DTA_Milestones.ppt

22-Jan-13
10-Feb-13
Limited Trial
for Revenue
Service
SUCCESS CRITERIA
1.
2.
3.
Functional and Ops E to
E checkout
E to E document
verification UM79, 80
and CAF
Validated by dedicated
crew, controller and
dispatcher
4-Mar-13
DTAP Out of
Service for
Upgrade
4-Apr-13
Full Functionality
Trial
(Procedure ShakeOut)
SUCCESS CRITERIA
1. Full Service Validation
2. Validated by technical
dispatcher, flight crews
and controllers
3. Local interview based
data collection
4. Questionnaires
4-Aug-13
Full Functionality
Trial
(120d Safety
Period)
SUCCESS CRITERIA
1. Validated by line
controllers, pilots and
dispatchers
2. Integrated into daily
Ops
3. Log Based Statistical
Analysis
4. Volpe interviews
5. Questionnaires