View PDF

INITIAL PRODUCT/PROCESS CHANGE NOTIFICATION
Generic Copy
12-Mar-2009
SUBJECT: ON Semiconductor Initial Product/Process Change Notification #16229
TITLE: NCP3420 Gresham Fab Qualification and Copper Wire Qualification Notification
PROPOSED FIRST SHIP DATE: 12-Jul-2009
AFFECTED PRODUCT DIVISION: CCPG
FOR ANY QUESTIONS CONCERNING THIS NOTIFICATION:
Contact your local ON Semiconductor Sales Office or David Chu < [email protected] >
NOTIFICATION TYPE:
Initial Product/Process Change Notification (IPCN)
First change notification sent to customers. IPCNs are issued at least 120 days prior to implementation
of the change. An IPCN is advance notification about an upcoming change and contains general
information regarding the change details and devices affected. It also contains the preliminary
reliability qualification plan.
The completed qualification and characterization data will be included in the Final Product/Process
Change Notification (FPCN).
This IPCN notification will be followed by a Final Product/Process Change Notification (FPCN) at
least 90 days prior to implementation of the change.
DESCRIPTION AND PURPOSE:
ON Semiconductor is qualifying the NCP3420 on a second fab process, Gresham ONBCD25.
The products affected will be dual sourced from both TSMC and Gresham.
ON Semiconductor is qualifying the use of copper wire on the NCP3420. The wire-bonding
for the affected devices will be dual sourced and will use either gold or copper wire.
Issue Date: 12-Mar-2009
Rev.07-31-07
Page 1 of 4
Initial Product/Process Change Notification #16229
QUALIFICATION PLAN:
Gresham Qualification Plan
1. High Temp Op Life (125 ˚C Tj, Dynamic) 3 lots/vehicle
Demonstrate ≤1000 FIT
2. High Temp Storage (150 ˚C)3 lots/vehicle X 80 units/lot
504, 1008 hrs.
3. Pre-Conditioning MSL
3 lots/vehicle X 240 units/lot
4. HAST (130 ˚C/85%RH)
3 lots/vehicle X 80 units/lot
96 hrs.
5. Autoclave (121 ˚C/100%RH/15PSIG)3 lots/vehicle X 80 units/lot
96 hrs.
6. Temp Cycling (-65 ˚C to +150 ˚C)3 lots/vehicle X 80 units/lot
500, 1000 cycles
7. External Visual Inspection
All Units
8. Wire Bond Pull Strength
3 lots
9. Bond Shear Test
3 lots
10. ESD - Human Body Model
3 lots
11. ESD - Machine Model
3 lots
12. Latch-Up
3 lots
13. Characterization: A minimum of 30 packaged units from each of the three
qualification lots are to be characterized across the full temperature range of the
device as documented in the datasheet
Issue Date: 12-Mar-2009
Rev.07-31-07
Page 2 of 4
Initial Product/Process Change Notification #16229
Copper Wire Qualification Plan
#
TEST
1
Prep
2
Initial
Electrical
NAME
Sample preparation
and initial part testing
Initial Electrical Prior
To PC
3
HTOL
High Temp Op Life
4
PC
Preconditioning MSL 1
5
HAST+P
C
Highly Accelerated
Stress Test
6
TC+PC
Temp Cycling+
preconditioning
7
AC+PC
Autoclave+
preconditioning
8
HTSL
High Temp Storage
Life
9
RSH
Resistance to Solder
Heat
10
DPA
DeProcessing
Analysis
11
ED
Tri-Temp Electrical
Characterization
12
TR
Thermal Resistance
13
Yield
Wirebond Related
Yield Analysis
14
BPS
Bond Pull Strength
15
BS
Bond Shear
Issue Date: 12-Mar-2009
TEST
CONDITIONS
END POINT
REQUIREMENTS
SS x No.
Lots
various
---
All
---
----
All
c = 0, Room
80 x 3 lots
c = 0, Room
240 x 3 lots
c = 0, Room
80 x 3 lots
c = 0, Room
80 x 3 lots
c = 0, Room
80 x 3 lots
c = 0, Room
80 x 3 lots
N/A
30 x 3 lots
Ta=125°C for
1008hrs (JA108)
J STD 020A , JA
113 IR reflow at
260°C,
HAST, TC, AC
Temp = +130°C;
RH = 85%, psig
~28 with bias**
for 96hrs (JA110)
Temp = -65°C to
+150°C; for 500
cycles (JA104B)
121°C/100%
RH/15 PSIG for
96 hrs (JA102)
Ta=150°C for
1008hrs (JA103)
TS=260C,
Tdwell=10 sec.
Test after RSH.
SMD devices are
fully submerged
during test.
(JESD22 B-106)
Post HAST+PC,
post TC+PC, and
post AC+PC
Characterization
of all parameters
Provide thermal
comparison data
to ensure spec
compliance
per assembly
MRB procedure
M2011
Condition C or D
AEC-Q100-001
Rev.07-31-07
2 x 3 lots
Room, Hot, Cold
30 units
x 3 lots
10 units
x 1 eval lot
+ 1 cont lot
All units x 3
lots
30 bonds on min.
5 units
30 x 3 lots
30 bonds on min.
5 units
30 x 3 lots
Page 3 of 4
Initial Product/Process Change Notification #16229
AFFECTED DEVICE LIST:
NCP3420DR2G
NCP3420MNR2G
Issue Date: 12-Mar-2009
Rev.07-31-07
Page 4 of 4