ADAM-5510 Series Startup Manual

ADAM-5510 Series
PC Based Programmable
Controller
Startup Manual
Part No. 2003551010
1st Edition
Printed in Taiwan
August 2004
Table of Contents
1 System Requirements...................................... 1
1.1 Host Computer Requirements ..................................... 1
1.2 ADAM-5510 Series Requirements ............................. 1
1.3 I/O Module Requirements........................................... 2
2 Hardware Installation..................................... 3
2.1 Power Wiring .............................................................. 3
2.2 Programming Port Wiring........................................... 4
2.3 Jumper Settings ........................................................... 5
3 I/O Module Configuration.............................. 6
3.1 Install ADAM-5510 Series Utility .............................. 6
3.2 Config. I/O Modules by ADAM-5510 Series Utility.. 7
4 Application Execution at Bootup................. 13
ADAM-5510 Series Startup Manual
ii
1 System Requirements
1.1 Host Computer Requirements
• IBM PC compatible computer with 486 CPU (Pentium is recommended).
• Microsoft Windows 95/98/NT4.0 SP4/2000 or higher versions.
• Borland C++ 3.0 for DOS
• At least 32 MB RAM.
• 20 MB of hard disk space available
• VGA color monitor.
• CD-ROM.
• Mouse or other pointing devices.
• At least one standard RS-232 port (e.g. COM1, COM2).
1.2 ADAM-5510 Series Requirements
• One ADAM-5510 Series main unit, i.e., ADAM-5510M, ADAM5510E, ADAM-5510/TCP or ADAM-5510E/TCP.
• One ADAM-5510 Series Startup Manual
• One core clamp for power supply connection.
• One ADAM Products Utilities CD.
• Power supply for ADAM-5510 Series (+10 to +30 VDC unregulated)
• One RS-232 straight through DB-9 cable
• One null modem adaptor or cable with DB-9 connectors
1
ADAM-5510 Series Startup Manual
1.3 I/O Module Requirements
At least one I/O module is needed to use the system. A variety of I/O
modules are available to meet different application requirements. Table
1.1 gives a current listing of these modules for your reference.
Table 1.1: I/O Module Support List
Module
Analog I/O
Digital I/O
Name
Specification
Reference
ADAM-5013
3-ch. RTD input
Isolated
ADAM-5017
8-ch. AI
Isolated
ADAM-5017H
8-ch. High speed AI
Isolated
ADAM-5018
7-ch. Thermocouple input
Isolated
ADAM-5024
4-ch. AO
Isolated
ADAM-5050
7-ch. D I/O
Non-isolated
ADAM-5051
16-ch. DI
Non-isolated
ADAM-5051D
16-ch. DI w/LED
Non-isolated
ADAM-5051S
16-ch. Isolated DI w/LED
Isolated
ADAM-5052
8-ch. DI
Isolated
ADAM-5055S
16-ch. Isolated DI/O w/LED
Isolated
ADAM-5056
16-ch. DO
Non-isolated
ADAM-5056D
16-ch. DO w/LED
Non-isolated
ADAM-5056S
16-ch. Isolated DO w/LED
Isolated
ADAM-5056SO 16-ch. Iso. DO w/LED (source)
Isolated
ADAM-5060
6-ch. Relay output
Isolated
ADAM-5068
8-ch. Relay output
Isolated
ADAM-5069
8-ch. Power Relay output
Isolated
Counter/FrequencADAM-5080
4-ch. Counter/Frequency
Isolated
Serial I/O
4-port RS232
Non-isolated
Relay Output
ADAM-5090
ADAM-5510 Series Startup Manual
2
2 Hardware Installation
2.1 Power Wiring
Power Supply +
+10~+30 Vdc -
3
ADAM-5510 Series Startup Manual
2.2 Programming Port Wiring
Straight Through Cable
PC
RS-232
COM3
(Prog. Port)
Analog Input
Analog Output
Digital Input
Digital Output
PC COM Port
CD
RX
TX
DTR
GND
DSR
RTS
CTS
RI
Straight Through Cable
1
2
3
4
5
6
7
8
9
ADAM-5510 Series Startup Manual
ADAM-5510 Series COM3
1
2
3
4
5
6
7
8
9
4
N/A
TX
RX
N/A
GND
N/A
N/A
N/A
N/A
2.3 Jumper Settings
DIP Switch of ID Address:
DIP
SW1
SW2
SW3
SW4
SW5
ON
1
2
4
8
16
OFF
0
0
0
0
0
ID Address = Value of (SW1+SW2+SW3+SW4+SW5)
COM Port Selection for Configuration Tool:
DIP
SW6
ON
COM1/RS-232
OFF
COM2/RS-485
SW7 and SW8 are reserved for future use.
5
ADAM-5510 Series Startup Manual
3 I/O Module Configuration
3.1 Install ADAM-5510 Series Utility
1.
Insert the ADAM Products CD and setup the ADAM-5510 Series
Utility.
2.
After the ADAM-5510 Series Utility has been installed, you will
find two directories under “C:\Program Files\Advantech\” directory. They are named “ADAM-5510M-5510E Utility” and
“ADAM-5510TCP-5510ETCP”.
If you are using ADAM-5510M or ADAM-5510E, you have to use
the files under the “ADAM-5510M-5510E Utility” directory.
If you are using ADAM-5510/TCP or ADAM-5510E/TCP, you
have to use the files under the “ADAM-5510TCP-5510ETCP Utility” directory.
The directory structure is shown below:.
ADAM-5510 Series Startup Manual
6
3.2 Configure I/O Modules by ADAM-5510 Series Utility
The following steps will use ADAM-5510/TCP as an example to demonstrate how to configure the ADAM-5017 Analog Input Module.
1.
Please click the “Program” directory under “ADAM-5510TCP5510ETCP Utility” and run “ADAM5510.EXE”, which is the
ADAM-5510 Series Utility. You will see the following figure.
2.
Click the refresh button to check if the drive D: of ADAM5510TCP is detected correctly.
7
ADAM-5510 Series Startup Manual
3.
Click the refresh button to check if the D drive of ADAM5510TCP is detected correctly.
4.
Download the I/O Module Configuration Tool “SIMU5KE.EXE”
under the “Config” directory onto drive D: of ADAM-5510/TCP.
ADAM-5510 Series Startup Manual
8
5.
Set DIP SW6 as ON.
COM Port Selection for Configuration Tool:
DIP
SW6
ON
COM1/RS-232
6.
Set DIP SW1 to SW5 as OFF.
ID Address = 0
DIP
SW1
SW2
SW3
SW4
SW5
OFF
0
0
0
0
0
7.
Run “SIMU5KE.EXE” and check the Communication Tool does
use COM1/RS-232 port.
9
ADAM-5510 Series Startup Manual
8.
Connect the Host PC to COM1/RS-232 on ADAM-5510/TCP by a
null modem cable.
PC
RS-232
Null modem cable
COM1 RS 232
Analog Input
Analog Output
Digital Input
Digital Output
PC COM port
CD
RX
TX
DTR
GND
DSR
RTS
CTS
RI
Null modem cable
1
2
3
4
5
6
7
8
9
ADAM-5510 Series Startup Manual
ADAM-5510 Series COM1
1
2
3
4
5
6
7
8
9
10
CD
RX
TX
DTR
GND
DSR
RTS
CTS
RI
9.
Insert the ADAM Products CD and setup the ADAM-4000-5000
Utility.
10.
Close the ADAM-5510 Series Utility and run ADAM-4000-5000
Utility “ADAM40005000.EXE”.
11
ADAM-5510 Series Startup Manual
11.
Search the ADAM-5510/TCP Module and configure the input
range of the ADAM-5017 Analog Input Module.
12.
Close the ADAM-4000-5000 Utility and reset the ADAM-5510/
TCP.
ADAM-5510 Series Startup Manual
12
4 Application Execution at Bootup
The following steps will demonstrate how to automatically execute an
application after bootup. All that needs to be done is to update “AUTORUN.BAT” and run “DHCPSTAT.EXE” automatically after boot up.
1.
Download the “DHCPSTAT.EXE” onto ADAM-5510/TCP.
2.
Edit “AUTORUN.BAT” under “Source\Drive_D\Default_Files”
directory.
13
ADAM-5510 Series Startup Manual
3.
Update “AUTORUN.BAT” to ADAM-5510/TCP in the utility.
4.
Reset ADAM-5510/TCP and check if the “DHCPSTAT.EXE” has
been executed correctly.
5.
You are finished!
ADAM-5510 Series Startup Manual
14