MSM Long Lead (Military M83401/24) www.vishay.com Vishay Dale Thick Film Resistor Networks, Military, MIL-PRF-83401 Qualified, Type RZ240, Single-In-Line, Molded SIP FEATURES • Isolated, bussed, and dual terminator schematics available • MIL-PRF-83401 qualified • 0.195" (4.95 mm) “A” maximum seated height • Thick film resistive elements • TCR available in “K” (± 100 ppm/°C) or “M” (± 300 ppm/°C) characteristic • All device leads are hot-solder dipped • Rugged molded case construction • Compatible with automatic insertion equipment • 100 % screen tested per group A, subgroup 1 of MIL-PRF-83401 • All devices are capable of passing the MIL-STD-202, method 210, condition D “Resistance to Soldering Heat” test • Available in tube pack STANDARD ELECTRICAL SPECIFICATIONS VISHAY DALE MODEL/ PIN NO/ PROFILE POWER POWER TEMPERATURE RATING RESISTANCE MIL RATING TOLERANCE (1) COEFFICIENT (2) WEIGHT MIL RANGE SPEC. SCHEMATIC ELEMENT PACKAGE STYLE ±% (-55 °C to +125 °C) g P70 °C SHEET P70 °C ± ppm/°C W W MSM10A-01-S4 MSM10A-03-S2 RZ240 24 MSM10A-05-S3 01 (C) 0.12 1.08 03 (G) 0.12 0.60 10 to 1M 10 to 1M 05 (H) 0.07 1.08 Consult factory 1, 2, 5 100, 300 0.6 Notes • DSCC has created a drawing to support the need for a 10 pin, single in line package (SIP), 0.350" maximum seated height resistor network product with an extended lead length. Vishay Dale is listed as a resource on this drawing as follows: DSCC DRAWING NUMBER 92013 VISHAY DALE MODEL POWER POWER MAX. TEMPERATURE RATING RATING RESISTANCE WORKING TOLERANCE (1) COEFFICIENT (2) RANGE SCHEMATIC ELEMENT PACKAGE ±% (-55 °C to +125 °C) VOLTAGE (1) P70 °C P70 °C ± ppm/°C V W W MSP10C-01-S125 01 (C) 0.2 1.8 10 to 1M MSP10C-03-S154 03 (G) 0.2 1.0 10 to 1M MSP10C-05-S122 05 (H) 0.11 1.8 Consult factory 1, 2, 5 100 50 • This drawing can be viewed at: www.landandmaritime.dla.mil/Programs/MilSpec/ListDwgs.aspx?DocTYPE=DSCCdwg. ± 2 % standard, ± 1 % and ± 5 % available (2) K = ± 100 ppm/°C; M = ± 300 ppm/°C (1) Revision: 10-Sep-15 Document Number: 31531 1 For technical questions, contact: [email protected] THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000 MSM Long Lead (Military M83401/24) www.vishay.com Vishay Dale GLOBAL PART NUMBER INFORMATION New Global Part Numbering: M8340124K1003GCD03 (preferred part numbering format) M 8 3 4 0 1 2 4 K 1 0 0 3 RESISTANCE TOLERANCE VALUE F=±1% K = 100 ppm 3 digit significant M83401 24 = 10 pin, G=±2% M = 300 ppm figure, followed “A” profile, J=±5% by a multiplier 0.190" leads 10R0 = 10 3302 = 33 k 1004 = 1 M Historical Part Number: M8340124K1003GC (will continue to be accepted) MIL STYLE SPEC. SHEET M83401 MIL STYLE CHARACTERISTIC 24 SPEC SHEET G C D 0 3 SCHEMATIC PACKAGING C = Bussed G = Isolated D03 = Tin/lead, tube DSL = Tin/lead, tube, single lot date code K 1003 G C D03 CHARACTERISTIC RESISTANCE VALUE TOLERANCE SCHEMATIC PACKAGING New Global Part Numbering: M8340124KA001GHD03 (preferred part numbering format) M 8 3 4 0 1 2 4 K A 0 0 1 RESISTANCE TOLERANCE VALUE F=±1% K = 100 ppm Per Std. M83401 24 = 10 pin, G=±2% M = 300 ppm MIL. Spec. “A” profile, J=±5% (see Impedance 0.190" leads Codes table) Historical Part Number: M8340124KA001GH (will continue to be accepted) MIL STYLE SPEC. SHEET M83401 MIL STYLE CHARACTERISTIC 24 SPEC SHEET G H D 0 3 SCHEMATIC PACKAGING H = Dual terminator D03 = Tin/lead, tube DSL = Tin/lead, tube, single lot date code K A001 G H D03 CHARACTERISTIC RESISTANCE VALUE TOLERANCE SCHEMATIC PACKAGING Note • For additional information on packaging, refer to the Through-Hole Network Packaging document (www.vishay.com/doc?31542). DIMENSIONS in inches (millimeters) “A” Profile 0.030 + 0.005 - 0.015 (0.762 + 0.127 - 0.381) Pin # 1 0.040 + 0.009 - 0.015 (1.02 + 0.229 - 0.381) 0.100 ± 0.005 (2.54 ± 0.127) Non-accumulative VISHAY DALE MODEL MSM10 0.017 ± 0.004 (0.432 ± 0.102) B C equal space 0.012 ± 0.004 (0.305 ± 0.102) B C 0.900 (22.86) 9 MECHANICAL SPECIFICATIONS MSM SERIES VDC 50 Voltage Coefficient of Resistance Veff < 50 ppm Dielectric Strength VAC 200 min. Insulation Resistance 10 000 M Operating Temperature Range °C -55 to +125 Storage Temperature Range °C -55 to +150 Revision: 10-Sep-15 0.190 + 0.015 - 0.010 (4.83 + 0.381 - 0.254) A UNIT Maximum Operating Voltage 0.187 + 0.008 - 0.010 (4.75 + 0.203 - 0.254) 0.983 ± 0.015 (24.97 ± 0.381) TECHNICAL SPECIFICATIONS PARAMETER 0.098 max. (2.49 max.) A Body Terminals Solderability Molded epoxy Copper alloy, hot-solder dipped Per MIL-PRF-83401 CAGE CODE: 91637 and 2799A (formerly SH903) Document Number: 31531 2 For technical questions, contact: [email protected] THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000 MSM Long Lead (Military M83401/24) www.vishay.com Vishay Dale MILITARY IMPEDANCE CODES CODE R1 () R2 () CODE R1 () R2 () A001 82 130 A011 330 680 A002 120 200 A012 1.5K 3.3K A003 130 210 A013 3K 6.2K A004 160 260 A014 180 270 A005 180 240 A015 270 270 A006 180 390 A016 560 560 A007 220 270 A017 560 1.2K A008 220 330 A018 620 2.7K A009 330 390 A019 150 1K A010 330 470 A020 1K 1K DERATING 01 Schematic “A” Profile MSM10A Package Power Rating (W) 1.08 Single Resistor 0.12 - 55 0 + 25 + 70 + 125 + 150 Ambient Temperature °C 03 Schematic Power Rating (W) “A” Profile 0.60 MSM10A Package 0.12 - 55 Single Resistor 0 + 25 + 70 + 125 + 150 Ambient Temperature °C Revision: 10-Sep-15 Document Number: 31531 3 For technical questions, contact: [email protected] THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000 MSM Long Lead (Military M83401/24) www.vishay.com Vishay Dale 05 Schematic Power Rating (W) “A” Profile MSM10A Package 1.08 Single Resistor 0.07 - 55 0 + 25 + 70 + 125 + 150 Ambient Temperature °C CIRCUIT APPLICATIONS 9 resistors with one pin common 01 Schematic “A” Profile MSM10A-01-S4 (M8340124xxxxxxC) The MSM10A-01-S4 molded single-in-line resistor network provides the user with 9 nominally equal resistors, each connected to a common pin (pin no. 1). Commonly used in the following applications: 1 2 3 n-1 • “Wired OR” pull-up • Power gate pull-up • MOS/ROM pull-up/pull-down n • Open collector pull-up • TTL input pull-down • TTL unused gate pull-up 5 isolated resistors 03 Schematic “A” Profile MSM10A-03-S2 (M8340124xxxxxxG) The MSM10A-03-S2 molded single-in-line resistor network provides the user with 5 nominally equal resistors. Each resistor is isolated from all others. Commonly used in the following applications: 1 2 3 4 n-1 • “Wired OR” pull-up • Power driven pull-up • Power gate pull-up • Line termination n 8 resistor pairs 05 Schematic R2 “A” Profile MSM10A-05-S3 (M8340124xxxxxxH) R1 1 Revision: 10-Sep-15 2 3 • Long-line impedance balance • LED current limiting • ECL output pull-down • TTL input pull-down n-1 n The MSM10A-05-S3 molded single-in-line resistor network provides the user with 8 pair of R1/R2 resistor values for pulse squaring and TTL dual-line terminating requirements. Document Number: 31531 4 For technical questions, contact: [email protected] THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000 MSM Long Lead (Military M83401/24) www.vishay.com Vishay Dale PERFORMANCE CONDITIONS MAX. R (TYPICAL TEST LOTS) 1.5 x rated power, applied 1.5 h “ON” and 0.5 h “OFF” for 100 h ± 4 h at +25 °C ambient temperature ± 0.50 % R 5 cycles between -65 °C and +125 °C ± 0.50 % R 2.5 x rated working voltage for 5 s ± 0.25 % R (Characteristic K) ± 0.50 % R (Characteristic M) 45 min at full rated working voltage at -65 °C ± 0.25 % R (Characteristic K) ± 0.50 % R (Characteristic M) 240 h with humidity ranging from 80 % RH to 98 % RH ± 0.50 % R Leads immersed in +260 °C solder to within 1/16" of body for 10 s ± 0.25 % R Total of 18 shocks at 100 g’s ± 0.25 % R Vibration 12 h at maximum of 20 g’s between 10 Hz and 2000 Hz ± 0.25 % R Load Life 1000 h at +70 °C, rated power applied 1.5 h “ON”, 0.5 h “OFF” for full 1000 h period ± 0.50 % R (Characteristic K) ± 2.00 % R (Characteristic M) 4 1/2 pound pull for 30 s ± 0.25 % R 10 000 M (minimum) - No evidence of arcing or damage (200 VRMS for 1 min) - TEST Power Conditioning Thermal Shock Short Time Overload Low Temperature Operation Moisture Resistance Resistance to Soldering Heat Shock Terminal Strength Insulation Resistance Dielectric Withstanding Voltage Revision: 10-Sep-15 Document Number: 31531 5 For technical questions, contact: [email protected] THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE. THE PRODUCTS DESCRIBED HEREIN AND THIS DOCUMENT ARE SUBJECT TO SPECIFIC DISCLAIMERS, SET FORTH AT www.vishay.com/doc?91000 Legal Disclaimer Notice www.vishay.com Vishay Disclaimer ALL PRODUCT, PRODUCT SPECIFICATIONS AND DATA ARE SUBJECT TO CHANGE WITHOUT NOTICE TO IMPROVE RELIABILITY, FUNCTION OR DESIGN OR OTHERWISE. Vishay Intertechnology, Inc., its affiliates, agents, and employees, and all persons acting on its or their behalf (collectively, “Vishay”), disclaim any and all liability for any errors, inaccuracies or incompleteness contained in any datasheet or in any other disclosure relating to any product. Vishay makes no warranty, representation or guarantee regarding the suitability of the products for any particular purpose or the continuing production of any product. To the maximum extent permitted by applicable law, Vishay disclaims (i) any and all liability arising out of the application or use of any product, (ii) any and all liability, including without limitation special, consequential or incidental damages, and (iii) any and all implied warranties, including warranties of fitness for particular purpose, non-infringement and merchantability. Statements regarding the suitability of products for certain types of applications are based on Vishay’s knowledge of typical requirements that are often placed on Vishay products in generic applications. Such statements are not binding statements about the suitability of products for a particular application. It is the customer’s responsibility to validate that a particular product with the properties described in the product specification is suitable for use in a particular application. Parameters provided in datasheets and/or specifications may vary in different applications and performance may vary over time. All operating parameters, including typical parameters, must be validated for each customer application by the customer’s technical experts. Product specifications do not expand or otherwise modify Vishay’s terms and conditions of purchase, including but not limited to the warranty expressed therein. Except as expressly indicated in writing, Vishay products are not designed for use in medical, life-saving, or life-sustaining applications or for any other application in which the failure of the Vishay product could result in personal injury or death. Customers using or selling Vishay products not expressly indicated for use in such applications do so at their own risk. Please contact authorized Vishay personnel to obtain written terms and conditions regarding products designed for such applications. No license, express or implied, by estoppel or otherwise, to any intellectual property rights is granted by this document or by any conduct of Vishay. Product names and markings noted herein may be trademarks of their respective owners. Material Category Policy Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as RoHS-Compliant fulfill the definitions and restrictions defined under Directive 2011/65/EU of The European Parliament and of the Council of June 8, 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (EEE) - recast, unless otherwise specified as non-compliant. Please note that some Vishay documentation may still make reference to RoHS Directive 2002/95/EC. We confirm that all the products identified as being compliant to Directive 2002/95/EC conform to Directive 2011/65/EU. Vishay Intertechnology, Inc. hereby certifies that all its products that are identified as Halogen-Free follow Halogen-Free requirements as per JEDEC JS709A standards. Please note that some Vishay documentation may still make reference to the IEC 61249-2-21 definition. We confirm that all the products identified as being compliant to IEC 61249-2-21 conform to JEDEC JS709A standards. Revision: 02-Oct-12 1 Document Number: 91000