Test Procedure for the NCP3063 Voltage Inverting – DFN 9/27/2006 Figure 1: Test Setup DFN Table 1: Required Equipment Voltage Supply (5V, 3A) Voltage Meter Test Procedure: 1. Connect the test setup as shown in Figure 1. 2. Apply an input voltage, Vcc = 5V 3. Apply Iout = 0mA load. 4. Check that Vout is -12V (-11.5V – -12.5V) 5. Increase Iout load to 100mA 6. Check that Vout is -12V (-11.5V – -12.5V) 7. Power down the load 8. Power down Vcc 9. End of test Electronic Load