CoolTrans Manual / Bedienungsanleitung Operating Manual CoolTrans 100 kW Modular Cooling Water Compact Station with Integrated Dew-point Control Useful performance 100 kW per each module Bedienungsanleitung CoolTrans 100 KW modulare Kühlwasserkompaktstation mit integrierter Taupunksteuerung Nutzkühlleistung 100 KW je Modul (ab Seite 41 ) date / Datum 2008-10-07 CoolTrans issue / Ausgabe 01.998.362.0 issue / Ausgabe f author / erstellt Wolfgang Trepte Carsten Dietze 01.998.362.0 / Ausgabe f reviewed / geprüft Heiko Ebermann page / Seite1/80 CoolTrans Manual / Bedienungsanleitung Contents page 0. General ....................................................................................................................................... 3 1. 1.1 1.2. Safety .......................................................................................................................................... 3 Safety Symbols........................................................................................................................... 3 Safety Advice.............................................................................................................................. 4 2. 2.1 Operating Conditions................................................................................................................. 7 Water Quality Requirements...................................................................................................... 8 3. 3.1 3.2 Description ................................................................................................................................. 9 Automatic Dew-point Control .................................................................................................... 9 Dimensions and Technical Specifications ............................................................................... 9 4. Storage, Handling and Installation ...........................................................................................11 5. 5.1 5.2 Commissioning of the System..................................................................................................12 Default Settings.........................................................................................................................16 Examples for Mounting Hydraulic Connections ......................................................................17 6. 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.2 Control .......................................................................................................................................19 Universal Control Unit...............................................................................................................19 General Control Information .....................................................................................................19 Control Settings ........................................................................................................................20 Control Information ...................................................................................................................22 Fault Messages..........................................................................................................................22 Fault Acknowledgement ...........................................................................................................24 Elimination of Faults .................................................................................................................25 Fault Messages and Their Reporting........................................................................................25 Humidity Calculator...................................................................................................................26 7. 7.1 7.2 Maintenance ..............................................................................................................................28 Maintenance Intervals ...............................................................................................................28 Safety Subassembly..................................................................................................................29 8. Customer Service, Manufacturers’ Addresses ........................................................................30 9. 9.1 9.2 9.3 Annexes .....................................................................................................................................31 Hydraulic Diagram.....................................................................................................................31 Electrical Circuit Diagram (also note enclosed variant) ..........................................................32 Item List Including Maintenance and Spare Parts ...................................................................40 CoolTrans 01.998.362.0 / Ausgabe f page / Seite2/80 CoolTrans Manual / Bedienungsanleitung 0. General The CoolTrans offers temperature control of the cooling water, also depending on humidity and the hydraulic separation of the secondary cooling water circuit of the cooling water supply from the building. The CoolTrans can be extended in a modular way to a capacity of up to 500 kW and serves the cooling water supply of server cabinets in a closed circuit. The secondary cooling water temperature is controlled via a slip-in valve which is arranged in the primary cooling water circuit. The system is completely wired and the control as well as the electrical connection are effected via a switch box arranged inside the CoolTrans. 1. 1.1 Safety Safety Symbols The following symbols refer to certain hazards or provide you with information regarding safe operation. Warning! Dangerous point! Safety note! Danger by electrical current or high voltage Caution! Hot surface Caution! Rotating parts Disconnect prior to works! Warning! Indicates possible damage to the device Warning! Dangerous voltage CoolTrans 01.998.362.0 / Ausgabe f page / Seite3/80 CoolTrans Manual / Bedienungsanleitung Attention! Indicates possible danger to the environment Important note, information 1.2. Safety Advice Our engineers can provide comprehensive advice regarding the assembly of the CoolTrans. Comprehensive material, functionality and quality checks guaranty a high rate of utilisation and long service life. Still, these devices may bear hazards if operated improperly by unskilled staff and if not used according to their intended purpose. Please read these assembly and operating instructions carefully prior to any assembly and commissioning of the CoolTrans. Its electrical installation complies with applicable VDE regulations and rules for preventing accidents. Hazardous voltage (higher than 50V AC or higher than 100V DC) can be encountered: behind switch cabinet doors Use only original fuses of the specified electrical current. Immediately switch off the device if the electrical supply or cold-water supply are disturbed. Voltage hazard Maintenance and cleaning only to be carried out by specialists, who must take every precaution to disconnect the device from any power supply at the time of maintenance and cleaning. Therefore, take the device out of operation prior to any works and according to instructions. CoolTrans 01.998.362.0 / Ausgabe f page / Seite4/80 CoolTrans Manual / Bedienungsanleitung This equipment has been designed in compliance with the following guidelines and regulations: 89/393/EWG Maschinenrichtlinie vom 1.01.1995 (Machine Guideline of 01/01/95) 89/336/EWG Richtlinie über die elektromagnetische Verträglichkeit vom 1.01.1996 (Guideline regarding Electromagnetic Compatibility of 01/01/96) 73/23/EWG Niederspannungsrichtlinie vom 2.01.1997 (Low-voltage Guideline of 02/01/97) ENEV Energiesparverordnung (Energy-saving Regulations) DIN 1988 Technische Regeln für die Trinkwasserinstallation (Technical Rules for Fresh-water Installation) DIN 4747-1 Fernwärmeanlagen; Sicherheitstechnische Ausführung von Unterstationen, Hausstationen and Hausanlagen (Long-distance Heat Supply Systems; Safety-technology Design of Sub-stations, Stations and Systems within Buildings) DIN- EN 292-1,2 Sicherheit von Maschinen, Grundsätze, allgemeine Gestaltungsleitsätze (Safety of Machines, Principal Rules, General Design Guidelines) DIN- EN 50081-1,2 Elektromagnetische Verträglichkeit (EMV) Fachgrundnorm Störaussendung (Electro-magnetic Compatibility (EMC) Specific Basic Standards of Emitted Interference) DIN- EN 6100-3-2;3 Elektromagnetische Verträglichkeit (EMV) Grenzwerte (Electro-magnetic Compatibility (EMC) Limit Values) DIN- EN 60204-1 Sicherheit von Maschinen - Elektrische Ausrüstung von Maschinen Allgemeine Sicherheit (Machine Safety - Electrical Equipment of Machines General Safety) DIN- EN 60335-1 Sicherheit elektrischer Geräte für den Hausgebrauch and ähnliche Zwecke (Safety of Electrical Devices for Domestic Use and Similar Purposes) Hazard by improper handling of the device Cleaning and maintenance must only be carried out by specialists. For keeping the device operationally reliable and for safeguarding its long service life, its maintenance and cleaning intervals must unconditionally be observed. Operate the CoolTrans only within the specified capacity limits and only using approved operating material. CoolTrans 01.998.362.0 / Ausgabe f page / Seite5/80 CoolTrans Manual / Bedienungsanleitung When working on and with the device, please bear in mind: Respectively applicable regulations (e.g., VDE regulations or other nationally applicable guidelines) Applicable rules for preventing accidents (BGV) Relevant regulations Applicable laws for the protection of the environment Operate the device only in its perfect condition. In the event of malfunction or faults, the device must immediately be taken out of operation and the respective person in charge must be informed of this incident. The device must not be taken into operation again until its fault-free functionality has been restored. Caution! Hot surface Faulty pumps, power supply units, control boards may have run hot. Allow them to cool down prior to assembly. Arbitrary modification or making of spare parts Modification or alterations are only admissible after approval by the manufacturer. Genuine spare parts and accessories approved by the manufacturer guaranty safety. Application of other parts may exempt the manufacturer of the cooling water compact station from any liability for consequences resulting thereof. Inadmissible operation Operational safety of the supplied station is only guaranteed if applied according to its intended purpose. The limit values specified must not be exceeded in any case. Warranty Any claim for warranty requires expert assembly and commissioning in accordance with the assembly, commissioning and operating instructions applicable to the device. Necessary assembly, commissioning and maintenance works must only be carried out by authorised expert personnel. CoolTrans 01.998.362.0 / Ausgabe f page / Seite6/80 CoolTrans Manual / Bedienungsanleitung 2. Operating Conditions Purposeful Use The device represents a heat transfer station for heat discharge via cooling water out of water-cooled server cabinets. The CoolTrans serves to separate the primary cooling water network from the secondary cooling water network. The pumps within the network have been designed to guaranty sufficient heat discharge from the server cabinets. In order to facilitate safe heat discharge, the connection (piping network) between the CoolTrans and the equipment to be cooled needs to be designed according to the rules of technology and to the performance parameters. By means of diffusion-proof insulation, the installation of the CoolTrans itself is independent of the humidity of ambient air. The CoolTrans must be installed frost-proof. The floor must be capable of bearing the CoolTrans load. (distributed among four legs carrying lumped load each) Temperature at the place of installation: 5°C to 35°C Absolute humidity at the place of installation: Any Water temperature, flow, primary: 4°C - 8°C (other temperature upon inquiry) Water temperature, return, primary: 11°C - 14°C (other temperature upon inquiry) Temperature spread of water: 6K Application of antifreezers in the cooling water: Primary circuit up to 35% Secondary circuit upon inquiry Max. operating pressure: Primary Secondary 16 bar 6 bar Blowing-off pressure safety valve Secondary 2.5 bar Water connection, primary: Water connection, secondary Possible from either side of the unit Possible from either side of the unit Nominal voltage: 3 x 400V / 16A 50 Hz to 60 Hz CoolTrans 01.998.362.0 / Ausgabe f page / Seite7/80 CoolTrans Manual / Bedienungsanleitung 2.1 Water Quality Requirements For safely operating the CoolTrans, the cooling water must be available at specified water quantity, temperature and pressure. The water quality must comply with VGB-R 455 P. The requirements of the primary water quality are, apart from those data as specified in the Annex, as follows: In order to safeguard maximum service life of the system, the supplied cooling water must comply with the VGB-Kühlwasser-Richtlinien (VGB-R 455 P) (VGB Cooling Water Guidelines VGB-R 455 P). The applied cooling water must be soft enough to prevent any depositing; however, it must not be too soft since this might result in corroding the system. The following table contains the most important impurifications as well as methods for their removal: Impurification of the water Mechanical impurification (dp > 0.8 mm) Excess hardness Moderate content of mechanical impurification and hardeners Moderate content of chemical impurification Method of removal Filtering of the water Softening of the water by ion exchange Addition of dispersion or stabilising agents Addition of passivation agents and inhibitors Addition of biocides Biological impurification (bacteria and algae) It is recommended to meet the following hydrological data as far as possible: Hydrological data pH values Free carbonic acid Nitrates Sulphates Sulphides Chlorides (at 25°C) Ammonia Iron Manganese Conductivity 6–9 < 20 < 100 < 50 not detectable < 800 <2 < 1.5 < 0.5 < 30 Max. concentration of antifreezers (glycol) mg/l mg/l mg/l mg/l mg/l mg/l mg/l S/cm 35% )* The application of a dirt trap of an aperture size of < 0,8mm in the primary flow is generally recommended in order to avoid probable disturbances in the plate heat exchanger. We recommend a second dirt trap as a by-pass line for uninterruptible maintenance. CoolTrans 01.998.362.0 / Ausgabe f page / Seite8/80 CoolTrans Manual / Bedienungsanleitung 3. Description The CoolTrans is of modular design and connected to the cooling water circuit of the building (e.g., to the cooling water circuit of the air conditioning of the building) The high-level capacity heat exchanger installed in the CoolTrans separates the cooling water circuit of the server cabinets from the cooling water circuit of the building. The secondary cooling water is controlled by a motor-driven two-way valve on the primary side. The control valve is equipped with a redundant emergency running function, i.e. in the event of disturbance, it will open automatically and the entire heat can be discharged from the secondary circuit. The dew-point temperature is monitored within the CoolTrans. The secondary cooling water flow temperature is automatically raised to such a level that no condensate may form at the server cabinets. For this purpose, the inclusive humidity sensor needs to be installed in the room where the server cabinets are placed and must be connected to the CoolTrans. 3.1 Automatic Dew-point Control The CoolTrans is equipped with automatic dew-point control. For this purpose, the ambient humidity at the installation site of the water-cooled racks (CoolTherm / CoolAdd) is permanently recorded and assessed by means of an inclusive hygrostat. It will then be converted by means of an internal computer and assigned to a cooling water temperature. The CoolTrans is programmed in such a way that the cooling water temperature will always be 1K above the dew-point temperature. 3.2 Dimensions and Technical Specifications Figure CoolTrans 100( threeD) CoolTrans 01.998.362.0 / Ausgabe f page / Seite9/80 CoolTrans Manual / Bedienungsanleitung Figure CoolTrans 100 (Standard) front view Overview technical data CoolTrans sizes item-no. capacity (kW) hight *) (mm) width *) (mm) depth *) (mm) weight (kg) pipe connection primary secondary pressure loss primary (bar) static head sekundary (bar) electrical power supply (V, Hz, kW) 08.009.503.8 (Standard) 100 1840 1620 600 500 4 x DN 100 4 x DN 100 1,4 1,25 400 / 50 / 1,0 08.009.503.8. 000004 100 1840 1800 800 530 4 x DN 100 4 x DN 100 1,0 1,54 400 / 50 / 1,0 08.009.508.8 100 1840 1620 800 550 4 x DN 125 4 x DN 125 1,4 1,25 400 / 50 / 1,0 08.009.509.8 100 1840 2520 800 830 4 x DN 100 4 x DN 100 0,2 1,1 400 / 50 / 1,0 item-no. capacity (kW) chilled water temperature primary (°C) chilled water temperature secondary (°C) flow rate primary (anti freeze agent up to 35%) (m³/h) flow rate secondary (m³/h) operating pressure primary (bar) operating pressure secondary (bar) 08.009.503.8 (Standard) 100 4 – 8 / 12 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)* 08.009.503.8. 000004 100 10 / 16 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)* 08.009.508.8 100 4 – 8 / 12 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)* 08.009.509.8 100 13 / 19 15 / 21 18,0 14,4 16 6 (SV 2,5)* *) dimensions with sheet cover **) response pressure safety valve CoolTrans 01.998.362.0 / Ausgabe f page / Seite10/80 CoolTrans Manual / Bedienungsanleitung Differential pressure CoolTrans 100 KW, Heat Exchange WP7M-50 2,500 Differential pressure [bar] 2,000 1,500 Lift of pump, external, secundary [bar] pressure loss, primary [bar] 1,000 0,500 0,000 0 20 40 60 80 100 Capacity [KW] Figure: Lift of pump / pressure loss, in dependence on volume flow 4. Storage, Handling and Installation The CTU must only be stored and handled in its completely drained condition. (possible damage by freezing) In preparation for shipment ex works, the CoolTrans Unit is placed on a wooden pallet. After removing the blinds, a forklift, for example, can underride the CTU frame and lift it from the pallet. A low lift platform truck or a forklift can then take it to the place of installation. Please observe admissible areas and lumped loads on floors. When placing the CoolTrans, it must be balanced horizontally by means of its adjustable legs. Small tolerances in height can be adjusted during installation. (+/- 2.5 cm) CoolTrans 01.998.362.0 / Ausgabe f page / Seite11/80 CoolTrans Manual / Bedienungsanleitung Four adjustable legs for horizontal adjustment Blind for underriding by means of a fork, removed Photo: Handling by low platform lift truck 5. Commissioning of the System After aligning it, the primary and secondary connection flanges need to be connected to the piping systems. Outlets that are not required must be closed with blind flanges and insulated (vapour barrier) In order to better access the left secondary flanges, the switch cabinet may be detached: 1.) Loosen the four fastening bolts of the switch cabinet Photo: CoolTrans Fastening bolts of the switch cabinet 01.998.362.0 / Ausgabe f page / Seite12/80 CoolTrans Manual / Bedienungsanleitung Photo: Loosening the fastening bolts by means of a socket spanner 2.) Placing the switch cabinet on the pull-out rails Free access to flanges Photo: Switch cabinet, resting on pull-out rails CoolTrans 01.998.362.0 / Ausgabe f Switch cabinet on pull-out rails page / Seite13/80 CoolTrans Manual / Bedienungsanleitung Photo: Flange connection, here: intermediate flange for connecting another CTU Note: Bends can be connected directly to to the flange in order to immediately access the false floor. Adjustment of admission pressure at the membrane extension tank For this purpose, the tank must be drained of water and be without any counterpressure (bleeding screw at express coupling open). Valve nozzle (Schrader) for checking the gas blanket of the tank Express coupling to the extension tank Hexagon socket screw for stopping (always open and to be lead-sealed) Bleeding ball valve of the extension tank (to be operated from rear) Photo: Membrane extension tank with express coupling Rule of thumb: P flow = min 1 bar, otherwise geodetic height of the installation above tank + 0.2 bar. Leak test of the entire installation, if necessary in sections, applying compressed air. Caution: The safety valve opens at 2.5 bar, The membrane extension tank must not be charged in excess of 3 bar. In case of higher pressures, close the safety valve with the help of a blind cap and close the tank at express coupling (hexagon socket screw), but to be removed and opened after pressure testing again and to be lead-sealed against unauthorised closing! CoolTrans 01.998.362.0 / Ausgabe f page / Seite14/80 CoolTrans Manual / Bedienungsanleitung Filling the system (secondary circuit) For this purpose, fill in the medium (water via filling nozzle, flanges, etc.) and carefully air bleed the system. Recommended static filling pressure: Note: min. 1.5 bar max. 2.0 bar The safety valve will open at 2.5 bar. Both pressure gauges must show the same value when non-operative. Thermometers / pressure gauges, secondary circuit Two air bleeding valves at the most elevated point of the unit (not shown here) Safety valve, secondary circuit with draining bend Filling and bleeding ball valve, secondary circuit Power connection corresponding to the wiring scheme Note: Please check pump rotating fielf before switch on After the first filling, switch on pumps for approx. one minute to let air bubbles move to the most elevated points. Air bleeding, if necessary filling up again, to be repeated until there are no air bubbles left in the system. Note: As with all installations operated by water as a heat medium, the process of air bleeding may – due to physical necessity – take a longer period of time, i.e. regular bleeding, if necessary filling up again, is required several times and does not constitute a deficiency. CoolTrans 01.998.362.0 / Ausgabe f page / Seite15/80 CoolTrans Manual / Bedienungsanleitung Advice regarding the pipe installation outside the CTU: Creating a most elevated point for central air bleeding Example: 5.1 Default Settings The CTU is shipped with the following settings that are relevant to the user: Pump change-over: Mondays at 10:00 hrs Desired temperature, secondary flow: 12°C (without moisture shift) Time change to CET Daylight Saving Time: 25 March, at 02:00 hrs Time change to CET Standard Time: 25 October, at 03:00 hrs Admission pressure at membrane extension tank: 1.5 bar Triggering pressure for both minimal pressure reliefs: CoolTrans pre alarm main alarm 01.998.362.0 / Ausgabe f 0.5 bar 0.2 bar page / Seite16/80 CoolTrans Manual / Bedienungsanleitung 5.2 Examples for Mounting Hydraulic Connections Up to five CoolTrans modules of a total capacity of 500 kW can jointly be installed. Connection is made by flanges DN 100, PN 16. A) Serial arrangement of CoolTrans with intermediately arranged distribution modules Up to a maximum of five CoolTrans modules with intermediately arranged distribution modules. The CoolTrans can optionally be connected from either their left or their right to the network in the building. Also, redundant connection from both sides to two separate cooling water circuits is possible. CTU distributor CTU distributor CTU distributor CTU distributor Cooling water secondary network C TU Cooling water primary network B) Serial arrangement of CoolTrans with an overall distribution unit Up to a maximum of five CoolTrans modules with a connected optional distribution unit. The distribution unit will be adapted to the desired number of cooling water circuits. CTU CTU CTU CTU CTU distributor Cooling water secondary network Cooling water primary network CoolTrans 01.998.362.0 / Ausgabe f page / Seite17/80 CoolTrans Manual / Bedienungsanleitung C) Individual arrangement or serial arrangement with a subsequent Tichelmann ring Up to a maximum of five CoolTrans can be connected. The secondary and the primary cooling water circuits can be connected on one or also on two sides. The connection which is not required can be closed by means of blind flanges. Cooling water secondary network Cooling water primary network D) Single arrangement or serial arrangement with a subsequent supply ring Up to a maximum of five CoolTrans can be connected. The secondary and the primary cooling water circuits can be connected on two sides. For the reason of feeding the ring from both sides, a redundancy of n+1 is achieved. Cooling water secondary network Cooling water primary network CoolTrans 01.998.362.0 / Ausgabe f page / Seite18/80 CoolTrans Manual / Bedienungsanleitung 6. Control The control unit consists of a universal control and a humidity calculator which automatically evaluates the ambient humidity measured and which, if there is any risk of condensate formation, will raise the cooling water temperature. 6.1 Universal Control Unit 6.1.1 General Control Information 1 Display 2 INFO button request important system data explanations regarding the various data items 3 Push-turn knob (OK) turn: push: 4 Return key (ESC) select menu line or set value confirm menu line or value return to previous menu All operations necessary for handling the control, such as setting and reading values, are carried out at the universal control unit. All entries into the control unit are transferred to the control where they are processed and stored. Navigation in the menu If unattended, the display will always show the start page. CoolTrans Main menu 1. Press push-turn knob “OK”. Menu line appears. 2. Turn push-turn knob “OK”. The cursor jumps from one line to the next. 3. The selected line appears inversely shaded: background dark, text light. 4. Select the desired line. 5. Confirm by pressing the push-turn knob “OK”. 6. You are now in the sub-menu. 7. The three dots (...) after the text mean that more sub-menus follow. 01.998.362.0 / Ausgabe f page / Seite19/80 CoolTrans Manual / Bedienungsanleitung 8. Follow the described path by turning the push-turn knob “OK” in order to find the line or confirm this line. 9. At the end of the path you will get to the adjustable value. 10. Confirm values by using push-turn knob “OK”. By using the key (ESC) you will return to the respectively previous entry or menu item If the key (ESC) is pressed several times, you will return to the start page. An access right is defined for each parameter (operational side). There are three levels of access: Level Access User level (for the system operator) The user level is always accessible. All data visible here can be altered by the user. Service level (for maintenance) Press the push-turn knob “OK” and return key “ESC” simultaneously, then select the operating line “Servicelevel” and confirm by pressing the push-turn knob. Press the push-turn knob “OK” and return key “ESC” simultaneously, then select the operating line “Password” and confirm by pressing the push-turn knob; subsequently enter the password (only the specialist firm is authorised to make entries) and confirm by pressing the push-turn knob. Password level (for commissioning) Symbol 6.1.2 Control Settings Upon initial commissioning, the control will report a fault message. In order to remove it, the clock time and the date have to be set. Setting the time / date Main menu > Time of day / date Operational line Range Default setting Time of day 00:00 .... 24:00 00:00 Date 01.01 ………... 31.12 [Day/Month] 01.01 Year 2000 ... 2080 2000 Central European Daylight Saving Time automatically changes to Central European Standard Time. (see Default Settings) Language selection Each type of device has been loaded with several languages. Upon switching on the CoolTrans for the first time, it will use German. Languages may also be changed during operation. CoolTrans 01.998.362.0 / Ausgabe f page / Seite20/80 CoolTrans Manual / Bedienungsanleitung Selecting a language Main menu > settings > device > Operational line Range Default setting Sprache Language . . de en . . Deutsch English . . Setting the flow temperature Main menu > settings > controller1 > setpoints Operational line Range Default setting upp prcom setp 12°C upper comf setp 12°C low comf setp 12°C low prcom setp 12°C First set “upp prcom setp” and “low prcom setp” for the desired cooling water flow temperature, then set “upper comf setp” and “low comf setp“ for the desired temperature. All four values need to equal each other. Polling service life The length of service life of the pumps can be polled from the control. Main menu > settings > data collection > operating hours > operating hours 1 ... 2 Operational line Range Operating hours* Display 0 ... 99 999 h Operating hours since maintenance Display 0 ... 99 999 h Reset** No, Yes Default setting No * Displaying accumulated hours of operation, counting up to 99,999 hours, then beginning at 0 again ** This data item resets the item “Operating hours since maintenance” to 0 hours CoolTrans 01.998.362.0 / Ausgabe f page / Seite21/80 CoolTrans Manual / Bedienungsanleitung 6.1.3 Control Information If, during automatic operation mode, it is desired to know the current state, move to the “Info” level. 1. Return to the start page by pressing the “ESC” key 2. Press the “INFO” button Repeatedly pressing the “INFO” button will guide you to the various “Info” pages. The following data, e.g., may be polled: Room operating mode (scheduled, actual, reason) Timer Cooling water – actual value and currently effective scheduled value Ambient humidity 6.1.4 Fault Messages Legend 1 LED “Run” for displaying the operation mode of the device; whereas the following applies: LED ON: Supply voltage available; no fault in application or periphery LED OFF: No supply voltage 2 Push-button with LED (red) for displaying a fault message and its acknowledgement; whereas the following applies: LED flashing: Fault message ready for acknowledgement LED ON: Fault message awaiting attention, but not yet unlocked LED OFF: No fault message Press push-button to acknowledge fault or unlock LED flashing 1. Press push-button in order to acknowledge the fault. 2. If LED is still ON, the fault has not been eliminated or it must be unlocked by pressing the pushbutton again. LED ON 1. Eliminate the fault. 2. If LED is still ON, the fault can be unlocked by pressing push-button Unlocking a fault only becomes possible after eliminating its cause. . The control menu “Faults” displays which fault is currently awaiting attention. The following will be displayed for each fault: - its cause, e.g., pump, control valve - its fault number - date and clock time of its occurrence Main menu > Faults > Faults current CoolTrans displays which fault is currently awaiting attention >Fault history displays previous ten faults 01.998.362.0 / Ausgabe f page / Seite22/80 CoolTrans Manual / Bedienungsanleitung Fault Code List Code No. + Text Fault / Caused by Fault Elimination 3011 Control fault Sensor error / cable broken, sensor disconnected Check sensor for flow temperature Pump disturbance Pump 1 / Motor 1 A excess load Check pump, exchange protective excess-load switch of motor Pump disturbance Pump 2 / Motor 1 B excess load Check pump, exchange protective excess-load switch of motor Chilled water static pressure under 0.5 bar Check chilled water network for leackages, Refill chilled water System time failure Set date / clock time Control valve has been in position 100% for more than 30 min Compare scheduled/actual values Check primary temperatures 1314 KKP1 error 1315 KKP1 error 9003 5001 9002 Control deviation CoolTrans 01.998.362.0 / Ausgabe f page / Seite23/80 CoolTrans Manual / Bedienungsanleitung 6.1.5 Fault Acknowledgement On the service level of the control, the list “Fault history” can be deleted via the operational line “Delete faults”. Main menu > Faults > Operational line Remark Delete faults All current faults are unlocked internally; the list “Fault history” will be deleted. Upon activating this function, all other fault messages are also unlocked at the same time. Only those faults that are still awaiting attention will remain on the display. group fault indication fault pressure minimal Erase fault inidcation by pressing the button. CoolTrans 01.998.362.0 / Ausgabe f page / Seite24/80 CoolTrans Manual / Bedienungsanleitung 6.1.6 Elimination of Faults Question Answer Upon commissioning, an inappropriate language was chosen. How can I find my language? 1. Press “ESC” and “OK” simultaneously 2. Select password level and enter 112 as a password and confirm it by pressing “OK”. Language will change to English. 3. Change to your language in the menu “Settings > Device > Language”. Fault message 101 “Sensor fault does not permit acknowledgement.” Password level (only for service staff) Upon exiting the menu “commissioning”, it will be checked as to which sensors are connected. Should, at a later time, one of the sensors as were initially reported connected detected to be missing, a fault message will be generated. Should a sensor have been wired wrongly and later, during operation, have been re-wired, a “false” fault message may be generated. Elimination: Return to the menu “commissioning “ (Caution! System is put on hold!), then back to the main menu (Caution! System re-starts!). 6.1.7 Fault Messages and Their Reporting The following are available as potential-free change-over contacts for fault messaging: - Fault message P-min (for detecting water losses in the cooling water system) - Fault message Control - Fault message Pump 1 - Fault message Pump 2 - Batch fault message When connected to any central control technology, it is possible to transmit fault messages as a binary signal to a SICLIMATX. CoolTrans 01.998.362.0 / Ausgabe f page / Seite25/80 CoolTrans Manual / Bedienungsanleitung 6.2 Humidity Calculator Photo: Humidity Calculator The hygrostat which comes with the CoolTrans, loosely packaged as a separate unit, serves to determine ambient humidity at the place of CoolTherm installation. For this purpose, a connection cable of five wires needs to be laid to the humidity calculator. Recommended cable type: JY(St) Y 4x2x0,8 Do not install in recesses or behind curtains. Avoid direct sunlight. The hygrostat is to install at the coldest place where the CoolTherms or any other HDCS gadgets are installed, e.g. in the raised floor. Installation instructions are printed on the device wrapping. Hygrostat dimensions: 100 x 90 x 32 mm Photo: Hygrostat CoolTrans 01.998.362.0 / Ausgabe f page / Seite26/80 CoolTrans Manual / Bedienungsanleitung The increase of the cooling water temperature in the secondary network is based on the deposited HX diagram with the dew-point temperature. Flow temperature coooling water [°C] in dependence on absolute humidity 24 22 Flow temperature [°C] 20 18 Flow temperature [°C] cooling water 16 14 12 10 8 10 12 14 16 18 20 Absolute humidity [g/kg air] Figure: Increase of flow temperature in dependence on measured humidity Function of the water sensor inside the tub Alarm-reset button Sensor with cable (sensor in tub) Up to three water sensors can be connected to the basic unit. The standard version comes equipped with one sensor cable, two more sensor cables can be connected optionally. An alarm is triggered by the built-in potential-free relay contact. A signal transmitter has been installed to trigger the alarm. The respectively triggered loop can be detected by means of the three LEDs. The alarm is deleted by pressing the reset button. The leak-water detector will trigger an alarm at a water-film level of 0.5 mm in the tub. CoolTrans 01.998.362.0 / Ausgabe f page / Seite27/80 CoolTrans Manual / Bedienungsanleitung 7. 7.1 Maintenance Maintenance Intervals The user takes responsibility for carrying out the maintenance and replacement measures as described in the following and for observing the prescribed time intervals. The firm Knürr recommends the following replacement intervals: - exchange of the pump group after two years operating time at utmost utilisation - exchange of the valve drive after two years operating time at utmost utilisation The firm Knürr recommends the following check intervals: - annual check of admission pressure at the extension tank, nitrogen probably to be refilled - annual functional check of the flap trap - annual functional check of the control valve . annual functional check of the safety valve - annual functional check of the temperature controllers / pressure controllers - annual check of the filter screens on the secondary side, check screen for damage, clean the screen - annual check of pump gland tightness Dirt trap Check at least annually for impurification and, if necessary, clean the filter screen. One dirt trap has been installed on the suction side of each pump in the secondary circuit. Photo: Dirt trap - regularly check pressure on the secondary side and, if necessary, refill cooling water - regularly check the safety subassembly for leakage - regularly check for damage, corrosion, leakage - regularly check insulation for damage and completeness - regularly check temperature and pressure gauges for damage - regularly check pump bearings for noise Switch cabinet - regularly check the optical and acoustic controls inside the switch cabinet - regularly check contactors and relays for wear-and-tear and damage - annually check switch and control processes - annually check functionality of emergency setting - annually check position encoder/limit transmitter for functionality - annually check control circuit for set values CoolTrans 01.998.362.0 / Ausgabe f page / Seite28/80 CoolTrans Manual / Bedienungsanleitung 7.2 Safety Subassembly Extension tank (ET) The admission pressure at the extension tank must regularly be checked. If the extension tank is leaking or defect, it must be replaced. Fill-in valve admission pressure ET (pV = pstat) Safety valve Extension tank Photo: Safety subassembly max. operating excess pressure 3 bar (Type N: in known version until approx. May 2000, then incorporated into EU version max. Operating excess pressure 6 to 10 bar, from 50 litres) max. operating temperature 393 K (120°C) max. temperature lkoad on membrane 343 K (70°C) Fill-in valve with protective cap Gas space Membrane Water space Water connection Figure:Cross-section of the membrane extension tank CoolTrans 01.998.362.0 / Ausgabe f page / Seite29/80 CoolTrans Manual / Bedienungsanleitung Safety valve Safety valve The operating pressure of the secondary cooling water network shall at least be 5% below the closing pressure of the safety valve (2.5 bar). By means of airing, the valve should at least once annually be checked for functionality. Prior to dismantling, please take care that the safety valve is pressurerelieved. Cap valve Annual maintenance requires checking the admission pressure in the extension tank. For this purpose, the connection of the water-side to the extension tank must be drained. Remove the lead seal from the cap valve, remove the cap and close the valve by turning it down by means of a hexagon socket spanner. Now the membrane extension tank is separated from the cooling water system. Subsequently open the drain valve. Then check the admission pressure by means of a pressure gauge, compare it with the pressure specified on the device label and, if necessary, fill up with nitrogen. After pressure testing, slowly open the cap valve. As soon as water flows out of the drain valve, close it again. After that the cap must be put on again and newly leadsealed. 8. Customer Service, Manufacturers’ Addresses All Knürr products are subject to permanent quality control and comply with applicable regulations. In case of any issues relating to our products, please do not hesitate to contact the fitters of your system or directly: Knürr AG Raubaer Straße 1 01623 Lommatzsch Phone: +49 (0) 800 000 6295 E-mail: [email protected] CoolTrans 01.998.362.0 / Ausgabe f page / Seite30/80 CoolTrans Manual / Bedienungsanleitung 9. 9.1 Annexes Hydraulic Diagram DDC control No.: Designation 2 5 6 24 27 31 34 40 42 43 48 57 58 59 64 68 72 75 79 86 88 96 Shut-off valve Connection of extension tank Humidity sensor (at place of installation of CoolTherm / CoolAdd) Control valve (primary flow control), fail safe Bleeding Fill-in and drainage valve Cap valve Ball valve Pressure gauge Membrane extension tank Plate heat exchanger Non-return valve Control / switch cabinet Dirt trap Safety pressure limiter (min) Safety valve Actuating drive (currentless – open) Temperature sensor Thermometer Circulation pump (redundant) Plunger valve Fitting piece for subsequent installation of a cold meter CoolTrans 01.998.362.0 / Ausgabe f page / Seite31/80 CoolTrans Manual / Bedienungsanleitung 9.2 Electrical Circuit Diagram (also note enclosed variant) CoolTrans 01.998.362.0 / Ausgabe f page / Seite32/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite33/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite34/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite35/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite36/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite37/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite38/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite39/80 CoolTrans Manual / Bedienungsanleitung 9.3 Item List Including Maintenance and Spare Parts Pos. Denomination Type / Make 1 Gate valve Primary circuit Samson 322k DN 50 (10/4“AG) PN 25 kvs 25 150°C RG 2 Actuating drive 3 Bourdon tube gauge Samson 5825-25 STR II IP 54 24 VAC 0-10V/4-20, actuating time: 70s lift: 12mm Manotherm 0 ...16 bar DM:100mm ½”, connection from below 140°C GK 1,0 4 Bourdon tube gauge Manotherm 0..6 bar DM:100mm ½”, connection from below 140°C GK 1,0 5 Machine thermometer Sika -30 ... 50°C Typ 174 B 110x30 straight L=63mm ½“ MS 6 Plate heat exchanger WTT WP 7-50 M DN 50 (FL) PN 30, without consoles 7 Plate heat exchanger WTT WP 7-150 M DN 50 (FL) PN 30, without consoles 8 Safety valve Götze 851 BF ½“ x 1“ IG 2,5 bar Rg / EPDM, distinguishing letter F 9 Pressure control device (min) Sauter DSB 138 F001 DN15 (1/2“ AG) PN 12 70°C 0..1.6bar TÜV 10 Extension tank Reflex F24 DN 20 (3/4“ AG) PN 3, admission pressure 1.5 bar 11 Dirt trap Barberi DN 50 (2“ IG) PN 16 110°C Ms 12 Block pump Wilo BAC 40/128-1,5/2-s DN 40 (6/4“) x DN 50 (2“) PN 6 400VAC -15..60°C 13 Non-return valve Rittag SR 70.16 DN 50 PN 16 120°C, brass, intermediate flange 14 Screwed-in sensor Ni1000TK5000, SFK 01 -50 … +160°C, replaceable, 150 x 8 x 1 mm CoolTrans 01.998.362.0 / Ausgabe f page / Seite40/80 CoolTrans Manual / Bedienungsanleitung Inhalt Seite 0. Allgemein...................................................................................................................................42 1. 1.1 1.2. Sicherheit...................................................................................................................................42 Arbeitssicherheits- Symbole ....................................................................................................42 Sicherheitshinweis....................................................................................................................43 2. 2.1 Einsatzbedingungen .................................................................................................................46 Anforderungen an die Wasserqualität......................................................................................47 3. 3.1 3.2 Beschreibung ............................................................................................................................48 Automatische Taupunksteuerung ............................................................................................48 Abmessungen und Technische Daten .....................................................................................48 4. Lagerung, Transport und Aufstellung ......................................................................................50 5. 5.1 5.2 Inbetriebnahme der Anlage.......................................................................................................51 Werkseinstellungen...................................................................................................................56 Montagebeispiele für hydraulischen Anschluss......................................................................56 6. 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.2 Steuerung ..................................................................................................................................58 Universalregler ..........................................................................................................................58 Allgemeine Reglerinformationen ..............................................................................................58 Reglereinstellungen ..................................................................................................................60 Reglerinformationen .................................................................................................................61 Störmeldungen..........................................................................................................................61 Störungsquittierung ..................................................................................................................64 Behebung von Fehlern..............................................................................................................65 Störungsmeldungen und Weiterleitung ...................................................................................65 Feuchterechner .........................................................................................................................66 7. 7.1 7.2 Wartungstätigkeiten ..................................................................................................................68 Wartungsintervalle ....................................................................................................................68 Sicherheitsbaugruppe...............................................................................................................69 8. Kundendienst, Herstelleradressen ...........................................................................................70 9. 9.2 9.2 9.3 Anlagen......................................................................................................................................71 Hydraulischer Schaltplan..........................................................................................................71 Elektroschaltplan (ggf. beigelegte Variante beachten)............................................................72 Stückliste mit Wartungs- bzw. Ersatzteilen..............................................................................80 CoolTrans 01.998.362.0 / Ausgabe f page / Seite41/80 CoolTrans Manual / Bedienungsanleitung 0. Allgemein Die CoolTrans bietet eine Temperaturregelung des Kühlwassers, auch in Abhängigkeit der Luftfeuchte und die hydraulische Trennung des sekundären Kühlwasserkreislaufes von der Kühlwasserversorgung des Gebäudes. Die CoolTrans kann modular, bis zu einer Leistung von 500 KW erweitert werden und dient zur Kühlwasserversorgung von Serverschränken in einem geschlossenen Kreislauf. Die Regelung der sekundären Kühlwassertemperatur erfolgt über ein 2- Wegeventil, welches im primären Kühlwasserkreislauf angeordnet ist. Die Anlage ist komplett verdrahtet und die Steuerung sowie der elektrische Anschluss erfolgen über einen in der CoolTrans montierten Schaltkasten. 1. 1.1 Sicherheit Arbeitssicherheits- Symbole Folgende Symbole weisen auf bestimmte Gefährdungen hin oder geben Ihnen Hinweise zum sicheren Betrieb. Achtung! Gefahrenstelle! Sicherheitshinweis! Gefahr durch elektrischen Strom oder hohe Spannung Vorsicht! Heiße Oberfläche Vorsicht! Drehende Teile Vor Arbeiten Freischalten! Achtung! Kennzeichnet mögliche Beschädigungen des Gerätes Gefahr durch elektrische Spannung CoolTrans 01.998.362.0 / Ausgabe f page / Seite42/80 CoolTrans Manual / Bedienungsanleitung Hinweis! Kennzeichnet mögliche Gefahren für die Umwelt Wichtiger Hinweis, Informationen 1.2. Sicherheitshinweis Zur Montage der CoolTrans können Sie unsere Ingenieure umfangreich beraten. Umfangreiche Material-, Funktions- und Qualitätsprüfungen sichern Ihnen einen hohen Nutzen und eine lange Lebensdauer. Trotzdem können von diesen Maschinen Gefahren ausgehen, wenn sie von unausgebildetem Personal unsachgemäß und nicht zum bestimmungsgemäßen Gebrauch eingesetzt werden. Lesen Sie vor Montage und Inbetriebnahme der CoolTrans diese Montage- und Betriebsanleitung aufmerksam durch. Die elektrische Ausrüstung entspricht den geltenden VDE- und Unfallverhütungsvorschriften. Lebensgefährliche Spannungen (größer 50V AC oder größer 100V DC) sind vorhanden: Hinter den Schaltschranktüren Verwenden Sie nur Originalsicherungen mit der vorgeschrieben Stromstärke. Schalten Sie das Gerät sofort ab, wenn die elektrische Energieversorgung oder Kaltwasserversorgung gestört sind. Gefahr durch elektrische Spannung Instandsetzungs-, und Reinigungsarbeiten darf nur Fachpersonal durchführen. Dabei muss das Personal sicherstellen, dass für den Zeitpunkt der Instandhaltung und Reinigung das Gerät spannungsfrei ist. Nehmen Sie deshalb vor Beginn der Arbeiten das Gerät vorschriftsmäßig außer Betrieb. CoolTrans 01.998.362.0 / Ausgabe f page / Seite43/80 CoolTrans Manual / Bedienungsanleitung Die Anlage ist unter Beachtung folgender Richtlinien und Vorschriften ausgeführt: 89/393/EWG Maschinenrichtlinie vom 1.01.1995 89/336/EWG Richtlinie über die elektromagnetische Verträglichkeit vom 1.01.1996 73/23/EWG Niederspannungsrichtlinie vom 2.01.1997 ENEV Energiesparverordnung DIN 1988 Technische Regeln für die Trinkwasserinstallation DIN 4747-1 Fernwärmeanlagen; Sicherheitstechnische Ausführung von Unterstationen, Hausstationen und Hausanlagen DIN- EN 292-1,2 Sicherheit von Maschinen, Grundsätze, allgemeine Gestaltungsleitsätze DIN- EN 50081-1,2 Elektromagnetische Verträglichkeit (EMV) Fachgrundnorm Störaussendung DIN- EN 6100-3-2;3 Elektromagnetische Verträglichkeit (EMV) Grenzwerte DIN- EN 60204-1 Sicherheit von Maschinen - Elektrische Ausrüstung von Maschinen Allgemeine Sicherheit DIN- EN 60335-1 Sicherheit elektrischer Geräte für den Hausgebrauch und ähnliche Zwecke Gefahr durch unsachgemäße Arbeiten am Gerät Die Reinigungen und Instandhaltungen darf nur Fachpersonal durchführen. Damit das Gerät betriebssicher bleibt und eine lange Lebensdauer hat, müssen Sie die Instandhaltung und Reinigungsintervalle unbedingt einhalten. Betreiben Sie die CoolTrans nur bestimmungsgemäß in angegebenen Leistungsgrenzen und mit genehmigten Betriebsmitteln. CoolTrans 01.998.362.0 / Ausgabe f page / Seite44/80 CoolTrans Manual / Bedienungsanleitung Beachten Sie bei allen Arbeiten an und mit dem Gerät: Die jeweils geltenden Vorschriften (z. B.VDE- Vorschriften oder andere gültige nationale Richtlinien) Die zutreffenden Unfallverhütungsvorschriften (BGV) Die einschlägigen Bestimmungen Die geltenden Umweltschutzgesetze Betreiben Sie das Gerät nur in einwandfreiem Zustand. Bei Funktionsstörungen oder Fehlern müssen Sie das Gerät sofort außer Betrieb setzen und den zuständigen Verantwortlichen des Betreibers über diesen Zustand informieren. Sie dürfen das Gerät erst wieder in Betrieb nehmen, nachdem die einwandfreie Funktion des Gerätes wiederhergestellt wurde. Vorsicht heiße Oberfläche Defekte Pumpen, Netzteile, Regelplatinen können heißgelaufen sein. Vor Beginn der Montage diese abkühlen lassen. Eigenmächtiger Umbau und Ersatzteilherstellung Umbau oder Veränderungen sind nur nach Absprache mit dem Hersteller zulässig Originalersatzteile und vom Hersteller autorisiertes Zubehör dienen der Sicherheit. Die Verwendung anderer Teile kann die Haftung des Herstellers der Kühlwasserkompaktstation für die daraus entstehenden Folgen aufheben Unzulässige Betriebsweise Die Betriebssicherheit der gelieferten Station ist nur bei bestimmungsgemäßer Verwendung gewährleistet. Die angegebenen Grenzwerte dürfen auf keinen Fall überschritten werden. Gewährleistung Ein Gewährleistungsanspruch setzt eine fachgerechte Montage und Inbetriebnahme nach der für das Gerät gültigen Montage-, Inbetriebnahme- und Bedienungsanleitung voraus. Die erforderlichen Montage-, Inbetriebnahme-, und Wartungsarbeiten dürfen nur von sachkundigen autorisierten Personen durchgeführt werden. CoolTrans 01.998.362.0 / Ausgabe f page / Seite45/80 CoolTrans Manual / Bedienungsanleitung 2. Einsatzbedingungen Bestimmungsgemäße Verwendung Das Gerät ist eine Wärmeübertragerstation zur Abfuhr der Wärme mit Kühlwasser aus wassergekühlten Serverschränken. Die CoolTrans dient zur Trennung des primären Kühlwassernetzes vom sekundären Kühlwassernetz. Die Pumpen im Netz wurden so ausgelegt, dass eine ausreichende Abfuhr der Wärme aus den Serverschränken gewährleistet ist. Für eine sichere Wärmeabfuhr ist die Verbindung (Rohrleitungsnetz) zwischen CoolTrans und den zu kühlenden Einrichtungen entsprechend den Regeln der Technik sowie den Leistungsdaten zu dimensionieren. Durch eine diffusionsdichte Isolierung ist die Aufstellung der CoolTrans selbst von der Raumluftfeuchte unabhängig. Die Aufstellung der CoolTrans muss frostfrei erfolgen. Der Fußboden muss die Last der CoolTrans tragen können (verteilt auf 4 Stellfüße- Punktlasten). Temperatur im Aufstellungsort: 5°C bis 35°C Absolute Feuchte im Aufstellungsort: beliebig Wassertemperaturen Vorlauf primär: 4°C - 8°C (andere Temperaturen nach Absprache) Wassertemperaturen Rücklauf primär: 11°C - 14°C (andere Temperaturen nach Absprache) Temperaturspreizung Wasser: 6K Verwendung von Frostschutzmittel im Kühlwasser: max. Betriebsdruck: Primärkreislauf bis 35% Sekundärkreislauf auf Anfrage Abblasedruck Sicherheitsventil Primär Sekundär Sekundär Wasseranschluss primär: Wasseranschluss sekundär von beiden Seiten der Unit möglich von beiden Seiten der Unit möglich Nennspannung: 3 x 400V / 16A 50 Hz bis 60 Hz CoolTrans 01.998.362.0 / Ausgabe f 16 bar 6 bar 2,5 bar page / Seite46/80 CoolTrans Manual / Bedienungsanleitung 2.1 Anforderungen an die Wasserqualität Zur sicheren Funktion der CoolTrans muss Kühlwasser in einer abgestimmten Wassermenge, Temperatur und Druck vorliegen. Wasserqualität gemäß VGB-R 455 P einhalten. Die Anforderungen an die primärseitige Wasserqualität stellen sich neben den im Anhang dargestellten Daten wie folgt dar: Um eine maximale Lebensdauer der Anlage sicherzustellen, muss das zugeführte Kühlwasser den VGB-Kühlwasser-Richtlinien (VGB-R 455 P) entsprechen. Das verwendete Kühlwasser muss weich genug sein, um Ablagerungen zu verhindern, darf aber auch nicht zu weich sein, da dies zur Korrosion der Anlage führen würde. Die folgende Tabelle enthält die wichtigsten Verunreinigungen sowie die Verfahren zu ihrer Beseitigung: Verschmutzung des Wassers Mechanische Verunreinigungen (dp > 0,8 mm) Übermäßige Härte Mäßiger Gehalt an mechanischen Verunreinigungen und Härtebildnern Mäßiger Gehalt an chemischen Verunreinigungen Biologische Verunreinigungen (Bakterien und Algen) Beseitigungsverfahren Filtern des Wassers Weichmachen des Wassers durch Ionenaustausch Beigabe von Dispergier- oder Stabilisierungsmitteln Beigabe von Passivierungsmitteln und Hemmstoffen Beigabe von Bioziden Es wird empfohlen, so weit wie möglich die folgenden hydrologischen Daten zu erreichen: Hydrologische Daten pH-Werte Freie Kohlensäure Nitrate Sulfate Sulfide Chloride (bei 25°C) Ammoniak Eisen Mangan Leitfähigkeit 6–9 < 20 < 100 < 50 nicht nachweisbar < 800 <2 < 1,5 < 0,5 < 30 Max. Konzentration Frostschutzmittel (Glykol) mg/l mg/l mg/l mg/l mg/l mg/l mg/l S/cm 35% )* Es wird generell der Einsatz eines Schmutzfängers mit Siebweite < 0,8mm im Primärvorlauf empfohlen, um eventuelle Störungen am Plattenwärmetauscher zu vermeiden. Zur unterbrechungsfreien Wartung empfehlen wir einen zweiten Schmutzfänger als Bypassstrecke. CoolTrans 01.998.362.0 / Ausgabe f page / Seite47/80 CoolTrans Manual / Bedienungsanleitung 3. Beschreibung Die CoolTrans ist modular aufgebaut und wird an den gebäudeseitigen Kühlwasserkreislauf angeschlossen (z.B. an den gebäudeseitigen Kühlwasserkreislauf der Klimaanlage). Der in der CoolTrans eingebaute Hochleistungswärmetauscher trennt den Kühlwasserkreislauf der Serverschränke vom gebäudeseitigen Kühlwasserkreislauf. Die sekundärseitige Kühlwasserregelung erfolgt durch ein 2-Wege Motorventil auf der Primärseite. Das Regelventil ist redundanter Notlauffunktion ausgerüstet, d. h. bei einem Defekt öffnet dies automatisch und es kann die gesamte Wärme aus dem sekundären Kreislauf abgeführt werden. Innerhalb der CoolTrans wird die Taupunkttemperatur überwacht. Die sekundärseitige Kühlwasservorlauftemperatur wird automatisch so weit angehoben, dass keine Kondensatbildung an den Serverschränken erfolgen kann. Dazu ist der mitgelieferte Feuchtesensor im Aufstellungsraum der Serverschränke zu montieren und mit der CoolTrans zu verbinden. 3.1 Automatische Taupunksteuerung Die CoolTrans ist mit einer automatischen Taupunksteuerung ausgerüstet. Dazu wird über ein mitgeliefertes Hygrostat die Raumluftfeuchte im Aufstellungsort der wassergekühlten Racks (CoolTherm / CoolAdd) ständig erfasst und ausgewertet. Über einen internen Rechner wird diese dann umgerechnet und einer Kühlwassertemperatur zugeordnet. Die CoolTrans ist so programmiert, das die Kühlwassertemperatur immer 1K über der Taupunkttemperatur liegt. 3.2 Abmessungen und Technische Daten Abbildung CoolTrans CoolTrans 100(3D)) 01.998.362.0 / Ausgabe f page / Seite48/80 CoolTrans Manual / Bedienungsanleitung Abbildung CoolTrans 100 (Standard) Ansicht von vorn Übersicht Technische Daten CoolTrans Baugrößen ArtikelNummer Leistung (kW) Höhe )* (mm) Breite )* (mm) Tiefe )* (mm) Gewicht (kg) Rohranschluss primär Druckverlust primär (bar) Förderhöhe sek. (bar) Elektrischer Anschluss (V, Hz, kW) sekundär 08.009.503.8 (Standard) 100 1840 1620 600 500 4 x DN 100 4 x DN 100 1,4 1,25 400 / 50 / 1,0 08.009.503.8. 000004 100 1840 1800 800 530 4 x DN 100 4 x DN 100 1,0 1,54 400 / 50 / 1,0 08.009.508.8 100 1840 1620 800 550 4 x DN 125 4 x DN 125 1,4 1,25 400 / 50 / 1,0 08.009.509.8 100 1840 2520 800 830 4 x DN 100 4 x DN 100 0,2 1,1 400 / 50 / 1,0 ArtikelNummer Leistung (kW) Kühlwassertemperatur primär (°C) Kühlwassertemperatur sekundär (°C) Wasservolumenstrom primär (bei 35% Glykol) (m³/h) Wasservolumenstrom sekundär (m³/h) zul. Betriebsdruck primär (bar) zul. Betriebsdruck sekundär (bar) 08.009.503.8 (Standard) 100 4 – 8 / 12 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)** 08.009.503.8. 000004 100 10 / 16 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)** 08.009.508.8 100 4 – 8 / 12 11 - 14 / 18 18,0 14,3 16 6 (SV 2,5)** 08.009.509.8 100 13 / 19 15 / 21 18,0 14,4 16 6 (SV 2,5)** *) Abmessungen mit Blechverkleidung **) Abblasdruck Sicherheitsventil CoolTrans 01.998.362.0 / Ausgabe f page / Seite49/80 CoolTrans Manual / Bedienungsanleitung Differenzdruck CoolTrans 100 KW, Wärmeübertrager WP7M-50 2,500 Differenzdruck [bar] 2,000 1,500 Förderhöhe extern sekundär [bar] Druckverlust primär [bar] 1,000 0,500 0,000 0 20 40 60 80 100 Leistung [KW] Abbildung: 4. Förderhöhe / Druckverlust in Abhängigkeit des Volumenstromes Lagerung, Transport und Aufstellung Lagerung und Transport der CTU Unit dürfen nur im vollständig entleerten Zustand erfolgen. (mögliche Schäden durch Frost) Die CoolTrans Unit wird werkseitig auf einer Holzpalette zum Transport vorbereitet. Nach dem Demontieren der Blenden kann der CTU Rahmen z.B. von einem Gabestapler unterfahren und von der Palette gehoben werden. Der Transport zum Aufstellungsort kann mittels Hubwagen oder Gabelstapler erfolgen. Die zulässigen Flächen und Punktlasten der Böden sind zu beachten. Beim Absetzen ist die CoolTrans mittels verstellbarer Füße waagerecht auszurichten. Geringfügige Höhentoleranzen zur Installation können ausgeglichen werden. (+/- 2,5 cm) CoolTrans 01.998.362.0 / Ausgabe f page / Seite50/80 CoolTrans Manual / Bedienungsanleitung 4 Stellfüße für waagerechte Ausrichtung Blende für Gabelunterfahrung demontiert Abbildung: 5. Transport mittels Hubwagen Inbetriebnahme der Anlage Nach dem Ausrichten sind die primären und sekundären Anschlussflansche mit dem Rohrsystemen zu verbinden. Nicht benötigte Abgänge sind durch Blindflansche zu verschließen und diffusionsdicht zu isolieren. Um einen bessere Zugang zu den linken Sekundärflanschen zu erreichen, kann der Schaltschrank abgenommen werden: 1.) Vier Befestigungsschrauben des Schaltschranks lösen Abbildung: CoolTrans Befestigungsschrauben Schaltschrank 01.998.362.0 / Ausgabe f page / Seite51/80 CoolTrans Manual / Bedienungsanleitung Abbildung: Lösen der Befestigungsschrauben mittels Steckschlüssel 2.) Absetzen des Schaltschrankes auf Auszugschienen Freier Zugang zu Flanschen Abbildung: CoolTrans Schaltschrank abgesetzt 01.998.362.0 / Ausgabe f Schaltschrank auf Auszugschienen page / Seite52/80 CoolTrans Manual / Bedienungsanleitung Abbildung: Flanschverbindung, hier Zwischenflansch für Anschluss einer weiteren CTU Hinweis: Direkt an den Flansch können Bögen angeschlossen werden, um unmittelbar in den Doppelboden zu gelangen. Einstellung des Vordruckes am Membranausdehnungsgefäß Dazu muss das Gefäß von Wasser entleert und ohne Gegendruck sein (Ablassschraube an Schnellkupplung offen). Ventilstutzen (Schrader) für Prüfung des Gaspolsters des Gefäßes Schnellkupplung zum Ausdehnungsgefäß Inbus für Absperrung (immer offen und plombieren) Entleerkugelhahn des Ausdehnungsgefäßes (Bedienung an Rückseite) Abbildung: Membranausdehnungsgefäß mit Schnellkupplung Faustregel: P vor = min 1 bar, sonst geodätische Höhe der Installation über dem Gefäß + 0,2 bar. Dichtheitsprüfung der gesamten Installation, ggf. abschnittsweise, mit Druckluft Achtung: Das Sicherheitsventil öffnet bei 2,5 bar, das Membranausdehnungsgefäß darf nur bis 3 bar belastet werden. Bei höheren Prüfdrücken das Sicherheitsventil mit einer Blindkappe und das Gefäß an der Schnellkupplung (Inbus) schließen, jedoch nach Druckprobe wieder entfernen bzw. öffnen und verplomben gegen unbefugtes Verschließen! CoolTrans 01.998.362.0 / Ausgabe f page / Seite53/80 CoolTrans Manual / Bedienungsanleitung Füllen der Anlage (Sekundärkreis) Dazu Medium (Wasser über Füllstutzen, Flansche etc.) einlassen und sorgfältig entlüften. Empfehlung statischer Fülldruck: Hinweis: min. 1,5 bar max. 2,0 bar Das Sicherheitsventil öffnet bei 2,5 bar. Beide Manometer müssen im Ruhezustand den gleichen Wert anzeigen. Thermometer / Manometer Sekundärkreis 2 Entlüftungshähne an höchster Stelle der Unit (hier nicht dargestellt) Sicherheitsventil Sekundärkreis mit Ablaufbogen Füll- und Entleerkugelhahn Sekundärkreis Elektrischer Anschluss entsprechend dem Kabelplan Hinweis: Vor dem Einschalten das Drehfeld der Pumpen prüfen CoolTrans 01.998.362.0 / Ausgabe f page / Seite54/80 CoolTrans Manual / Bedienungsanleitung Nach Erstfüllung Pumpen für ca. 1 Minute einschalten, um Luftblasen an Hochpunkte zu transportieren. Entlüften, ggf. Nachfüllen, Vorgang wiederholen, bis sich keine Luftblasen mehr im System befinden. Hinweis: Wie in allen Installationen mit dem Wärmeträger Wasser kann der Prozess des Ausgasens physikalisch bedingt einen längeren Zeitraum in Anspruch nehmen, d.h. regelmäßiges Entlüften und ggf. Nachfüllen ist mehrmals erforderlich und stellt keinen Mangel dar. Hinweis für Rohrinstallation außerhalb der CTU: Schaffung eines Hochpunktes zum zentralen Entlüften Beispiel: CoolTrans 01.998.362.0 / Ausgabe f page / Seite55/80 CoolTrans Manual / Bedienungsanleitung 5.1 Werkseinstellungen Mit folgenden für den Nutzer relevanten Einstellungen wir die CTU ausgeliefert: Pumpenumschaltung: montags 10:00Uhr Solltemperatur Sekundärvorlauf: 12°C (ohne Feuchteschiebung) Umschaltung Sommerzeit: 25.03. 2:00 Uhr Umschaltung Winterzeit: 25.10. 3:00 Uhr Vordruck Membranausdehnungsgefäß: 1,5 bar Ansprechdruck der beiden Minimaldruckbegrenzer, jeweils: 5.2 Voralaram Hauptalarm 0,5 bar 0,2 bar Montagebeispiele für hydraulischen Anschluss Es können bis zu 5 Stück CoolTrans Module, mit einer Gesamtleistung von 500 KW zusammen montiert werden. Der Anschluss erfolgt über die Flansche DN 100, PN 16. A) Reihenschaltung CoolTrans mit zwischen liegenden Verteilermodulen Bis max. 5 Stück CoolTrans mit dazwischen liegenden Verteilermodulen. CoolTrans kann wahlweise von der linken bzw. rechten Seite an das bauseitige Netz angeschlossen werden. Auch der redundante beidseitige Anschluss an zwei separate Kühlwasserkreisläufe ist möglich. CTU Verteiler CTU Verteiler CTU Verteiler CTU Verteiler Kühlwassersekundärnetz C TU Kühlwasserprimärnetz CoolTrans 01.998.362.0 / Ausgabe f page / Seite56/80 CoolTrans Manual / Bedienungsanleitung B) Reihenschaltung CoolTrans mit einer Gesamtverteilereinheit Bis max. 5 Stück CoolTrans mit angeschlossener optionaler Verteilereinheit. Die Verteilereinheit wird der gewünschten Anzahl der Kühlwasserkreisläufe angepasst. CTU CTU CTU CTU CTU Verteiler Kühlwassersekundärnetz Kühlwasserprimärnetz C) Einzelaufstellung oder Reihenschaltung mit einem nachfolgenden Tichelmannring Bis max. 5 Stück CoolTrans können verbunden werden. Auf einer bzw. auch auf zwei Seiten ist der Anschluss des sekundären und primären Kühlwasserkreislaufes möglich. Der nicht benötigte Anschluss kann mittels Blindflanschen verschlossen werden. Kühlwassersekundärnetz Kühlwasserprimärnetz CoolTrans 01.998.362.0 / Ausgabe f page / Seite57/80 CoolTrans Manual / Bedienungsanleitung D) Einzelaufstellung oder Reihenschaltung mit nachfolgendem Versorgungsring Bis max. 5 Stück CoolTrans können verbunden werden. Auf zwei Seiten ist der Anschluss des sekundären und primären Kühlwasserkreislaufes möglich. Durch die beiderseitigen Einspeisung in den Ring wird eine Redundanz n+1 erreicht. Kühlwassersekundärnetz Kühlwasserprimärnetz 6. Steuerung Die Steuerung besteht aus einem Universalregler und einem Feuchterechner, welcher automatisch die gemessene Raumluftfeuchte auswertet und bei Gefahr von Kondensatbildung die Kühlwassertemperatur anhebt. 6.1 Universalregler 6.1.1 Allgemeine Reglerinformationen 1 Anzeigefeld 2 INFO Taste Wichtige Anlagendaten abrufen Erläuterungen zu den einzelnen Datenpunkten 3 Drehduckknopf (OK) Drehen: Drücken: 4 Rücktaste (ESC) CoolTrans Menüzeile anwählen bzw. Wert verstellen Menüzeile bzw. Wert bestätigen Ins vorherige Menü zurückspringen 01.998.362.0 / Ausgabe f page / Seite58/80 CoolTrans Manual / Bedienungsanleitung Am Universalregler - Bediengerät werden alle für das Bedienen des Reglers erforderlichen Handlungen, wie Einstellen und Ablesen vorgenommen. Alle Eingaben am Bediengerät werden in den Regler übertragen, in diesem verarbeitet und gespeichert. Navigation im Menü Im unbedienten Zustand erscheint im Anzeigefeld immer die Startseite. Hauptmenü 1. Drücken Sie den Drehknopf „OK“. Die Menüleiste erscheint. 2. Drehen Sie den Drehknopf „OK“. Der Cursor springt von einer Zeile zur anderen. 3. Die angewählte Zeile erscheint mit schwarzem Hintergrund und einem invers dargestellten Text. 4. Wählen Sie die gewünschte Zeile an. 5. Bestätigen Sie diese durch Drücken des Drehknopfes „OK“. 6. Sie befinden sich jetzt im Untermenü. 7. Die drei Punkte (...) nach dem Text bedeuten, dass weitere Untermenüs folgen 8. Folgen Sie dem angegebenen Pfad, indem Sie den Drehknopf „OK“ drehen, um die Zeile zu finden bzw. drücken um die Zeile zu bestätigen. 9. Am Ende des Pfades gelangen Sie zum einstellbaren Wert. 10 Werte mit Drehknopf „OK“ bestätigen. Mit der Taste (ESC) gelangen Sie jeweils zurück zum vorherigen Eingabefeld oder Menüpunkt. Wenn Sie die (ESC) mehrere Male drücken, gelangen Sie zurück auf die Startseite. Für jeden Parameter (Bedienseite) ist ein Zugriffsrecht definiert. Es gibt drei Zugriffsebenen: Ebene Zugang Benutzerebene (für den Anlagenbetreiber) Serviceebene (für Wartungsaufgaben) Die Benutzerebene ist immer zugänglich. Alle hier sichtbaren veränderten Datenpunkte können durch den Benutzer verstellt werden. Drehdruckknopf „OK“ und Rücktaste „ESC“ gleichzeitig drücken, dann Bedienzeile „Serviceebene wählen und durch Drücken des Drehdruckknopfes die Wahl bestätigen. Drehdruckknopf „OK“ und Rücktaste „ESC“ gleichzeitig drücken, dann Bedienzeile „Passwortebene“ wählen und durch Drücken des Drehdruckknopfes die Wahl bestätigen; anschließend das Passwort eingeben (nur Fachfirma eingabeberechtigt) und durch Drücken des Drehdruckknopfes bestätigen. Passwortebene (für die Inbetriebnahmen) CoolTrans 01.998.362.0 / Ausgabe f Symbol page / Seite59/80 CoolTrans Manual / Bedienungsanleitung 6.1.2 Reglereinstellungen Bei der Erstinbetriebnahme meldet sich der Regler mit einer Störmeldung. Um diese zu beseitigen, müssen die Zeit und das Datum eingestellt werden. Einstellung Zeit / Datum Hauptmenü > Zeit / Datum Bedienzeile Bereich Werkeinstellung Zeit 00:00 .... 24:00 00:00 Datum 01.01 .... 31.12 [Tag/Monat] 01.01 Jahr 2000 ... 2080 2000 Die Umstellung von Sommerzeit auf Winterzeit erfolgt automatisch. (Zeitpunkt siehe Werkseinstellungen) Wahl der Sprache In jedem Gerätetyp sind mehrere Sprachen geladen. Beim erstmaligen Einschalten der CoolTrans startet dieses in deutscher Sprache. Die Sprache kann auch während des Betriebs umgeschaltet werden. Einstellung Sprache Hauptmenü > Einstellung > Gerät > Bedienzeile Bereich Werkeinstellung Sprache de Deutsch Einstellung Vorlauftemperatur Hauptmenü > Einstellungen > Regler1 > Sollwerte Bedienzeile Bereich Werkeinstellung Pre´ komf Soll oben 12°C Komf Soll oben 12°C Komf Soll unten 12°C Pre´ komf Soll unten 12°C CoolTrans 01.998.362.0 / Ausgabe f page / Seite60/80 CoolTrans Manual / Bedienungsanleitung „Pre` komf Soll oben“ und „Pre` komf Soll unten“ zuerst auf gewünschte Kühlwasservorlauftemperatur einstellen, anschließend „Komf Soll oben“ und „Komf Soll unten“ auf gewünschte Temperatur einstellen. Alle vier Werte müssen gleich sein. Ablesen der Betriebsstunden Die Laufzeit der Pumpen lässt sich aus dem Regler auslesen. Hauptmenü > Einstellungen > Datenerfassung > Betriebsstunden > Betriebsstunden 1... 2 Bedienzeile Bereich Betriebsstunden * Anzeige 0 ... 99 999 h Betriebsstunden seit Wartung Anzeige 0 ... 99 999 h Zurücksetzen ** Nein, Ja Werkeinstellung Nein * Anzeige der aufgelaufenen Betriebsstunden. Der Zähler zählt 99 999 Stunden, danach beginnt er wieder bei 0 ** Dieser Datenpunkt setzt den Datenpunkt „Betriebsstunden seit Wartung“ auf 0 Stunden zurück 6.1.3 Reglerinformationen Wenn Sie während des automatischen Betriebs den momentanen Zustand wissen wollen, so gehen Sie auf die Infoebene. 1. Zurück zur Startseite mit der Taste „ESC“ 2. Taste „INFO“ drücken Durch mehrmaliges Drücken der „INFO“ Taste gelangen Sie zu den einzelnen Infoseiten. Sie können z. B. folgende Daten abfragen: Raumbetriebsart (Vorgabe, Zustand, Grund) Schaltuhr Kühlwasser-Istwert und momentan wirkender Sollwert Raumfeuchte 6.1.4 Störmeldungen Legende 1. LED „Run“ zur Anzeige des Gerätebetriebszustandes; dabei bedeuten: LED leuchtet: Speisespannung vorhanden; keine Fehler in Anwendung und Peripherie LED aus: Keine Speisespannung vorhanden CoolTrans 01.998.362.0 / Ausgabe f page / Seite61/80 CoolTrans Manual / Bedienungsanleitung 2. Taster mit LED (rot) zur Anzeige einer Störmeldung und ihrer Quittierung; dabei bedeuten: LED blinkt: Störungsmeldung bereit zum Quittieren LED leuchtet: Störungsmeldung noch anstehend, aber noch nicht entriegelt LED aus: Keine Störungsmeldung vorhanden Taster drücken: Störung quittieren bzw. entriegeln LED blinkt 1. Drücken Sie die Taste , um die Störung quittieren. 2. Leuchtet die LED nach wie vor, ist die Störung nicht behoben oder sie muss durch nochmaliges Drücken der Taste entriegelt werden. LED leuchtet 1. Beheben Sie die Störung. 2. Leuchtet die LED nach wie vor, kann die Störung durch Drücken der Taste entriegelt werden. Das Entriegeln einer Störung ist nur möglich, wenn deren Ursache behoben worden ist. Im Reglermenü „Störungen“ können Sie erkennen, welche Störung zur Zeit ansteht. Gezeigt wird von jeder Störung: - der Verursacher, z. B. Pumpe, Reglerventil - die Störungsnummer - das Datum und die Uhrzeit des Auftretens Hauptmenü > Störungen > > CoolTrans Störung aktuell zeigt an, welche Störung z. Zeit ansteht Störungshistorie zeigt die letzten 10 Störungen einzeln an 01.998.362.0 / Ausgabe f page / Seite62/80 CoolTrans Manual / Bedienungsanleitung Fehlercode- Liste Code Nr. + Text Fehler / Störungsursache Fehlerbeseitigung 3011 Reglerstörung Fühlerfehler / Kabelbruch, Fühler nicht angeschlossen Überprüfen Fühler für Vorlauftemperatur Pumpenstörung Pumpe 1 / Motor 1 A Überlast Pumpe kontrollieren, tauschen Überlastmotorschutzschalter Pumpenstörung Pumpe 2 / Motor 1 B Überlast Pumpe kontrollieren, tauschen Überlastmotorschutzschalter Druck in der Anlage unter 0,5 bar Kühlwasseranlage auf Leckage prüfen. Kühlwasser nachfüllenl Systemzeitausfall Datum / Zeit einstellen Regelventil länger als 30 min in Stellung 100% Soll-/Istwertvergleich Primärtemperaturen überprüfen 1314 KKP1 Fehler 1315 KKP1 Fehler 9003 Warnung P min 5001 9002 Regelabweichung CoolTrans 01.998.362.0 / Ausgabe f page / Seite63/80 CoolTrans Manual / Bedienungsanleitung 6.1.5 Störungsquittierung Am Regler kann die Serviceebene über die Bedienzeile „Störungen löschen“ die Liste „Störungshistorie“ gelöscht werden. Hauptmenü > Störungen > Bedienzeile Bemerkung Störungen löschen Alle aktuellen Störungen werden intern entriegelt, die Liste „Störungshistorie“ wird gelöscht. Bei Aktivieren dieser Funktion werden gleichzeitig alle anderen Störungsmeldungen auch entriegelt. Es bleiben nur noch die noch anstehenden Störungen in der Anzeige. Sammelstörmeldung Störmeldung p min Die Störmeldung ist durch drücken des Schalters zu entriegeln. CoolTrans 01.998.362.0 / Ausgabe f page / Seite64/80 CoolTrans Manual / Bedienungsanleitung 6.1.6 Behebung von Fehlern Frage Antwort Bei der Inbetriebnahme wurde die falsche Sprache eingestellt. Wie finde ich meine Sprache? 1. Drücken Sie die Taste „ESC“ und „OK“ gleichzeitig. 2. Wählen Sie die Passwortebene und geben Sie die Zahl 112 als Passwort ein und betätigen Sie dies mit der Taste „OK“. Es folgt der Wechsel auf die englische Sprache. 3. Wechseln Sie im Menü „Settings > Device > Language“ zu Ihrer Sprache. Die Störungsmeldung 101 „Fühlerfehler lässt sich nicht quittieren. Passwortebene (nur Servicepersonal) Wenn das Menü „Inbetriebnahme“ verlassen wird, wird überprüft, welche Fühler angeschlossen sind. Fehlt später einer der zu diesem Zeitpunkt angeschlossenen Fühler, wird eine Fehlermeldung generiert. Wurde ein Fühler falsch verdrahtet und wird erst später im Betrieb umverdrahtet, kann so eine „falsche“ Fehlermeldung generiert werden Behebung: Gehen Sie ins Menü „Inbetriebnahme“ (Achtung! Anlage stoppt), dann zurück ins Hauptmenü (Achtung! Anlage startet). 6.1.7 Störungsmeldungen und Weiterleitung Als potenzialfreie Wechselkontakte zur Störungsmeldung stehen zur Verfügung: - Störmeldung P-min (zur Erkennung von Wasserverlusten in der Kühlwasseranlage) - Störmeldung Regler - Störmeldung Pumpe 1 - Störmeldung Pumpe 2 - Sammelstörmeldung Bei Anschluss an eine zentrale Leittechnik besteht die Möglichkeit die Störmeldungen als Binärsignal an eine SICLIMATX zu übergeben. CoolTrans 01.998.362.0 / Ausgabe f page / Seite65/80 CoolTrans Manual / Bedienungsanleitung 6.2 Feuchterechner Abbildung: Feuchterechner Mit Hilfe eines Hygrostates, welches lose der CoolTrans beigelegt ist, wird die die Raumluftfeuchte im Aufstellungsort ermittelt. Dazu ist eine Verbindungsleitung vom Feuchterechner mit min. 5 Adern zu verlegen. Empfohlener Kabeltyp: JY(St) Y 4x2x0,8 Das Hygrostat nicht in Nischen und hinter Vorhängen montieren. Direkte Sonneneinstrahlung vermeiden. Das Hygrostat ist am Aufstellort der CoolTherms bzw. anderer HDCS Produkte, dort am kühlsten Punkt, z.B. im Doppelboden vorzunehmen Die Montageanleitung ist auf der Geräteverpackung aufgedruckt. Hygrostat Abmessung: 100 x 90 x 32 mm Abbildung: Hygrostat CoolTrans 01.998.362.0 / Ausgabe f page / Seite66/80 CoolTrans Manual / Bedienungsanleitung Grundlage der Kühlwassertemperaturanhebung im Sekundärnetz bildet das hinterlegte HX-Diagramm mit der Taupunkttemperatur. Vorlauftemperatur Kühlwasser [°C] in Abhängigkeit der absoluten Luftfeuchte 24 22 Vorlauftemperatur [°C] 20 18 Vorlauftemperatur Kühlwasser [°C] 16 14 12 10 8 10 12 14 16 18 20 absolute Feuchte [g/kg Luft] Abbildung: Anhebung der Vorlauftemperatur in Abhängigkeit der gemessenen Feuchte Funktion Wasserfühler in Wanne Alarm- Reset Taste Sensor mit Kabel (Sensor in Wanne) An das Grundgerät können bis zu 3 Wasserfühler angeschlossen werden. Die Ausstattung mit einem Sensorkabel ist Standard, zwei weitere Sensorkabel können optional angeschlossen werden. Durch den eingebauten potenzialfreien Relaiskontakt wird ein Alarm ausgelöst. Zur Alarmierung ist ein Signalgeber eingebaut. Über die drei LED kann die jeweils ausgelöste Schleife ermittelt werden. Mit dem Drücken der Reset Taste wird der Alarm gelöscht. Der Leckwassermelder gibt bei einer Wasserfilmhöhe von 0,5 mm in der Wanne Alarm aus. CoolTrans 01.998.362.0 / Ausgabe f page / Seite67/80 CoolTrans Manual / Bedienungsanleitung 7. 7.1 Wartungstätigkeiten Wartungsintervalle Der Betreiber ist dafür verantwortlich, dass die nachfolgenden beschriebenen Wartungs- und Austauschmaßnahmen durchgeführt und die dafür vorgesehenen Zeitintervalle eingehalten werden. Die Firma Knürr empfiehlt folgende Wechselintervalle: - Austausch der Pumpengruppe nach 2 Jahren Betriebszeit bei hochverfügbaren Anforderungen - Austausch des Ventilantriebes nach 2 Jahren Betriebszeit bei hochverfügbaren Anforderungen Die Firma Knürr empfiehlt folgende Prüfintervalle: - jährliches Prüfen des Vordruckes am Ausdehnungsgefäß, eventuell Stickstoff nachfüllen - jährlich Rückschlagklappe auf Funktion prüfen - jährlich Regelventil auf Funktion prüfen . jährlich Sicherheitsventil auf Funktion prüfen - jährlich Temperaturwächter / Druckwächter auf Funktion prüfen - jährliches Prüfen der Filtersiebe auf der Sekundärseite, Sieb auf Beschädigung prüfen, Sieb reinigen - jährlich Stopfbuchse der Pumpen auf Dichtigkeit prüfen Schmutzfänger Mindestens jährlich auf Verunreinigungen prüfen und ggf. Filtersieb reinigen. Im Sekundärkreis ist saugseitig vor den Pumpen jeweils ein Schmutzfänger installiert. Abbildung: Schmutzfänger - regelmäßig sekundärseitigen Druck prüfen und ggf. Kühlwasser nachfüllen - regelmäßig die Sicherheitsbaugruppe auf Undichtigkeit prüfen - regelmäßig auf Beschädigungen, Korrosion, Dichtheit prüfen - regelmäßig Isolierung auf Beschädigung und Vollständigkeit prüfen - regelmäßig Temperatur und Druckmessgeräte auf Beschädigung prüfen - regelmäßig Lager der Pumpe auf Geräusch prüfen Schaltschrank - regelmäßig prüfen der optischen und akustischen Kontrolleinrichtung im Schaltschrank - regelmäßig Schütze und Relais auf Verschleiß und Beschädigung prüfen - jährlich Schalt- und Steuervorgänge prüfen - jährlich Notstellfunktion prüfen - jährlich Stellungs-/ Grenzwertgeber auf Funktion prüfen - jährlich Regelkreis gemäß Einstellwerte prüfen CoolTrans 01.998.362.0 / Ausgabe f page / Seite68/80 CoolTrans Manual / Bedienungsanleitung 7.2 Sicherheitsbaugruppe Ausdehnungsgefäß (AG) Der Vordruck im Ausdehnungsgefäß ist regelmäßig zu kontrollieren. Ist das Ausdehnungsgefäß undicht oder defekt muss es ausgetauscht werden. Füllventil Vordruck AG (pV = pstat) Sicherheitsventil Ausdehungsgefäß Abbildung: Sicherheitsbaugruppe Abbildung: Schnitt Membranausdehnungsgefäß CoolTrans 01.998.362.0 / Ausgabe f page / Seite69/80 CoolTrans Manual / Bedienungsanleitung Sicherheitsventil Sicherheitsventil Der Arbeitsdruck des sekundären Kühlwassernetzes soll mindestens 5% unter dem Schließdruck des Sicherheitsventils (2,5 bar) liegen. Durch Anlüften soll das Ventil einmal jährlich auf Funktion geprüft werden. Vor Demontage ist darauf zu achten, dass das Sicherheitsventil nicht mit Druck beaufschlagt ist. Kappenventil Bei der jährlichen Wartung ist die Überprüfung des Vordruckes im Ausdehnungsgefäß notwendig. Dazu ist der wasserseitige Anschluss des Ausdehnungsgefäßes zu entleeren. Dazu die Plombierung am Kappenventil entfernen, die Kappe abnehmen und das Ventil mittels Inbusschlüssel durch Herunterdrehen schließen. Das Membranausdehnungsgefäß ist damit von der Kühlwasseranlage getrennt. Anschließend das Entleerungsventil öffnen. Dann den Vordruck mit einem Messgerät prüfen, mit dem auf dem Typenschild angegebenen Druck vergleichen und eventuell mit Stickstoff nachfüllen. Nach der Druckprüfung das Kappenventil langsam öffnen. Sobald Wasser aus dem Entleerungsventil austritt dieses wieder schließen. Die Kappe muss danach aufgesteckt und neu plombiert werden. 8. Kundendienst, Herstelleradressen Alle Knürr Produkte unterliegen einer ständigen Qualitätskontrolle und entsprechen den geltenden Vorschriften. Für alle Fragen, die Sie im Zusammenhang mit unseren Produkten haben, wenden Sie sich bitte an die Ersteller Ihrer Anlage oder direkt an: Knürr AG Raubaer Straße 1 01623 Lommatzsch Tel.: +49 (0) 800 000 6295 E-Mail: [email protected] CoolTrans 01.998.362.0 / Ausgabe f page / Seite70/80 CoolTrans Manual / Bedienungsanleitung 9. 9.2 Anlagen Hydraulischer Schaltplan Nr.: Bezeichnung 2 5 6 24 27 31 34 40 42 43 48 57 58 59 64 68 72 75 79 86 88 96 Absperrklappe Anschluss Ausdehnungsgefäß Feuchtefühler (am Aufstellungsort CoolTherm / CoolAdd) Regelventil (primäre Mengenregelung), fail safe Entlüftung Füll- und Entleerungshahn Kappenventil Kugelhahn Manometer Membranausdehnungsgefäß Plattenwärmetauscher Rückschlagventil Regelung / Schaltschrank Schmutzfänger Sicherheitsdruckbegrenzer (min) Sicherheitsventil Stellantrieb (stromlos offen) Temperaturfühler Thermometer Umwälzpumpe (redundant) Kolbenventil Passstück für nachträglichen Einbau eines Kältezählers CoolTrans 01.998.362.0 / Ausgabe f page / Seite71/80 CoolTrans Manual / Bedienungsanleitung 9.2 Elektroschaltplan (ggf. beigelegte Variante beachten) CoolTrans 01.998.362.0 / Ausgabe f page / Seite72/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite73/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite74/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite75/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite76/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite77/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite78/80 CoolTrans Manual / Bedienungsanleitung CoolTrans 01.998.362.0 / Ausgabe f page / Seite79/80 CoolTrans Manual / Bedienungsanleitung 9.3 Stückliste mit Wartungs- bzw. Ersatzteilen Pos. Bezeichnung Typ / Fabrikat 2 Durchgangsventil Primärkreis Samson 322k DN 50 (10/4“AG) PN 25 kvs 25 150°C RG 2 Stellantrieb 3 Rohrfedermanometer Samson 5825-25 STR II IP 54 24 VAC 0-10V/4-20 Stellzeit: 70s Hub: 12mm Manotherm 0..16 bar DM:100mm ½” Anschl. Unten 140°C GK 1,0 4 Rohrfedermanometer Manotherm 0..6 bar DM:100mm ½” Anschl. unten 140°C GK 1,0 5 Maschinenthermometer Sika -30 .. 50°C Typ 174 B 110x30 gerade L=63mm ½“ MS 6 Plattenwärmetauscher WTT WP 7-50 M DN 50 (FL) PN 30 ohne Konsolen 7 Plattenwärmetauscher WTT WP 7-150 M DN 50 (FL) PN 30 ohne Konsolen 8 Sicherheitsventil Götze 851 BF ½“ x 1“ IG 2,5 bar Rg / EPDM Kennbuchstube F 9 Druckwächter (min) Sauter DSB 138 F001 DN15 (1/2“ AG) PN 12 70°C 0..1,6bar TÜV 10 Ausdehnungsgefäß Reflex F24 DN 20 (3/4“ AG) PN 3 Vordruck 1,5 bar 11 Schmutzfänger Barberi DN 50 (2“ IG) PN 16 110°C Ms 12 Blockpumpe Wilo BAC 40/128-1,5/2-s DN 40 (6/4“) x DN 50 (2“) PN 6 400VAC -15..60°C 13 Rückschlagventil Rittag SR 70.16 DN 50 PN 16 120°C Messing Zwischenflansch 14 Einschraubfühler Ni1000TK5000, SFK 01 -50 +160°C austauschbar 150 x 8 x 1 mm CoolTrans 01.998.362.0 / Ausgabe f page / Seite80/80