NCP3063DFBCKGEVB_TEST_PROCEDURE.PDF - 34.0 KB

Test Procedure for the NCP3063 Buck – DFN
9/27/2006
Figure 1: Test Setup DFN
Table 1: Required Equipment
Voltage Supply (12V, 3A)
Voltage Meter
Test Procedure:
1. Connect the test setup as shown in Figure 1.
2. Apply an input voltage, Vcc = 12V
3. Apply Iout = 0mA load.
4. Check that Vout is 3.3V (3.25V – 3.35V)
5. Increase Iout load to 800mA
6. Check that Vout is 3.3V (3.25V – 3.35V)
7. Power down the load
8. Power down Vcc
9. End of test