EPCOS B88069X0260S102

Switching Spark Gap
SSG3X-1
Ordering code: B88069X0260S102
Nominal breakdown voltage VN
3000
V
Initial values 2)
Static breakdown voltage VS 1)
First ignition value VS, FTE after 24 hours in darkness
Following ignition values VS, FIV
≤ 3900
2550 ... 3540
V
V
Electrical life time 3)
Breakdown voltage VB
First ignition value VB, FTE after 24 hours in darkness
Following ignition values VB, FIV
≤ 4200
2400 ... 3600
V
V
Switching operations
at 0 ... +100 °C
1 000 000
Ignitions
Test circuit parameters
Open circuit voltage V0
Loading resistance R
Discharge capacitance C
Inductance L
Discharge peak current IP
4200
4000
1.5
7.5
50
V
kΩ
nF
µH
A
> 100
≤1
≤ 50
400
~2
MΩ
%
ns
Hz
g
General technical data
Insulation resistance at 100 V
Early ignition values below 2400 V
Breakdown time
Maximum switching frequency
Weight
Marking, red
3000 YY O
3000
YY
O
1)
2)
3)
- Nominal voltage
- Year of production
- Non radioactive
At delivery AQL 0,65 level II, DIN ISO 2859
Page 2, Fig. 1 and 2
Page 2, Fig. 3 and 4
KB AB E / KB AB PM
Issue 05, 16.06.2004-06-16
Page 1 of 2
Switching Spark Gap
SSG3X-1
Ordering code: B88069X0260S102
Fig. 1: QC- test circuit (100% outgoing inspection)
Fig. 2: Explanation of measurands
I = const
51kΩ
VS, FTE
VS, FIV
VS
DUT
0,22µF
VN
VS
t
ICU
- VN
DUT device under test
ICU
ignition control unit (sensitivity 10 .. 30 µA)
Discharge current 10 – 20 mA
Fig. 3: QC- test circuit (sampling inspection at 25 °C)
dVS/dt ~ dVN/dt
Fig. 4: Explanation of measurands
VB, FTE
L
R
VB, FTE
Range of VB, FIV
VB
Early ignition
VN
VO
C
DUT
VB
t
tI
1s
10 s
Not to scale
Dimensions in mm
Non controlled document
 EPCOS AG 2002. Reproduction, publication and dissemination of this data sheet, enclosures hereto and the information
contained therein without EPCOS' prior express consent is prohibited.
Purchase orders are subject to the General Conditions for the Supply of Products and Services of the Electrical and
Electronics Industry recommended by the ZVEI (German Electrical and Electronic Manufacturers' Association), unless
otherwise agreed.
KB AB E / KB AB PM
Issue 05, 16.06.2004
Page 2 of 2