COMMISSIONING REPORT 24V Instruction Page Thanks for your interest in Saft’s products & services and downloading this document. This Ni-Cd battery commissioning report consists of this instruction page and 5 sections. The Cover page PART A: Charging record PART B: Discharge record (not for capacity purpose) PART C: Re-charging record PART D: Capacity test record This commissioning shall be performed by a qualified & trained personnel. IMPORTANT: Please strictly follow Saft Installation and Operating Instructions sheet which has been provided in the battery shipment packaging. Installation and Operating Instructions sheet can also be downloaded from our website on www.saftbatteries.com Note that Saft can perform the commissioning for you. Please contact your local Saft’s representative on www.saftbatteries.com for more details. This PDF file format can also be filled in directly on a PC for easier electronic forward back to Saft. Please use Adobe Reader XI or newer (free on Adobe web sites) Once completed, dated and signed, please return all pages to: E-mail: [email protected] Fax: + 46 491 681 10 SAFT Nickel-Cadmium Batteries Commissioning Report Ref N° ____________________ Saft order acknowledgment n°: ____________________ Customer order reference: ______________________ Customer name: ________________________________ Commissioning date (yy/mm/dd): ________________ End-user name: _________________________________ Battery location: ______________________________ Country & City: _________________________________ Project reference: ______________________________ Battery type: ___________________________________ No of cells: _______________ Date code (example 1306) _______________________ Delivered: Electrolyte: Solid Charger manufacturer: _________________________ Liquid Model: ______________________________________ Filled and charged Empty and discharged Charging method Constant current Charging current (start) Charging voltage (start) Charging current (end) Charging voltage (end) _________ A _________ V _________ A _________ V Constant Voltage (I/U characteristics) Charging current (start) _________ A Charging voltage (start) _________ V Charging current (end) _________ A Charging voltage (end) _________ V Charging time (yy/mm/dd & hh:mm): Date from: _____________ to: ______________ Time from: _____________ to: ______________ Sheet 1 of 7 Battery Commissioning Report PART A: CHARGING RECORD No. Hours 0 1 2 3 4 5 1st charge (0 to 15 hours) 6 7 8 9 10 11 12 13 14 15 Time (hh:mm) Charg. voltage Charg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) A1 Sheet 2 of 7 Battery Commissioning Report PART A: CHARGING RECORD No. Hours 16 17 18 19 20 1st charge (16 to 30 hours) 21 22 23 24 25 26 27 28 29 30 Time (hh:mm) Charg. voltage Charg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by: Company name Company name Company name Signature Signature Signature Name Name Name Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd) Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) A1 A2 Sheet 3 2 of 7 Battery Commissioning Report PART B: DISCHARGE RECORD (not for capacity purpose) No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5 Time (hh:mm) Discharg. voltage Discharg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by: Company name Company name Company name Signature Signature Signature Name Name Name Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd) Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) A1 B1 Sheet 4 2 of 7 Battery Commissioning Report PART C: RE-CHARGING RECORD No. Hours 0 1 2 3 4 5 2nd charge (0 to 15 hours) 6 7 8 9 10 11 12 13 14 15 Time (hh:mm) Charg. voltage Charg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) C1 Sheet 5 of 7 Battery Commissioning Report PART C: RE-CHARGING RECORD No. Hours 16 17 18 19 20 21 2nd charge (16 to 30 hours) 22 23 24 25 26 27 28 29 30 Time (hh:mm) Charg. voltage Charg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by: Company name Company name Company name Signature Signature Signature Name Name Name Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd) Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) C2 Sheet 6 of 7 Battery Commissioning Report PART D: CAPACITY TEST RECORD No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5 Time (hh:mm) Discharg. voltage Discharg. current Ambient T (°C) Electrolyte T (°C) Cell N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by: Company name Company name Company name Signature Signature Signature Name Name Name Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd) Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413) D1 Sheet 7 of 7