NCP4305FBDAPGEVB_TEST_PROCEDURE.pdf - 351 KB

Test Procedure for the NCP4305 Evaluation board
NCP4305FBDAPGEVB
27/09/2012
V
AC
Source
A
Figure 1: Test Setup
The following steps describe the test procedure for all these boards:
Required Equipment:
Current limited AC Power Supply (e.g. AGILENT 6811B) ……………………… 1pc
DC Volt-Meter able to measure up to 20 V DC (e.g. KEITHLEY 2000) ………… 1pc
DC Amp-Meter able to measure up to 6 A DC (e.g. FLUKE 89 IV)……………… 1pc
DC Volt-Meter able to measure up to 20 V DC (e.g. FLUKE 89 IV)…………… 1pc
DC Electronic Load (e.g. AGILENT 6060B) ……………………………………... 1pc
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, VIN = 85 Vac
3. Apply IOUT(load) = 100 mA
4. Check that VOUT = 12 Vdc
5. Set IOUT to 5.5 A
6. Check that VOUT = 12 Vdc
7. Apply an input voltage, VIN = 230 V
8. Check that VOUT = 12 Vdc
9. Check voltage at points according to Figure 2. It should be around 6 V.
10. Change load mode to resistive mode
11. Apply RLOAD = 1.3 Ω
12. Check VOUT = ~7.6 V, IOUT = ~5.9 A
13. Disconnect DC load
14. Check if VOUT slowly decreases down to 3 V and then quickly rises to 12 V
15. Turn off VIN
16. End of the test
DC
Load
+
+
V
Figure 2: Measure points