Appendix D: Screening Guides HRP 102: Finished Bridge Rectifier Assemblies The following screening for bridge assemblies is a guide for a suggested procedure. It can be modified or adjusted to suit requirements. This is taken from MIL-PRF-19500 Table IV, JANTX screening. 1) High Temperature Life (non-operating life/ stabilization bake MIL-STD-750) Method 1032 24 hrs @ 125°C 2) Temperature Cycling MIL-STD-202 Method 107 Condition C 10 Cycles -55°C to +125°C 15 min. extremes 3) Interim Electrical 4) High Temperature Reverse Bias (HTRB) Forward Voltage Drop Leakage Current Method 1038 Condition A 24 hrs @ +125°C at 80% of VRWM MIL-STD-750 5) Final Electrical MIL-STD-750 Method 4011 Method 4016 Method 4021 Forward Voltage Drop Leakage Current Breakdown Voltage 6) Visual Mechanical Per Specification Per Specification Inspection 295