Download Datasheet STE Steam Turbine SST-110 TWIN CA56 (PDF).

Data Record for Used Industrial Steam Turbines / Turbosets
Turbine
Original Equipment Manufacturer (OEM):
Siemens Turbomachinery Equipment GmbH (STE)
Turbine model:
SST-110 TWIN CA56 (CFR5+AFA6)
Machine No.:
Year of manufacture: 2009
Design output (MW)
[at best turbine efficiency]:
Maximum output (MW): 3.24
Steam consumption at design output (kg/kWh):
1)
_
Steam consumption at max. output (kg/kWh):
Max. main steam temperature (°C) : 465
Main steam temperature (°C)1): 420
Main steam pressure (bar g)1): 39
Main steam flow (t/h)1): 16
Exhaust steam temperature (°C)1): 386
Exhaust steam flow (t/h)1):
Exhaust steam pressure (bar): 1.3
Extraction pressure (bar g)2):
Extraction flow (t/h)2):
Speed (rpm): 1,500
Allowable frequency range (Hz): 50
Direction of rotation:
Exhaust steam nozzle (downward, upward, right, left or axial): upward
Non-drive end of turbine (HP/LP end): gear
Package (yes/no), if yes, please state configuration (turbine, gear unit, generator, compressor):
In case of package, is integral lube oil system provided? (yes/no):
or extract from Operating Manual
Load points
1
2
3
Main steam parameters
Main steam flow (t/h)
Extraction pressure (bar)
Extraction flow (t/h)
Exh. steam pressure (bar)
Exh. steam temp. (°C)1)
Terminal output (kW)
Turbine condition
Last minor overhaul:
Last major overhaul: 11/2013
Operating hours: 33,943
Date of turbine shutdown and preservation details: still in operation
Expected to be available as from: June 2015
1) in accordance with turbine design
2) where applicable
Siemens AG
Energy Sector; Management: Lisa Davis
Energy Service Division; Management: Randy Zwirn
Oil & Gas and Industrial Applications Services; Management: Willibald Meixner
Frankenstr. 70-80
90461 Nuernberg
Germany
Tel.: +49 (911) 4130 0
Fax: +49 (911) 4130 440
Siemens Aktiengesellschaft: Chairman of the Supervisory Board: Gerhard Cromme;
Managing Board: Joe Kaeser, Chairman, President and Chief Executive Officer; Roland Busch, Lisa Davis, Klaus Helmrich,
Hermann Requardt, Siegfried Russwurm, Ralf P. Thomas
Registered offices: Berlin and Munich, Germany; Commercial registries: Berlin Charlottenburg, HRB 12300, Munich, HRB 6684
WEEE-Reg.-No. DE 23691322
SCF 08/2014 V13.06
Are spare parts available? If yes, which ones?
Turbine control and protection system
Original Equipment Manufacturer (OEM):
Hydraulic or electronic:
Overspeed protection system (hydraulic [bolt]/electronic):
Axial shaft position monitoring system (hydraulic [nozzle]/electronic):
Vibration monitoring system (yes/no):
Actuators for control and stop valve(s) (HP/LP hydraulic system):
Magnet wheel installed on turbine shaft (yes/no, if yes, please state number of teeth):
Electrohydraulic converter installed (yes/no):
Condenser:
Original Equipment Manufacturer (OEM):
Condenser model:
Condensing capacity (t/h):
Condenser pressure (bar):
Cooling water flow (m 3/h):
Cooling water velocity (m/s):
Cooling water inlet temperature (°C):
Thermal capacity (MW):
Supply lines:
Complete operating documentation available (yes/no): yes
Complete machine file available (yes/no): yes
Is the driven machine also available for purchase (yes/no): no
SCF 08/2014 V13.06
Driven generator
Machine No.:
Original Equipment Manufacturer (OEM):
Rating (MVA):
Generator type (cooling system):
Generator model:
Voltage (kV):
Frequency (Hz):
Current (A):
Power factor (cos phi):
Speed (rpm):
Design: e.g. B3
Insulation class:
Type of enclosure:
Cooling water inlet temperature (°C):
Cooling water flow (m 3/h):
Compound excitation (… V - … A):
Generator condition
Last minor overhaul:
Last major overhaul:
Operating hours:
Date of turbine shutdown and preservation details:
Expected to be available as from:
Gear unit:
Original Equipment Manufacturer (OEM): SIEMENS
Gear unit model:
single-stage, single helical toothed three-shaft spur
gear
Rating (HP)
Speed (rpm):
Complete scope of supply available for purchase:
·
Turbine TWIN CA 56
·
Gear
Further notes:
·
Not included are turbine control and protection system, generator
·
Scoring at rotor of AFA6, if necessary rotor has to be replaced
·
·
·
·
Size (footprint) / dimensions:
Please provide photographs of the turboset / turbine separately in electronic form.
SCF 08/2014 V13.06