Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to: DCIT, Meeting #18 Presented by: Pete Muraca Date: September 26, 2012 Federal Aviation Administration Agenda • End to End Functional Testing – to date • Documentation – to date • Lab Test Environment • DCL Trials Test Timeline • Lab Photos DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 2 End to End Functional Testing – to date • DTAP Build 2 (adds UM79: CLEARED TO (position) VIA (route) & AOC Dispatch Out Copy) - Run system test cases with Tech Center bench avionics - Run system test cases with Boeing and Airbus labs (multiple flight deck configs) - Exercised test scenarios with DCIT aircraft - Conducted Regression testing • Documented / Socialized Findings Total discovered to date: 37 • Resolution(s) Outstanding PTRs High 6 Medium 10 Low 12 - All High PTRs and most others being addressed / resolved in DTAP Build 3 (Oct 1, 2012) - Build 3 also adds UM80 - Continue system testing for added functionality, and Regression DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation •3 Administration 3 Documentation • • Concept / Requirements Note: contract deliverables are being managed / - Requirements Document documented between Thales/ITT and FAA personnel - SSS System Test Cases - Exercising defined test procedures associated with testable requirements - • Traceability with Requirements Mapped with Test Cases Association with documented PTRs Categorized in association with DTAP Build / Releases PTRs / Reporting - • Pass / Fail test cases are being tracked VRTM - • – to date All PTRs are being documented, tracked and socialized Internal Data Comm program reporting on a weekly basis E-E Functional Test Report (planned) E-E Functional and Operational Test Report (planned) Working Schedule - Following test schedule to the extent possible. Adapting as constraints and programmatics impact the working schedule DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation •4 Administration 4 Lab Test Environment • • • • • • • • • Currently running DTAP Build / Release 2 HADDS connectivity and simulation capability FNTB connectivity for external FAA G/G communications Ground/Ground and Air/Ground Communication service via ARINC Ground/Ground and Air/Ground Communication service via SITA is planned (work in progress) Full utilization of Boeing configurable flight deck Full utilization of Airbus configurable flight deck Full utilization of FAA Technical Center bench avionics DCIT Airlines Participation (Jerry Smith / Andy Fry will cover with greater details in related brief) • Internal and External resources allocated • Plans and Procedures in place DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation •5 Administration 5 DCL Trials – MEM Timeline (updated: 9/24/2012) pDTAP and Update Tech Center DTAP E-E Functional Testing DTAP 1&2 setup/prep AFN and CPDLC connect with Boeing event (July 31, Aug 3, 7, 11) DCL & AFN attempt with DCIT aircraft pre-arranged event # 1 (Aug 28, 29 & 30) Activities @ MEM Video crew @ Tech Center event (Sept. 13) Video crew @ MEM event (Sept. 24) Conduct Dry Run & Prep OT&E Sept 10-14 DTAP 2 setup/install&ch eckout @ MEM AFN and CPDLC connect with Airbus event (Aug 6-8) Controllers early look & feel (Aug. 29) May 10 (B1) Aug 17 • pDTAP / HADDS vin box test • pDTAP / HADDS via FNTB Failover / Rev # test • pDTAP / HADDS / CSP Interface via FNTB + bench Avionics • pDTAP (applicable reqs/VRTM) testing with bench avionics • pDTAP testing via Boeing + Airbus air labs • PTR fixes / regression • Test Cases document final (B1) = CAF, Revised DCLs other than route, CHI, AFN (B2) Aug 22 Sept 3 Sept 7 • • • • • • • Sept 14 Sept 17 Controller OT (Prep / Dry Run & Conduct) System test case / bench avionics System test case / Boeing air lab System test case / Airbus air lab System test case / DCIT aircraft Error conditions / failover PTR fixes / regression • 8/23/1012: Security Assessment • • • • (B2) = Adds UM79, AOC DC (no ack) Regression with B2 (in lab) Regression with B3 (Oct 1 in lab) Regression with B4 (Oct 23 in lab) E-E Functional Test Report (B3) = Adds UM80 • • • • • • • • • • AFN, DCL, Revisions with DCIT aircraft event # 2 @ Tech Center (Oct. 10 & 11) MEM Training Oct 29 – Nov 10 Func. Regression & Operational (B3) OT&E SAT (B4) Oct 1 Oct 15-25 Oct 23 Nov 12 Trials Start Install & checkout MEM / FDX Training 11/2/2012: Facility / User Review SAT sub_test cases final SAT sub_test cases functional testing/ FedEx aircraft E-E Operational scenarios based on DCIT doc / Live aircraft Error conditions / failover in field 9/27/1012: Security Assessment Regression with B3 (in lab & in field) SAT Test Report (B4) = Adds FIDO (B5) Nov 30 (B5) = Adds UM83 & gate response processing Lab Photos DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 7 •Lab Photos DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 8 DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 9 DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 10 •Lab Photos DCL Trials – Test Status DCIT #18 (September 26, 2012) Federal Aviation Administration 11