A A V V ELECTRONIC LOAD REGULATED DC SUPPLY Test Procedure for the NCP58302DSADGEVB Evaluation Board Figure 1: Test Setup Test Procedure: 1. Connect the test setup as shown in Figure 1. 2. Apply an input voltage, Vin = 3.5 V dc 3. Apply Iout = 10 mA load. 4. Check that Vout is 2.5 V 5. Increase Iout load to 3.0 A 6. Check that Vout is 2.5 V 7. Power down the load 8. Power down Vin 9. End of test 7/17/2012 -1- www.onsemi.com