PATCHRUNNER Vertical Cable Manager

PATCHRUNNER Vertical Cable Manager
INSTALLATION INSTRUCTIONS CM293K
© Panduit Corp. 2010
PART NUMBERS
VERTICAL CABLE MANAGEMENT
Single Sided
Dual Sided
PRV15
PRV12
PRV10
PRV8
PRV6
PRVF15
PRVF12
PRVF10
PRVF8
PRVF6
CONTENTS
(1) PATCHRUNNER Vertical Cable Manager
(6) 1/2-13 Hex Nuts
(6) 1/2-13x2.0” Bolts
(12) Washers for 1/2-13 bolts
(4) Spools
(2) .91 long 1/2-13 Bolt Spacers
* Spools sold separately for PRV6 & PRVF6
DUAL HINGED SINGLE HINGED
DOORS
DOORS
PRD15
PRD12
PRSHD12
PRD10
PRD8
PRSHD8
PRD6
PRSHD6
All PatchRunner Managers and Dual Hinged Doors are available in 96" tall versions
(PRV**96, PRVF**96, and PRD**96) **= 6,8,10,12,or 15 inch wide
6 inch and 12 inch wide PatchRunner Managers and Dual Hinged Doors are also available in
79" tall versions (PRV679, PRVF679, PRD679, PRV1279, PRVF1279, PRV1279)
LOCATION GUIDE - STANDARD EIA RACK
6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
15 “Vertical Manager dimensions shown in brackets {...}
Center Mounting of a PATCHRUNNER on Standard EIA Rack
After the first rack is mounted to the floor with the
appropriate hardware, Use Three 1/2-13x2.0” bolts
(supplied with the vertical cable manager panels) to
Top Location
fasten the PATCHRUNNER Vertical Cable Manager
Bolt
to the rack. Next, mount the second rack to the
(For Front Only & Front & Rear
Manager)
other side of the PATCHRUNNER Vertical Cable
Manager using the remaining 1/2-13x2.0” bolts. Then
mount the second rack to the floor using the appropriate
hardware.
Middle Location
Bolt
(For Front Only Manager
& Front & Rear Manager)
Spacer
Bottom Location
Bolt and Spacer
(For Front Only Manager)
Bolt
(For Front & Rear Manager)
Signifies Bottom
Recommended bolt placement for mounting
manager to rack channel.
Note:
Tighten bolts to 120 lbs.-in.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 1 of 4
INSTALLATION INSTRUCTIONS CM293K
INSTALLATION OF SPOOLS
Step 1
Align buttons with mounting leg slot
Mounting Leg Slots
Mounting Face
Angled Flange
Step 3
Step 2
Apply downward pressure until plastic
spool clicks into place.
Push buttons through backbone until
mounting face is flush with backbone.
Removal/Replacement
Step 4
Pull back on angled flange while applying upward pressure
Step 5
Repeat steps 1-3
DUAL HINGED DOOR BRACKET INSTALLATION
Attach cross braces with #10-32 screws to door bracket as shown in
picture below. Align angled notch on cross brace with angled notch
on door bracket when tightening screws.
FINGER REMOVAL
Apply inward pressure at finger ends to remove finger
Score Groove
Cross Brace
(4) Screws
Door Bracket
Angled Notches
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 2 of 4
INSTALLATION INSTRUCTIONS CM293K
DUAL HINGED DOOR INSTALLATION
Align lower pins with lower hinge pin mounting holes. Squeeze
release knobs together, then align upper door pins with upper hinge
pin mounting holes. Release pressure on the release knobs to set
door in place.
SINGLE HINGED DOOR INSTALLATION
Align lower door pin with lower hinge pin mounting hole. Then
align upper door pin with upper hinge pin mounting hole pull down
on pin and insert it into the mounting hole.Door can be hinged to
the right or left by reversing top and bottom.
Magnet Stop
Upper Hinge Pin Mounting Hole
Door Bracket installs in
the same fashion as the
Dual Hinge Bracket
Upper Door Pin
Upper Hinge Pin Mounting Hole
Release Knobs
Upper Hinge Pin
Door
Lower Door Pin
Door
Lower
Hinge Pin
Mounting Hole
Lower
Hinge Pin
Mounting Hole
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN’ all
purpose cleaner (or local equivalent) and a lint free cloth
Lower Hinge Pin
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN’ all
purpose cleaner (or local equivalent) and a lint free cloth
ROUTING CABLE
Patch Panels Through
PATCHRUNNER Vertical Cable Manager
Route cables through fingers of PATCHRUNNER Vertical Manager maintaining
cable bend radii. Use a slot on the PATCHRUNNER Vertical Cable Manager that is the
same height as the patch panel. Proper
routing for angled patch panel and flat
patch panel shown below.
Angled Patch Panel Detail
Flat Patch Panel Detail
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 4
INSTALLATION INSTRUCTIONS CM293K
Note: For additional information reference CD routing guidelines
SA-RKCD01
EXAMPLES OF ROUTING PATCH CORD SLACK
Route distribution cable
from ceiling to rear
of PRV manager
Rack to rack pathways
Same rack
crossover
pathway
(NCMHAEF4 or
NMF4)
(Note: Avoid Using as
pathways to route from
rack to rack)
15 RU SWITCH
Rack to rack pathways
(NCMHAEF2 or NMF2)
Route distribution cable
from floor to rear
of PRV manager
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 4 of 4
E-mail:
[email protected]
Fax:
(708)444-6448