Test Procedure for the NCP1034BCK5VG Evaluation Board
Figure 1: Test Setup
The following steps describe the test procedure for all these boards:
Required Equipment:
Current limited DC Power Supply (e.g. AGILENT 6645A) ……………………… 1pc
DC Volt-Meter able to measure up to 60 V DC (e.g. KEITHLEY 2000) ………… 2pcs
DC Amp-Meter able to measure up to 1 A DC (e.g. KEITHLEY 2000) ………......1pc
DC Amp-Meter able to measure up to 5 A DC (e.g. FLUKE 89 IV)……………… 1pc
DC Electronic Load (e.g. AGILENT 6060B) ……………………………………... 1pc
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, VIN = 48 Vdc
3. Apply IOUT(load) = 0 A
4. Check that VOUT = 5 Vdc
5. Set IOUT to 5 A
6. Check that VOUT = 5 Vdc
7. Turn off the load
8. Turn off VIN
9. End of the test