RJ45 TERMINATION INSTRUCTIONS NON-SHIELDED CABLE COMPONENTS STEP 4: Flatten conductors, cut the conductors straight, and insert the conductors into the load bar. STEP 1: Strip cable jacket approximately 1¼ inches [31.75mm]. STEP 2: Organize conductors. STEP 3: Maintain twists near the cable jacket. STEP 5: Push the load bar up against the twists. STEP 6: Cut the conductors flush to approximately ½ inch [12.7mm]. STEP 7: Pull the load bar to the end of the conductors. 0.5 STEP 8: Insert the plug housing. Push forward until the conductors engage their openings. STEP 9: When the conductors are fully in their openings, the plug is ready to terminate. STEP 10: Terminate/crimp the plug with one of the recommended tools (see customer drawing). TERMINATED PLUG