USING SSRs ON SATURABLE INDUCTIVE
LOADS PARTICULARLY PRIMARY WINDINGS
OF TRANSFORMERS.
Driving
a saturable inductive load often generates high peaks of voltage which may damage sem conductors used
in ssrs.
I - WORKING ANALYSIS :
a) Non-saturable induction coil
It is preferable to control the induction of the induction coil at the maximum of the sine wave (peak
starting) up to zero crossing (zero cross relay).
FIGURE 1:peak starting,
no current surge
di/dt=Umax/L
Umax
Imax
FIGURE 2:zero cross starting
current surge =2Imax
2Imax
i(t)
i(t)
t
0
0
u(t)
t
di/dt=0
u(t)
b) Saturable induction coil
Reminders :
Voltage u = -dØ/dt
Ø=BS
B=µH
H=nI/l
(i=winding current)
In permanent operation, the magnetic field H (proportional to the current) i varies according to the
induction B according to Hyseresis cycle (fig 3), B is in quadrature with respect to U.
According to the stopping instant of the current, a residual induction persists (+BR -BR). The conduction
instant is therefore of prime importance as saturation (Bsat) of the iron can be easily reached and gives
rise to a significant increase of i.(u decreases).I may reach 100In.

celduc
www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 3/ 8 GB
FIGURE 3:hysteresis cycle
B(t)
Bsat
Br
-Hsat
0
H(t)
Hsat
-Br
-Bsat
b-1 Zero crossing start : Example : control by zero cross SSR (zero cross)
Two cases can occur.
Case n°1 : The starting is performed on the same half cycleas the previous stop.
mains
voltage
0
t
solid state
relay
control 0
t
Voltage
on the
load
0
t
Induction
B(t)
The induction goes
to 2Bn+Br and
practically exceeds
Bsat in all cases
+Bsat
+Br
0
t
Very high current surge
Current
in the
load
i(t) 0
t
di/dt=0
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 4/ 8 GB
In most of cases, the Bsat saturation induction is reached. The amplitude of the current
(proportional to H), becomes very high.
.
This type of control produces the most surges
Case n°2 : In order to decrease this current surge, it is preferable to have full cycles. The starting only
takes place on the half cycle opposite that of the stop.
=> With a use of a zero cross solid state relay, the stopping phase and the starting phase must therefore be
known to send the control.
Mains
voltage
0
t
solid state
relay
control 0
t
Voltage
on the
load
0
t
Induction
B(t)
The induction goes
to 2Bn-Br and very
often exceeds Bsat.
+Bsat
-Br
0
t
Less current surge with respect
to case n°1 but still very high
Current
in the
load
i(t) 0
di/dt=0
t
The induction reached is less important but often exceeds ahigh current surge remains.
It results that zero cross starting must be avoided on this type of load.
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 5/ 8 GB
If the transformer is on load, the magnetising current value also takes on the secondary current brought to
the primary winding which is weighted in the established rating but which can require zero cross switching
in transient rating. This is the case of transformers secondary windings loaded with capacitors and where
switching on at zero crossing is preferable.
In this case, it is necessary to adapt the rating of the SSR to the max. currents likely to be reached on
starting.
This must therefore be checked with the curve Itsm = f(t) repetitively.
Surge current Itsm (A peak) = f(t) for 125A models with Itsm =2000A
2000
Itsm (Apeak)
No repetitive Itsm (Apeak)=f(t) without voltage reapplied
1500
1000
500
Repetitive Itsm (Apeak)=f(t)
with voltage reapplied for initial Tj =70°C
0
0,01
0,1
1
t (s)
10
Extreme example : with a relay of 125 A. With a surge of 20ms, the relay can withstand approximately
1000A about.
On a transformer, taking 100In at starting, the max. pilot controlable current with this relay would be 10A
i.e. 4KV in 400VAC.
Note : on low loads, (small transformers...) the component R reduces the significant
current peaks.
With a so-called (Random) solid state relay
The making occurs at any point of the sine wave. The probability of zero cross starting is less than at the
peak. This type of relay is preferable to a zero cross relay, however, as the control is random, the current
peaks are too. Starts can be optimised with the right control using this type of relays.
With standard SSRs, it is preferable to use random relays, but in
all cases, the rating of the SSR should be oversized.
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 6/ 8 GB
OTHER SOLUTIONS :
Peak starting
Two cases can occur
Case n°1 : Tha starting takes place at the peak but on the same half cycle as that of the previous stop.
Mains
voltage
0
t
solid state
relay
control 0
t
Voltage
on the
load
0
t
Induction
B(t)
The induction goes
to Bn+Br and
sometimes exceeds
Bsat.
+Bsat
+Br
0
t
Current
in the
load
i(t) 0
Small current surge
if Bsat is exceeded.
t
In this type of control, in the most unfavourable case, the max. induction reaches Bn+Br.
In general, Bsat is not reached, and current stays within the allowable proportions. This type of relay
is developped by celduc with the ref SCP. Model 230V and 400VAC 40Amp, and can be produced
upon request up to 125 Amps.
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 7/ 8 GB
Case n°2 :The starting takes place at the peak but on the half cycle opposite that of the stop.
In the case of the use of a "peak starting" relay : celduc SCP relay without phase angle control (case n°1).
This case ocurs 1 out of 2 times (statistically).
Mains
voltage
0
t
Solid state
relay
control
0
t
Voltage
on the
load
0
t
Induction
B(t)
+Bsat
The induction reaches Bn-Br.
0
-Br
t
-Bsat
Current
in the
load
i(t) 0
No surge current.
t
Small current surge
may appear on the
second
cyclehalf
Note: If a transformer is very near Bsat at In, a small current surge may take place
on thehalf
second
cycle.
This is a good control for a transformer : peak starting+full cycles.
A peak starting relay allows for the starting current of a transformer to be reduced
which avoids protection devices from breaking. Mains microcuts must, nonetheless,
be accounted for.
The solid state relay must reesist the allowable peak current in the worst of condition
(zero cross control).
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19
S/GEN/TRANSFO/B/07/01/2002
page 8/ 8 GB
Soft start relay.
Another solution entails a soft start of the transformer.
Tension accross the
terminals of the load
Network
voltage
0
t
Current in the load
0
t
the SSR is lit up at the end of the half cycle and gradually offset until the full half cycle.
With a mora or less fast variation speed ramp, thje transformer and its load are gradually supplied without
current surge.
This process can be provided by a proportional controller relay by celduc,
type SG4 controller.
The new range of SMCW SOFT START three phase relays also allow for the starting
of three phase transformers.
To ensure correct operation of these devices, it is nonetheless, necessary to have a minimum load on the
transformer ( a transformer at no load presents problems for the zero crossing of the relays). See the
special application notes (SMCW on transformers).
celduc

www.celduc.com
r e l a i s
Rue Ampère B.P. 4
42290 SORBIERS - FRANCE
E-Mail : [email protected]
Fax +33 (0) 4 77 53 85 51
Service Commercial France Tél. : +33 (0) 4 77 53 90 20
Sales Dept.For Europe Tel. : +33 (0) 4 77 53 90 21 Sales Dept. Asia : Tél. +33 (0) 4 77 53 90 19