View PDF

FINAL PRODUCT/PROCESS CHANGE NOTIFICATION #20385
Generic Copy
Issue Date: 06-Mar-2014
TITLE: Addition of ASE Shanghai, China and Amkor P3, Philippines as qualified assembly sites for
Filter & Protection devices in DFN packages
PROPOSED FIRST SHIP DATE: 06-Jun-2014 or earlier with customer approval
AFFECTED CHANGE CATEGORY(S): ON Semiconductor Assembly Site
FOR ANY QUESTIONS CONCERNING THIS NOTIFICATION:
Contact your local ON Semiconductor Sales Office or Mike Begonia <[email protected]>
SAMPLES: Contact your local ON Semiconductor Sales Office
ADDITIONAL RELIABILITY DATA: Available
Contact your local ON Semiconductor Sales Office or Francis Lualhati <[email protected]>
NOTIFICATION TYPE:
Final Product/Process Change Notification (FPCN)
Final change notification sent to customers.
implementation of the change.
FPCNs are issued at least 90 days prior to
ON Semiconductor will consider this change approved unless specific conditions of acceptance are
provided in writing within 30 days of receipt of this notice. To do so, contact <[email protected]>.
DESCRIPTION AND PURPOSE:
This is the final notification announcing that ON Semiconductor has qualified its Filter & Protection
devices in DFN package (please refer to the list of affected general parts section for complete device
list), for assembly at ASE Shanghai factory located in the China and at Amkor P3, located in the
Philippines. Both sites are ISO/TS16949:2009 certified and have already been qualified and utilized
by ON Semiconductor.
Two devices have been identified as qualification vehicle, based on the package dimension, die size
and volumes. Reliability testing and full electrical characterization over temperatures were performed
to ensure device functionality and electrical specifications are met.
Upon expiration or approval of the FPCN, devices listed in this final PCN will have ASE Shanghai as
additional assembly site. Customer may receive devices assembled in our in-house Seremban,
Malaysia assembly facilities; UTAC, Thailand, Amkor P3 Philippines and ASE Shanghai after that.
The location of the assembly sites can be identified by the marking of the date code
Issue Date: 06-Mar-2014
Rev. 06-Jan-2010
Page 1 of 3
FINAL PRODUCT/PROCESS CHANGE NOTIFICATION #20385
RELIABILITY DATA SUMMARY:
Qual Vehicle: EMI4183MUTAG
Qualification Results and Analysis:
Test:
HTRB
HTSL
TC-PC
HAST-PC
Autoclave-PC
Conditions:
TA=150°C, 80% rated voltage
TA = 150°C
Ta= -65 C to 150 C
Ta=130C RH=85%,
Ta=121C RH=100% ~15 psig
Interval:
1008 hrs
1008 hrs
1000 cyc
96 hrs
96 hrs
Results
0/240
0/240
0/240
0/240
0/240
Conclusion: All reliability requirements have been met.
Qual Vehicle for ESDR0502MNTBG: MG2040MUTAG
Qualification Results and Analysis:
Test:
Conditions:
Interval:
HTRB
TA=150°C, 80% rated voltage 1008 hrs
HTSL
TA = 150°C
1008 hrs
TC-PC
Ta= -65 C to 150 C
1000 cyc
HAST-PC
Ta=130C RH=85%,
96 hrs
Autoclave-PC
Ta=121C RH=100% ~15 psig 96 hrs
Results
0/240
0/240
0/240
0/240
0/240
Conclusion: All reliability requirements have been met.
Additional Qualification Requirement for ESDR0502MNTBG
Test:
Conditions:
Interval:
TC-PC
Ta= -65 C to 150 C
1000 cyc
Results
0/240
Conclusion: All reliability requirements have been met.
CHANGED PART IDENTIFICATION:
1.
Marking of the month date codes:
Seremban Malaysia assembled devices: M
UTAC Thailand assembled devices:
Amkor P3 assembled devices:
ASE Shanghai assembled devices:
Issue Date: 06-Mar-2014
Rev. 06-Jan-2010
Page 2 of 3
FINAL PRODUCT/PROCESS CHANGE NOTIFICATION #20385
List of affected General Parts:
Device
EMI4183MUTAG
EMI4182MUTAG
EMI4183MTTAG
EMI4182MTTAG
EMI4192MTTAG
EMI2121MTTAG
EMI2124MTTAG
ESDR0502NMUTBG
Note:
SBN
E
E
E
E
E
E
E
E
UTAC
E
E
E
E
E
E
E
Amkor
E
E
E
E
E
E
E
N
ASE
N
N
N
N
N
N
N
N
E – Existing Assembly Site
N – New Assembly Site
Issue Date: 06-Mar-2014
Rev. 06-Jan-2010
Page 3 of 3