Automation Routes Findings
– Data Comm DCL Trials have found many FAA mandated routes in NAS are not loadable
– A review of ERAM adaptation and flight plan data revealed a significant number of other
non-loadable routes
– Identified ~6160 non-loadable facility adapted routes
• ADRs, ADARs, AARs, APRs , etc.
– Approximately ~7000 nationally published routes
• CDRs, Playbook Routes, IFR Pref. Routes
– Adapted routes containing Non-Loadable elements
• Airway to Airway no named intersection - ~ 686
–
(KIAH) .AEX6..MCB..MEI..MGM..AJFEB..GRD..J209..J207..FKN..J79..JFK..HTO..KPVD
• Radials flown as a route element. ~1500
–
(KSLC)..TCH.TCH094..MTU303.MTU..HBU
• 3 Letter Identifiers being utilized as origin and destination airports
–
–
Airports , CDR’s
ZNY Automation / Controller Entry
• Fake or Ghost Intersections
–
–
Computer assigned
AOC’s insert to make loadable today, some FMC’s have capability, not all.
• Coding that allows Airport to Airway intercepts ~387
–
KMEM J42 BKW J147 CSN OTT6 KBWI
• NAT Tracks, XXX
| Automation Brief
6/28/2016 | 2
Automation Routes
– 5 Element Strategy for Success
Education in the field
•
•
•
•
•
Automation Departments / POFM’s
Airspace Managers
AOC/GOC Airline Partners
Command Center
Air Space Design Groups
– OAPM
– PBN
need to discuss rules ahead of
fall planned meeting
– Briefings include invites to:
•
•
•
•
•
POFMs and their associated staffs
Airspace Manager and their associated staffs
TMU Manager and their associated staffs
Internal ARTCC Tower management
Chad Geyer National NATCA representative coordinates with Article 48 members and
Tower Union Representatives
| Automation Brief
6/28/2016 | 3
Automation Routes Briefing Schedule
Page 1
9/17/13
2014
M
A
M
J
J
2015
A
S
O
N
D
J
F
'14
Telecon
with Jamie
Meeting
with
OAPM
ZLC, ZHU
Facility Visit
National
POFM
Mtg
Meet with
UPS,
United Airlines
5/16/14
A
M
J
6/9
3/24
4/9-4/16
5/22
6/28
ZME
Center
7/1/14
A
S
Monthly Facility Status Updates to FAA
through 11/2016
AOC/GOC
Airline Partners
Meetings
Automation Routes
3/6
J
'15
Facility Visits and
Develop Center Milestone Schedule
Meet with
FedEx Airline
6/30/14
Command
Center
Meeting
M
8/6
ZJX, ZMA
Center
11/10/14
ZNY
Center
7/24/14
ZMP, ZAU, ZID
Centers
Rescheduling
ZSE, ZOA, ZLA
Centers
8/4/14
ZDV, ZAB, ZKC
Centers
8/11/14
7/16
8/13
11/24
ZOB, ZBW
Centers
9/15/14
9/25
HOU IOC
SLC IOC
IAH IOC
ZFW, ZDC, ZTL
Centers
10/27/14
To date
Communication / Coordination / Follow Up
Chart Updates
– occur every 56 days
– re-analyze data and TELCON follow up with sites previously visited
FAA Status
– Weekly meetings and monthly PMRs
Data Comm Implementation Team (DCIT) Feedback
– collect and report fixes being put into place
| Automation Brief
6/28/2016 | 4
Automation Routes Status
ARTCC
Progress
Follow-up
% Corrected (9/18/14 Chart Update)
S1P1 S1P2 Stereos/IFRs
Comments
ZLC
9/2/14
95%
31%
100%
ZHU
8/28/14
46%
21%
-91%
0%
1%
ZME
.
# of Attendees Briefing Status
13
3/25/14
18
3/26/14
2%
19
7/1/14
12 (no towers)
7/24/14
P2 Stereos increased almost 3X
ZNY
10/7/14
)%
27%
6%
ZSE
11/7/14
100%
35%
0%
15
8/5/14
ZLA
After 10/14/14
-13%
0%
0%
22
8/6/14
0%
2.2%
0%
13
8/7/14
ZOA
ZAB
11/18/14 interim update
4%
29%
8%
22
8/12/14
ZKC
10/16/14
-29%
-5%
0%
12
8/13/14
ZDV
10/9/14
0%
75%
29
8/14/14
ZOB
21
9/16/14
ZBW
14
9/18/14
ZMP
rescheduling
ZAU
rescheduling
ZID
rescheduling
-16%
Only 2 left for S1P1
ZDC
10/28/14
ZFW
10/29/14
ZTL
10/30/14
ZJX
11/12/14
ZMA
11/13/14
|
Automation Brief
Legend
Green
Lime
Completed
Planned
6/28/2016 | 5