NCL30105GEVB_TEST_PROCEDURE.PDF - 731.0 KB

Test Procedure for the NCL30105GEVB Evaluation Board
Figure 1 : Test Setup 1
January 10, 2012
-1-
Required Equipment:
 dc Voltage supply, up to 80V, 1A.
Model No: TOPWARD Dual Tracking Power Supply 6603D.
 dc Voltage supply, up to 24V, 1A.
Model No: XANTREX XT30-2.
 Voltage source meter up to 5V
Model No: KEITHLEY 2400 Source Meter
 Voltage meter
Model No: HP 34401A Multimeter
 Current meter
Model No: HP 34401A Multimeter
 Function Generator
Model No: HP 33120A
 Scope and current probe
Scope: Tektronix TDS5034B; Current Probe: Tektronix AM503B
 18-20 LED string as the load. (could be replaced by zeners and LEDs in series, as
long as the load voltage is ~60V with a drive current of 350mA), the LED string
could be using LXH8-PW27 in series or other LED products with similar
features.
Efficiency- Setup 1 Test Procedure:
1. Connect the test setup as shown in Figure 1. Verify J3 and J5 jumpers are open
as illustrated.
2. Slowly ramp the input voltage from 0V up to Vin = 80 V. (See Note 1)
3. Apply the supply voltage, Vcc = 12 V.
4. Check that IOUT is 350mA+/-3% nominal and Vout is in the range of 60V
nominal.
5. Check the efficiency is above 94%, Efficiency = Iout*Vout / (Iin*Vin)
6. A typical waveform is shown in Figure 2:
1/20/2012
-2-
www.onsemi.com
Figure 2 : Test Setup 1 Waveforms
CH1 – yellow – the MOSFET gate drive signal,
CH2 – blue – the MOSFET drain signal,
CH3 – green – the output current (average is about 347mA)
7. Power down the VCC.
8. Slowly ramp down Vin from 80V to 0V.
9. End of the efficiency test
1/20/2012
-3-
www.onsemi.com
Iadjust Function- Setup 2 Test Procedure:
Figure 3 : Test Setup 2
Setup 2 Test Procedure:
1. Modify the test setup as shown in Figure 3. Verify J3 and J5 jumpers are open as
illustrated.
2. Slowly ramp the input voltage from 0V up to Vin = 80 V. (See Note 1)
3. Apply the input voltage, Vcc = 12 V.
4. Apply the input voltage for Iadjust pin, VIadjust = 5 V.
5. Check that IOUT is 350mA and Vout is in the range of 60V nominal with LED
load.
6. Use the power supply for Iadjust pin to adjust the voltage from 0 V to 5V. Check
the output current and voltage reading.
Here is the reference on the Iadjust voltage vs. output current.
Iadjust voltage (V)
1.0V
2.0V
3.0V
4.0V
5.0V
LED current (mA)
100-105
229-235
340-355
340-355
340-355
7. Power down the 5V power supply for Iadjust pin.
8. Power down the VCC.
9. Slowly ramp down Vin from 80V to oV.
10. End of the test
1/20/2012
-4-
www.onsemi.com
Dimming function- Setup 3 Test Procedure :
Figure 4 : Test Setup 3
Setup 3 Test Procedure:
1. Connect the test setup as shown in Figure 4 and verify J3 and J5 jumpers are left
open as illustrated.
2. Slowly ramp the input voltage from 0V up to Vin = 80 V. (See Note 1)
3. Apply the input voltage, Vcc = 12 V.
4. Check that IOUT is 350mA and Vout is 60V (nominal) LEDs string.
5. Use the function generator to generate a 1 kHz PWM signal with a low level of
0V and high level of 3.3V. Change the duty cycle of this PWM waveform to
change the average LED current.
The operating waveforms with a duty ratio of 0.5 are shown in Figure 5.
1/20/2012
-5-
www.onsemi.com
Figure 5 : Test Setup 3 Waveforms
CH1 – yellow – the 1KHz PWM signal,
CH2 – blue – the MOSFET gate drive signal,
CH3 – green – the output current (average is about 171.2mA)
6. Check the output current changes as the PWM signal duty cycle is changed.
Here for reference is the PWM duty cycle vs. output current when J4 is left
open.
Duty cycle
75%
50%
25%
20%
LED current (mA)
62-68
170-177
255-265
270-285
7. Power down the function generator.
8. Power down the VCC.
9. Slowly ramp down Vin from 80V to oV.
10. End of the dimming test.
Note 1:
To ensure the NCL30105 demo board working properly, it needs a sequencing power up. The
80V input rail voltage has to be power on first, and the Vcc rail voltage for the IC controller
should be powered on after the 80V input.
1/20/2012
-6-
www.onsemi.com