DX8020 Assembling Instruction 2010

DX8020
ASSEMBLING INSTRUCTION
Moscow 2010
Complete set of DX8020
Measuring
Stand
Electronic
Block
Vacuum Station
with Turbo pump
Vacuum pipe
Power
cables/Three
Signal
Cables/Three
Vacuum gauge
with cable and
special
connector
Alarm
cables/Two
RS232 cable
Fixture/Four
Clamps/Three
Vacuum
Interconnector
Sealing rings/One
large, three small
1.
Take Vacuum Station
2.
Remove cover from top
3.
Put large vacuum seal ring
Seal ring
4.
Put vacuum interconnector
5.
Mount interconnector with use of four vacuum
fixtures
Fixtures
ring
6.
Put small vacuum seal ring
Seal ring
7.
Mount vacuum valve with use of vacuum clamp
8.
Connect vacuum pipe with use of vacuum clamp
9.
Place vacuum stand near vacuum pump station
Cover
10.
Remove cover from flange of vacuum pipeline
11.
Connect other side of vacuum pump to flange
onto measuring stand
12.
Take cables:
Three signal cables marked red, gray and blue
13.
Two alarm cables marked yellow and red
14.
Three power cables marked brown, white and
yellow
15.
RS232 cable
16.
Last cable with special connector is already
mounted to vacuum gauge
Cable with special
connector
17.
Take electronic block. Back side.
Connect yellow alarm cable
18.
Connect red signal cable
19.
Connect gray signal cable
20.
Connect RS232 cable
21.
Connect blue signal cable
22.
Connect red alarm cable
23.
Connect yellow power cable
25.
Connect white power cable to measuring stand
26.
Connect brown power cable between vacuum
pump and measuring stand
27.
Connect cable with special connector of vacuum
gauge to measuring stand.
28.
Look and the left of front of measurtinmg stand.
Connect yellow alarm cable
29.
Look and the left of front of measurtinmg stand.
Connect red alarm cable
30.
Look from bottom of measuring stand.
Connect blue sygnal cable as shown
Connector for
blue cable
31.
Look from right side measuring stand.
Connect red sygnal cable as shown
Connector for
red cable
32.
Look from bottom of measuring stand.
Connect gray sygnal cable as shown
Connector for
gray cable
33.
The DX8020 syspem is completed. Connect it to
power suppy by white and yeallow power cables.
34.
Switch On Electronic Block
35.
Switch On Measuring Stand.
Puch “Start” button. Vacuu pump will start
working
36.
Look at the screen of vacuum gauge to monitor
vacuum inside measuring chamber
Vacuum
gauge
37.
At vacuum about 5x10-3 topp system is ready for
operation (measurements).
Look into Device Manual for order of operation.
System
ready LED
38.
After finish of working to stop system:
Push “Stop” button for few second…
“Stop”
button
39.
… until yellow LED will light.
Vacuum pump will finish working – stopping of
turpo pump rotation.
Yellow LED
40.
Switch Off Measing Stand and Electronic Block