MSK PRODUCT COMPARISON CHART Test Flow or Requirement MIL-STD-883 Test Method Certification Qualification (QML Listing) No Element Evaluation Clean Room Processing Ultrasonic Inspection, TM 2030 Wirebond Process Control No Yes A/R Yes Hermetic Class H Yes QML Note Yes Yes A/R Yes Non Destruct Bond Pull Sample, TM 2023 Yes Yes No Yes No Yes Yes Industrial Yes Yes No No No No Yes Yes Yes Yes Yes Class H Yes Yes Yes Yes A/R Optional Yes 160 Hours Yes Full Temp Yes Yes No Hermetic Class K Yes QML Note Yes Yes A/R Yes Yes 100% Yes Yes Yes Yes Yes Class K Yes Yes Yes Yes Yes Yes Yes 320 Hours Yes Full Temp Yes Yes Yes Yes Yes Yes PI Note PI Note Yes (QCI) Certified Operators Mil Line Processing Max Rework Specified Pre-Seal Electrical Pre-Cap Visual, TM 2017 Pre-Seal Vacuum Bake Fine Leak Test (Process Control) Temperature Cycle, TM 1010 Constant Acceleration, TM 2001 PIND Test, TM 2020 Electrical Test Burn-In, TM 1015 Final Electrical Test/In Line Gp A Fine Leak, TM 1014 Gross Leak, TM 1014 XRAY, TM 2012 External Visual, TM 2009 Periodic Inspection Hermetic Industrial No No Yes 25°C No Yes (No Bomb) No Yes Sample No Hermetic Class V Yes QML Note Yes Yes A/R Yes Yes 100% Yes Yes A/R A/R Yes TM 2010 Yes Yes Yes Yes Yes Yes Reverse BIAS A/R Yes 240 Hours Yes Full Temp Yes Yes Yes PEMs Industrial No PEMs Class H Similar No No No No Yes A/R Yes Yes Yes Yes Yes Yes Yes No Yes No Yes Yes Industrial No No No No No No Yes Yes Yes Yes Yes Class H No No Yes No No Optional Yes 160 Hours Yes 25°C Full Temp Sample No No No Yes Sample PI Note No Yes 25°C No No No Yes Sample No QML Note: MSK has QML tested over 50 product types and has many processes and materials QML qualified. Contact MSK for latest QML status for specific products. Periodic Inspection Note: Contact MSK for latest Periodic Inspection (Group C) status for specific products. In-line Group A, B and D performed. Additional screening and testing available upon request. 10/13 Rev B