Large Scale Steam Turbines, in English (2.4 MB)

Large scale Steam Turbines for CCPP and SPP business
Overview SST
Unrestricted © Siemens AG 2013 All rights reserved.
siemens.com/answers
Siemens large-scale steam turbines
NPP
SST-9000 series
1,900 MW
SST-6000 series
1,200 MW
SPP
SST-5000 series
750 MW
SST-5000 series
CCPP
SST-4000 series
500 MW
380 MW
SST-3000 series 250 MW
Unrestricted © Siemens AG 2013 All rights reserved.
Page 2
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
Product Portfolio
Steam Turbine Series
SST-3000 series
for Combined Cycle Power Plants
single-flow LP
axial exhaust
CCPP
90 - 250 MW
SST-4000 series
for Combined Cycle Power Plants
CCPP
SST-5000 series
for subcritical SPP and CCPP
SPP
max. 177bar
565°C / 565°C
CCPP
SST-6000 series
for Steam Power Plants
max. 80bar
two-flow LP
with down, double-side or single- 540°C
side exhaust
100 - 380 MW
max. 177bar
two or four-flow LP
with down, double-side or single- 600°C / 600°C
side exhaust
150 - 750 MW
two, four or six-flow LP
with down exhaust
SPP
max. 280bar
600°C / 610°C
300 - 1200 MW
SST-9000 series
for Conventional Islands
with shrunk-on disc
rotor design
CI
max. 80bar
300°C
1500 rpm
1000 - 1900 MW
90 – 1900 MW (50 Hz and 60 Hz)
Unrestricted © Siemens AG 2013 All rights reserved.
Page 3
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
Product Portfolio
Modular concept of Standard types
 Five basic turbine elements
 Three product lines for
different power ranges
 Common design features,
e.g. blading, seal
configurations
 Common design elements,
e.g. valves, bearings, auxiliary
skids
SST-3000
series
Modular concept
SST-6000 series
HP turbine
H
Combined
IP/LP
turbine
IL
IP turbine
Combined
HP/IP
turbine
LP turbine
L
HI
SST-5000
series
I
SST-4000 series
Unrestricted © Siemens AG 2013 All rights reserved.
Page 4
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
Modular design concept for large variation of back pressure
SST-3000 series
- Compact and fully pre-assembled
- CCPP applications
- Available for 50Hz and 60Hz applications
Unrestricted © Siemens AG 2013 All rights reserved.
siemens.com/answers
SST-3000 series
Features & Technologies
Combined stop and
control valve in single
valve arrangement
Barrel-type HP
casing
Fully 3-dimensional high
performance variable reaction
blading (3DVTM)
Combined
journal-thrust
bearing
Compact
combined IP/LP
section
Single flow LP with
axial exhaust for a
range of different
exhaust areas
Highperformance
LP blading
Unrestricted © Siemens AG 2013 All rights reserved.
Page 6
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
SST-3000 series
References
Project:
Ribatejo
Country:
Portugal
Plant type:
CCPP 1S
Conf.:
H30 + IL30-1x12.5
Power:
142 MW
Frequency:
50 Hz
Number of units:
3
Com. operation:
2004/5
Project:
Santa Rita
Country:
Philippines
Plant type:
CCPP 1S
Conf.:
H30 + IL30-1x6.9
Power:
92 MW
Frequency:
60 Hz
Number of units:
4
Com. operation:
2000
Project:
BASF Antwerpen
Country:
Belgium
Plant type:
CCPP 1S
Conf.:
H30 + IL30-1x10.0
Power:
140 MW
Frequency:
50 Hz
Number of units:
1
Com. operation:
2005
83 turbines1) with a total power output of 11 GW in operation or commissioning
1) Only
Siemens factory fleet
Unrestricted © Siemens AG 2013 All rights reserved.
Page 7
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
High robustness at low invest
SST-4000 series
- Low CAPEX solution
- Applicable to various plant configuration
- Available for 50Hz and 60Hz applications
Unrestricted © Siemens AG 2013 All rights reserved.
siemens.com/answers
SST-4000 series
Features and Technology
Compact HP turbine
Single cross-over pipe
Fabricated inner
casing design and
efficient erosion
protection measures
Fully 3-dimensional
high performance
variable reaction
blading (3DVTM)
High-performance LP
blading for different
sizes of exhaust area
Combined stop and
control valve
Push rod arrangement
for reduced axial
clearances
Optimized for two-pressure combined cycle applications
Max. 540°C / Max. 80 bar
Unrestricted © Siemens AG 2013 All rights reserved.
Page 9
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
SST-4000 series
References
Project:
Shuweihat S1
Country: United Arab Emirates
Plant type:
CCPP 2x1/3x1
Conf.:
I40 (Desal)
Power:
254 MW
Frequency:
50 Hz
Number of units:
2
Com. operation:
2005
Project:
Hsinta
Country:
Plant type:
CCPP 2x1
Conf.:
I20 + L2x6.9
Power:
190 MW
Frequency:
60 Hz
Number of units:
5
Com. operation:
1999
Project:
Al Ezzel
Country:
Bahrain
Plant type:
CCPP 2x1/1x1
Conf.:
I30 + L2x6.3
Power:
238 MW
Frequency:
50 Hz
Number of units:
1
Com. operation:
2007
39 turbines1) with a total power output of 7.2 GW in operation or commissioning
1) Only
Siemens factory fleet
Unrestricted © Siemens AG 2013 All rights reserved.
Page 10
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
High efficiency and flexibility
SST-5000
- Wide application range
- CCPP and SPP applications
- Available for 50Hz and 60Hz applications
Unrestricted © Siemens AG 2013 All rights reserved.
siemens.com/answers
SST-5000 series
Features and Technology
Single crossover pipe
Efficient erosion
protection measures
Fabricated or cast inner
casing design for
optimized material
application
Combined stop
and control
valve
High-performance LP
blading for different sizes
of exhaust area
Compact
combined
HP/IP section
Low-level arrangement
with single-side or double
side exhaust
Spring
back seals
Fully 3-dimensional high
performance variable
reaction blading (3DVTM)
Push rod arrangement for
reduced axial clearances
Unrestricted © Siemens AG 2013 All rights reserved.
Page 12
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
SST-5000 series
References
Project:
Kårstø
Country:
Norway
Plant type:
CCPP 1S
Conf.:
HI30 + L2x12.5
Power:
156 MW
Frequency:
50 Hz
Number of Units:
1
Com. operation:
2008
Project:
Lakeside
Country:
USA
Plant type:
CCPP 2x1
Conf.:
HI50 + L2x8.7
Power:
246 MW
Frequency:
60 Hz
Number of Units:
1
Com. operation:
2007
Project: Norte Fluminense
Country:
Brazil
Plant type:
CCPP 3x1
Conf.:
HI50 + L2x10.3
Power:
287 MW
Frequency:
60 Hz
Number of Units:
1
Com. operation:
2004
112 turbines1) with a total power output of 25.9 GW in operation or commissioning
1) Only
Siemens factory fleet
Unrestricted © Siemens AG 2013 All rights reserved.
Page 13
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
High efficiency and operationa flexibility
SST-6000 series
-For SC and USC power plants
-Customer specific adaptation
-Available for 50Hz and 60Hz applications
Unrestricted © Siemens AG 2013 All rights reserved.
Unrestricted / © Siemens AG 2012. siemens.com/answers
All rights reserved.
SST-6000 –
For advanced steam parameters
HP & IP Valve
combinations
Single crossover pipe
High-level arrangement
with down exhaust
Barrel type
HP turbine
Single bearing
Fully 3-dimensional high performance
variable reaction blading (3DVTM)
Double-flow
IP turbine
Two double-flow LP turbines
Unrestricted © Siemens AG 2013 All rights reserved.
Page 15
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
SST-6000 series
References
Project:
Niederaußem K
Country:
Germany
Plant type:
SPP/USC
Conf.: H70 + I70 + L6x12.5
Power:
1027 MW
Frequency:
50 Hz
Number of Units:
1
Com. operation:
2002
Project:
Wai Gao Qiao 3
Country:
China
Plant type:
SPP/USC
Conf.: H75 + I60 + L4x12.5
Power:
1000 MW
Frequency:
50 Hz
Number of Units:
2
Com. operation:
2008
Project:
Longview
Country:
USA
Plant type:
SPP/SC
Conf.:
H60 + I50 + L4x8.7
Power:
784 MW
Frequency:
60 Hz
Number of Units:
1
Com. operation:
2011
185 turbines1) with a total power output of 85.3 GW in operation or commissioning
1) Only
Siemens factory fleet
Unrestricted © Siemens AG 2013 All rights reserved.
Page 16
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1
Disclaimer
This document contains forward-looking statements and information – that is, statements related to future, not
past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”,
“intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such statements are based
on our current expectations and certain assumptions, and are, therefore, subject to certain risks and
uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect its operations,
performance, business strategy and results and could cause the actual results, performance or achievements of
Siemens worldwide to be materially different from any future results, performance or achievements that may be
expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others,
from changes in general economic and business conditions, changes in currency exchange rates and interest
rates, introduction of competing products or technologies by other companies, lack of acceptance of new
products or services by customers targeted by Siemens worldwide, changes in business strategy and various
other factors. More detailed information about certain of these factors is contained in Siemens’ filings with the
SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov.
Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove
incorrect, actual results may vary materially from those described in the relevant forward-looking statement as
anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume
any obligation to update or revise these forward-looking statements in light of developments which differ from
those anticipated.
Trademarks mentioned in this document are the property of Siemens AG,
its affiliates or their respective owners.
Unrestricted © Siemens AG 2013 All rights reserved.
Page 17
May 2013
Dr. Stefan Brück
E F PR SU PQM PLM 1