STK984-090AGEVB_TEST_PROCEDURE.pdf - 228 KB

Test Procedure for the STK984-090AGEVB Evaluation Board
[Supply Voltage]
VB1 (8 to 18V): Power Supply for 3-phase motor & Driver IC
Vcc (5V): Pull up Power Supply for DIAG1, DIAG2
[Operation Guide]
1. Motor Connection:
Connect the motor to OUT U and OUT V and OUT W.
2. Power Supply:
At first, supply DC voltage to VB.
Next, supply DC voltage to Vcc.
3. Motor Operation
4/2/2015
1
www.onsemi.com