22-Jan-13 10-Feb-13 Limited Trial for Revenue Service SUCCESS CRITERIA 1. 2. 3. Functional and Ops E to E checkout E to E document verification UM79, 80 and CAF Validated by dedicated crew, controller and dispatcher 4-Mar-13 DTAP Out of Service for Upgrade 4-Apr-13 Full Functionality Trial (Procedure ShakeOut) SUCCESS CRITERIA 1. Full Service Validation 2. Validated by technical dispatcher, flight crews and controllers 3. Local interview based data collection 4. Questionnaires 4-Aug-13 Full Functionality Trial (120d Safety Period) SUCCESS CRITERIA 1. Validated by line controllers, pilots and dispatchers 2. Integrated into daily Ops 3. Log Based Statistical Analysis 4. Volpe interviews 5. Questionnaires