
28 156
4.98
- 3.90
1.28
60
23 222
5.28
- 3.80
1.39
65
19 246
5.57
- 3.71
1.50
70
16 025
5.85
- 3.62
1.62
75
13 402
6.12
- 3.53
1.73
80
11 258
6.38
- 3.45
1.85
85
9496
6.64
- 3.36
1.97
TESTS AND REQUIREMENTS
STABILITY TESTS
IEC
TEST
PROCEDURE
60068-2-2
Endurance dry heat
85 °C; 1000 h
R/R < 5 %
60068-2-1
Endurance cold
- 40 °C; 1000 h
R/R < 5 %
60539
Endurance max. dissipation
250 mW; 55 °C; 1000 h
R/R < 5 %
Damp heat, steady state
56 days at 40 °C; 90 % to 95 % RH
R/R < 7 %
- 40 °C to + 85 °C; 50 cycles
Rapid change of temperature
R/R < 5 %
60068-2-3
60068-20-14
DRIFT REQUIREMENT
Document Number: 29060
Revision: 03-May-11
For technical questions, contact: [email protected]
www.vishay.com
5
This document is subject to change without notice.
THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000
Legal Disclaimer Notice
www.vishay.com
Vishay
Disclaimer
ALL PRODUCT, PRODUCT SPECIFICATIONS AND DATA ARE SUBJECT TO CHANGE WITHOUT NOTICE TO IMPROVE
RELIABILITY, FUNCTION OR DESIGN OR OTHERWISE.
Vishay Intertechnology, Inc., its affiliates, agents, and employees, and all persons acting on its or their behalf (collectively,
“Vishay”), disclaim any and all liability for any errors, inaccuracies or incompleteness contained in any datasheet or in any other
disclosure relating to any product.
Vishay makes no warranty, representation or guarantee regarding the suitability of the products for any particular purpose or
the continuing production of any product. To the maximum extent permitted by applicable law, Vishay disclaims (i) any and all
liability arising out of the application or use of any product, (ii) any and all liability, including without limitation special,
consequential or incidental damages, and (iii) any and all implied warranties, including warranties of fitness for particular
purpose, non-infringement and merchantability.
Statements regarding the suitability of products for certain types of applications are based on Vishay’s knowledge of typical
requirements that are often placed on Vishay products in generic applications. Such statements are not binding statements
about the suitability of products for a particular application. It is the customer’s responsibility to validate that a particular
product with the properties described in the product specification is suitable for use in a particular application. Parameters
provided in datasheets and/or specifications may vary in different applications and performance may vary over time. All
operating parameters, including typical parameters, must be validated for each customer application by the customer’s
technical experts. Product specifications do not expand or otherwise modify Vishay’s terms and conditions of purchase,
including but not limited to the warranty expressed therein.
Except as expressly indicated in writing, Vishay products are not designed for use in medical, life-saving, or life-sustaining
applications or for any other application in which the failure of the Vishay product could result in personal injury or death.
Customers using or selling Vishay products not expressly indicated for use in such applications do so at their own risk. Please
contact authorized Vishay personnel to obtain written terms and conditions regarding products designed for such applications.
No license, express or implied, by estoppel or otherwise, to any intellectual property rights is granted by this document or by
any conduct of Vishay. Product names and markings noted herein may be trademarks of their respective owners.
Material Category Policy
Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as RoHS-Compliant fulfill the
definitions and restrictions defined under Directive 2011/65/EU of The European Parliament and of the Council
of June 8, 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment
(EEE) - recast, unless otherwise specified as non-compliant.
Please note that some Vishay documentation may still make reference to RoHS Directive 2002/95/EC. We confirm that
all the products identified as being compliant to Directive 2002/95/EC conform to Directive 2011/65/EU.
Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as Halogen-Free follow Halogen-Free
requirements as per JEDEC JS709A standards. Please note that some Vishay documentation may still make reference
to the IEC 61249-2-21 definition. We confirm that all the products identified as being compliant to IEC 61249-2-21
conform to JEDEC JS709A standards.
Revision: 02-Oct-12
1
Document Number: 91000
Similar pages