No.:T1091 Revision:A RELIABILITY TEST REPORT TEST REPORT Company :RAIO TECHNOLOGY INC. Model Name :RA0086L3N Date Received :2009.07.24 Date Tested :2009.07.28 TESTING LABORATORY IS ACCREDITED BY: IEC/IECQ 17025 certificate of independent test laboratory approval Certificate No.:T1091 ISO 9001 certificate is approved by TUV CERT certification body of TUV NORD Cert GmbH WE HEREBY CERTIFY THAT: The test(s) shown in the attachment were conducted according to the indicating procedures. We assume full responsibility for the accuracy and completeness of these tests and vouch for the qualifications of all personnel performing them. Name Signature Date Test Engineer Jay Fang 2009/07/24 Section Manager Even Lin 2009/07/28 Note: 1. This report will be invalid if reproduced in whole or in part. 2. This report refers only to the specimen(s) submitted to test, and is invalid if used separately. 3. This report is ONLY valid with the examination seal and signature of this institute. 4. The tested specimen(s) will only be preserved for thirty days from the date issued, if not collected by the applicant. Integrated Service Technology Inc. Reliability Engineering Division No.:T1091 Revision:A 1F, No.19, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. Tel: 886-3-578-2266, Fax: 886-3-5634868 Report No.:HS0907240038A http://www.istgroup.com Report No.:RAC9802419-E Page RELIABILITY TEST REPORT Applicant/Department: RAIO TECHNOLOGY INC. Product : RA0086L3N Testing Item : LATCH-UP Test Condition : JEDEC STANDARD NO.78 MARCH 1997 Package/Pin Count : LQFP-100 < 25mA 10mA + I normal Failure Criteria > 25mA 1.4 x I normal Trigger Current : 50mA ~300mA (±), Step: 50mA (±) Vsupply OVER VOLTAGE TEST : 5V~8V(+) , Step: 0.5V(+) 1 of 5 Integrated Service Technology Inc. Reliability Engineering Division No.:T1091 Revision:A 1F, No.19, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. Tel: 886-3-578-2266, Fax: 886-3-5634868 Report No.:HS0907240038A http://www.istgroup.com Report No.:RAC9802419-E Page 2 LATCH-UP Testing Report Test Equipment: KEYTEK ZAPMASTER #2-6447 Environmental Condition of Laboratory: Temperature: 25ºC±5ºC Humidity: 55%±10% RH Test Condition: POSITIVE I NEGATIVE I Vsupply OVER VOLTAGE TEST Test Result: TRIGGER MODEL TEST PIN SAMPLE SIZE I/O +IT -IT I/P PASS 3 PASS O/P PASS I/O PASS I/P 3 O/P Vsupply OVER VOLTAGE TEST TRIGGER SOURCE INDUCE LATCH-UP VCC ALL:1-54,56-58,60-62,64,66-100 I/O:54,66-69,73 I/P:56-58,60-62,64,70-72 PASS PASS 3 PASS O/P:1-53,74-100 VCC:59,63 VSS:55,65 IT CLASS: 3 NOTE: CLASS1: +IT:0mA~39mA -IT:0mA~ -39mA CLASS2: +IT: 40mA~+99mA -IT: -40mA~-99mA CLASS3: +IT:≧100mA -IT:≦-100mA of 5 Integrated Service Technology Inc. Reliability Engineering Division No.:T1091 Revision:A 1F, No.19, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. Tel: 886-3-578-2266, Fax: 886-3-5634868 Report No.:HS0907240038A http://www.istgroup.com Report No.:RAC9802419-E Page POSITIVE I Test TRIGGER Pin CURRENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 #1 #2 #3 PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Test TRIGGER Pin CURRENT 49 50 51 52 53 54 56 57 58 60 61 62 64 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 3 of 5 (UNIT::mA) #1 #2 #3 PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Integrated Service Technology Inc. Reliability Engineering Division No.:T1091 Revision:A 1F, No.19, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. Tel: 886-3-578-2266, Fax: 886-3-5634868 Report No.:HS0907240038A http://www.istgroup.com Report No.:RAC9802419-E Page NEGATIVE I Test TRIGGER Pin CURRENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 #1 #2 #3 PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Test TRIGGER Pin CURRENT 49 50 51 52 53 54 56 57 58 60 61 62 64 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 4 of 5 (UNIT::mA) #1 #2 #3 PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS Integrated Service Technology Inc. Reliability Engineering Division No.:T1091 Revision:A 1F, No.19, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. Tel: 886-3-578-2266, Fax: 886-3-5634868 Report No.:HS0907240038A http://www.istgroup.com Report No.:RAC9802419-E Page Vsupply OVERVOLTAGE TEST Test pin TRIGGER VOLTAGE 59 63 5 (UNIT: V) #1 #2 #3 PASS PASS PASS PASS PASS PASS of 5