EPCOS B88069X0220T502

Switching Spark Gap
SSG03X-1G
Ordering code: B88069X0220T502
Nominal breakdown voltage VN
350
V
Initial values 2)
Static breakdown voltage VS 1)
First ignition value VS, FTE after 24 hours in darkness
Following ignition values VS, FIV
≤ 470
298 ... 402
V
V
Electrical life time 3)
Breakdown voltage VB
First ignition value VB, FTE after 24 hours in darkness
Following ignition values VB, FIV
≤ 500
280 ... 420
V
V
Switching operations
at -40 ... +125 °C
400 000
Ignitions
Test circuit parameters
Open circuit voltage V0
Loading resistance R
Discharge capacitance C
Inductance L
Discharge peak current IP
500
20
330
0.4
~ 300
V
kΩ
nF
µH
A
> 100
≤4
≤ 50
100
~2
MΩ
%
ns
Hz
g
General technical data
Insulation resistance at 100 V
Early ignition values 200 ... 280 V
Breakdown time
Maximum switching frequency
Weight
350 YY O
Marking, red
350
YY
O
1)
2)
3)
- Nominal voltage
- Year of production
- Non radioactive
At delivery AQL 0,65 level II, DIN ISO 2859
Page 2, Fig. 1 and 2
Page 2, Fig. 3 and 4
AB E / AB PM
Issue 03, 30.04.2002
Page 1 of 2
Switching Spark Gap
SSG03X-1G
Ordering code: B88069X0220T502
Fig. 1: QC- test circuit (100% outgoing inspection)
Fig. 2: Explanation of measurands
I = const
51kΩ
VS, FTE
VS, FIV
VS
DUT
0,22µF
VN
VS
t
ICU
- VN
DUT device under test
ICU ignition control unit (sensitivity 10 .. 30 µA)
Discharge current 10 – 20 mA
Fig. 3: QC- test circuit (sampling inspection at 25 °C)
dVS/dt ~ dVN/dt
Fig. 4: Explanation of measurands
VB, FTE
L
R
VB, FTE
Range of VB, FIV
VB
Early ignition
VN
VO
C
DUT
VB
t
tI
1s
10 s
Not to scale
Dimensions in mm
Non controlled document
 EPCOS AG 2002. Reproduction, publication and dissemination of this data sheet, enclosures hereto and the information
contained therein without EPCOS' prior express consent is prohibited.
Purchase orders are subject to the General Conditions for the Supply of Products and Services of the Electrical and
Electronics Industry recommended by the ZVEI (German Electrical and Electronic Manufacturers' Association), unless
otherwise agreed.
AB E / AB PM
Issue 03, 30.04.2002
Page 2 of 2