NCP59152DSADGEVB_TEST_PROCEDURE.PDF - 51.0 KB

A
A
V
V
ELECTRONIC
LOAD
REGULATED DC
SUPPLY
Test Procedure for the NCP59152DSADGEVB Evaluation Board
Figure 1: Test Setup
Test Procedure:
1.
2.
3.
4.
5.
6.
7.
8.
9.
Connect the test setup as shown in Figure 1
Apply an input voltage, Vin = 3.5 V dc
Apply Iout = 10 mA load
Check that Vout is 2.5 V
Increase Iout load to 1.5 A
Check that Vout is 2.5 V
Power down the load
Power down Vin
End of test
2/15/2012
-1-
www.onsemi.com