Conduit and Tubing System Accessories BAND-MASTER™ ATS Shield Termination System Band-Master™ ATS shield termination system Fast, Cost-Effective Shield Termination Attach cable braid shields to EMI backshells with Band-Master ™ ATS stainless steel straps. The Band-Master ™ ATS system offers fast termination and the flexibility to handle different diameters with the same band. IMPORTANT NOTE: ALWAYS DOUBLE-WRAP BANDS! Contact Glenair or visit our website (glenair.com) to view our complete line of Band-Master™ ATS products, including pneumatic tools for high production and calibration kits. Micro Band Tool Part Number 600-061 Standard Band Tool Part Number 600-058 1.18 lbs. / 6.75 Inches (172mm.) Length How To Order Bands Width Length Part Number Accomodates Dia. Band Type Use With Tool In. mm. In. mm. Uncoiled Coiled Micro Band, Standard Length .120 3.05 8.125 206.38 Micro Band, Extended Length .120 3.05 14.25 361.95 Standard Band, Standard Length .240 6.10 14.256 362.10 Standard Band, Extended Length .240 6.10 18.00 457.20 600-057 600-083 600-052 600-090 600-057-1 600-083-1 600-052-1 600-090-1 Band-Master™ ATS Shield Termination Instructions Adapter 600-061 600-061 600-058 600-058 © 2012 Glenair, Inc. mm. 22.35 1.88 47.75 1.80 45.72 2.50 63.50 .400 (1.2mm) Min. Length Braid Over Termination Area Retention Lip Conductors Braid 1. Prepare Cable Braid for termination process (Figure 1). 2. Push Braid forward over Adapter Retention Lip to the Adapter Incline Point (or .4" [10.2mm] minimum braid length). MILk Braid as required to remove slack and insure a snug fit around the shield termination area (Figure 2). 3. Prepare the Band in the following manner: IMPORTANT: Due to Connector/Adapter circumference, it may be necessary to prepare the Band around the Cable or Retention Area. A. Roll Band through the Buckle Slot twice. (Bands must be double-coiled.) B. Pull on Band until Mark ( ) is within approximately .250 inch (6.4mm) of Buckle Slot (Figure 3). The Band may be tightened further if desired. NOTE: Prepared Band should have ( ) Mark visible approximately where shown in Figure 3. In. .88 Shield Termination Clamping Process (Figures 4 thru 8) NOTE: To free Tool Handles, move Holding Clips to center of Tool. 4. Squeeze Gripper Release Lever and insert Band into the front end opening of the Tool. (NOTE: Circular portion of looped band must always face downward.) 5. Aligning the Band and Tool with the Shield Termination Area, squeeze Black Pull-Up Handle repeatedly using short strokes until it locks against Tool Body. (This indicates the Band is compressed to the Tool Precalibrated Tension.) NOTE: If alignment of band and shield is unsatisfactory, tension on band can be relaxed by pushing on slotted release lever on top of tool. Make adjustments as necessary and again squeeze black pullup handle. 6. Complete the Clamping Process by squeezing the Gray Cut-Off Handle. 7. Remove excess band from tool and dispose. 8. Inspect Shield Termination. U.S. CAGE Code 06324 1 Adapter Incline Buckle 3 2 Tail Length Indicator Mark 4 G 5 6 7 8 Printed in U.S.A. GLENAIR, INC. • 1211 AIR WAY • GLENDALE, CA 91201-2497 • 818-247-6000 • FAX 818-500-9912 www.glenair.com G-15 E-Mail: [email protected]